Town of Chestertown, MD · pop. 6K
Mon16Nov
Zoning Board of Appeals
Mon Nov 16 · 6 days ago
This agenda in plain words
Leer en españolThis is a public hearing of the Zoning Board of Appeals, held at 1:00 p.m. on Monday, November 16, 2026, at the Chestertown Town Office. The main item is a request from UH 98 Cannon, LLC to build a replacement building at 98 Cannon Street closer to the water than the town's rules normally allow. Members of the public are invited to attend and comment.
- A request from UH 98 Cannon, LLC for a variance from the 25-foot setback rule in the Critical Area Ordinance, to build a building and deck 13 feet into the 25-foot Modified Buffer Area at 98 Cannon Street. The old building was damaged by fire and is unstable. The new building will hold a restaurant and a 10-room inn. Touches: The owners of 98 Cannon Street, and people near the property or interested in the restaurant and inn.The public may speak p. 1
Words on this agenda, explained
- Variance
- Permission to depart from a town rule that normally applies to a property, granted by the board when the owner shows a special need.
- Modified Buffer Area (MBA)
- A strip of land near the water where the town limits how close new buildings can be built.
- Critical Area Ordinance
- The town law that sets rules to protect land and water near the Chesapeake Bay shoreline.
- Public hearing
- A meeting time when the public is allowed to speak about an item before a decision is made.
Written by AI from the agenda, Nov 14. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
1 item on this agenda matches the land-use topicsVariances (1)
Agenda items (1)Show only the 1 matching
- NOTICE TO THE PUBLIC The Chestertown Zoning Board of Appeals will conduct a public hearing on the application of UH 98 Cannon, LLC requesting a variance of the 25-foot Modified Buffer Area (MBA) redevelopment setback standard of the Town’s Critical Area Ordinance (Part 4, Section B(3(b)), to encroach 13 feet into the MBA to construct a building and deck at the property located at 98 Cannon Street. The existing structure, which was damaged by fire and rendered structurally unstable, extends farther into the MBA than the encroachment proposed for the replacement building. The proposed replacemen… p. 1