Agendagrandforksgov.comAgendaAG COW 20261123AgendaRequest from Red River Softball, LLC, for modifiAgendaBudget Amendment - Prairie Dog FundAgendaBid Award Project No. 9113, Alerus ScoreboardsAgendaBid SummaryAgendaAJP Detailed BreakdownAgendaDaktronics ProposalAgendaLucent HD ProposalAgendaPlans & Specs Project No. 8989 Gateway Dr. and NAgendaBid Award for Project No. 9071 2026 Lead ServiceAgendaUpdates to City Code Sections relating to BuildiAgendaOrdinance amendment relating to International BuAgendaOrdinance amendment relating to International MeAgendaOrdinance amendment relating to International FiAgendaOrdinance enacting City Code Chapter XIX, BuildiAgendaOrdinance enacting City Code Chapter XIX, BuildiAgendaBid#2026-4, Public Works Landfill Division Mid-SAgendaBid #2026-5, Public Works Landfill Division FronAgendaEngineering Services Agreements for City ProjectAgendaEngineering Services Agreements for City ProjectAgendaEngineering Services Agreements for City ProjectAgendaRequest from Red River Softball, LLC, for modifiAgendaBudget Amendment - Prairie Dog FundAgendaBid Award Project No. 9113, Alerus ScoreboardsAgendaBid SummaryAgendaAJP Detailed BreakdownAgendaDaktronics ProposalAgendaLucent HD ProposalAgendaPlans & Specs Project No. 8989 Gateway Dr. and NAgendaBid Award for Project No. 9071 2026 Lead ServiceAgendaUpdates to City Code Sections relating to BuildiAgendaOrdinance amendment relating to International BuAgendaOrdinance amendment relating to International MeAgendaOrdinance amendment relating to International FiAgendaOrdinance enacting City Code Chapter XIX, BuildiAgendaOrdinance enacting City Code Chapter XIX, BuildiAgendaBid#2026-4, Public Works Landfill Division Mid-SAgendaBid #2026-5, Public Works Landfill Division FronAgendaEngineering Services Agreements for City ProjectAgendaEngineering Services Agreements for City ProjectAgendaEngineering Services Agreements for City Project
Minutesafter the meeting
Meeting page ↗grandforksgov.comAdd to calendar.ics for Outlook, Google, AppleThis agenda in plain words
Leer en españolThis is a Committee of the Whole meeting of the Grand Forks City Council on Monday, November 23, 2026, at 5:30 p.m. in the Council Chambers at City Hall. It is a discussion meeting with no informational items, and the agenda lists items on a liquor license change, a budget change, bids, project plans, and changes to building and fire codes.
- A request from Red River Softball, LLC, to change its alcoholic beverage license (Class 8.4). Touches: Red River Softball, LLC. p. 1
- A change to the budget for the Prairie Dog Fund. p. 1
- Award of a bid for Project No. 9113, Alerus Scoreboards. Bid summary and proposals from AJP, Daktronics, and Lucent HD are attached. p. 1
- Plans and specifications for improvements at the Gateway Dr. and N Columbia Rd intersection. Touches: Drivers using the Gateway Dr. and N Columbia Rd intersection. p. 1
- Award of a bid for the 2026 Lead Service Line Replacement project. Touches: Water customers with lead service lines. p. 1
- Changes to city code on building rules: the International Building Code and Residential Code, the Mechanical and Fuel Gas Code, the Fire Code, and new chapters for the Energy Conservation Code and the Existing Building Code. Touches: Builders, property owners, and contractors. p. 2
- Award of bids to rebid two Public Works landfill division machines: a mid-size excavator and a front end loader. p. 2
- Engineering services agreements for City Project No. 9216, upgrades to the sanitary stations. p. 2
- Engineering services agreements for City Project No. 9217, upgrades to the flood stations. p. 2
- Engineering services agreements for City Project No. 9218, upgrades to the storm stations. p. 2
Words on this agenda, explained
- Committee of the Whole
- A meeting where all council members talk through items together. Votes are usually taken at a later council meeting.
- Class 8.4 Alcoholic Beverage License
- A type of liquor license that the city issues to a business, here changed at the request of Red River Softball, LLC.
- Bid award
- The city picks a company to do a job, usually the one that offered the best bid.
- Plans & Specs
- The drawings and written rules that describe how a construction project must be built.
- Engineering Services Agreements
- Contracts with engineering firms to design or manage a city project.
- Ordinance
- A local law passed by the city council.
Written by AI from the agenda, Nov 21. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
8 items on this agenda match the land-use topicsVariances (4), Data centers & plants (2), Water & sewer (2)
Agenda items (66)Show only the 8 matching
- S:\9113 Alerus Center Scoreboard Replacement\Staff Reports\Bids\9113 Bids.doc City of Grand Forks Staff Report Committee of the Whole – November 23, 2026 City Council – December 7, 2026 Agenda Item: Bids for City Project No. 9113 – Alerus Center Scoreboard Replacement Submitted by: Engineering Department, Christian Danielson, PE (City Engineer) Staff Recommended Action: Reject bids from SNA and Uber Displays, Award project to Daktronics in the amount of $4,282,624.98 to include Alternative 1C – 30.6 x 100.8’ Main Displays (6mm Pixel Pitch), Alternative 2A – 4.7’ x 185.8’ Ribbon Displays (8mm P… p. 1
- S:\9113 Alerus Center Scoreboard Replacement\Staff Reports\Bids\9113 Bids.doc ANALYSIS AND FINDINGS OF FACT: Bids were advertised starting on October 14, 2026. Bids remained advertise for four (4) weeks. During the four-week advertisement period, vendors were invited to conduct a walkthrough of the Alerus Center to better understand the facility. Vendors were also required to take part in a screening interview prior to submitting a bid. Screening interviews were intended to validate that each vendor was providing consistent products for the project and determine each vendor was capable of perf… p. 2
- …Neral Conditions (Less Taxes) $80,085 $197,051 $154,315 Sales Tax $211,911 $61,869 $128,057 Total Base Bid: Option 1 $3,134,819 $2,186,557 $3,095,582 Variance from Low Bid ($) N/A $0 $909,025 Variance from Low Bid (%) N/A 0.0% 41.6% Total Base Bid: Option 2 $4,336,635 $2,820,236 $3,858,025 Variance from Low Bid ($) N/A $0 $1,037,789 Variance from Low Bid (%) N/A 0.0% 36.8% Broadcast Room Improvements (Broadcast Bid Form) Ajp Estimate Daktronics Lucenthd 1.1 Broadcast Equipment $501,744 $598,035 $682,976 1.2 Labor, Materials and Travel $121,000 $58,063 $61,034 1.3 Sales Tax (Broadcast Productio… p. 1
- …Center Total Base Bid: Led and Broadcast Ajp Estimate Daktronics Lucenthd Total Base Bid: Led Option 1 and Broadcast $4,091,354 $3,199,865 $4,153,398 Variance from Low Bid ($) N/A $0 $953,533 Variance from Low Bid (%) N/A 0.0% 29.8% Total Base Bid: Led Option 2 and Broadcast $5,293,170 $3,833,544 $4,915,842 Variance from Low Bid ($) N/A $0 $1,082,297 Variance from Low Bid (%) N/A 0.0% 28.2% Bid Form Alternates (Not Included in Totals) Ajp Estimate Daktronics Lucenthd Alternate 1: Option 1 - Increase Resolution to 4mm (Add) $212,038 $199,521 $597,198 Alternate 2: Option 2 - Increase Resolution… p. 2
- …cument §1.13 Tab 13 Proposal Summary — Scope of Work, Pricing Summary and Proposal Details Submitted separately, per §1.7.A and the Advertisement for Bids: a separately sealed envelope containing the 5% bidder's bond and a copy of LucentHD's North Dakota contractor license. Also enclosed: USB drive with the completed Excel bid forms (LED Proposal Form and Broadcast Bid Form Rev03) and an electronic copy of this proposal. An electronic copy is also sent to Jack Bailey (AJP) with copy to Christian Danielson, City Engineer, per §1.5. LucentHD | City of Grand Forks — Alerus Center Scoreboard Rep… p. 2
- …ee r Anthony Ryan, Civil Engineer, Sr Dan Hanson, Water Operations Manager Pete Aamold, Wastewater-Stormwater Supervisor Staff Recommended Action: a) Approve Task Order Agreement with AE2S for Design, Bidding, Construction Administration and Instrumentation and Controls Services in the amount of $173,579 b) approve any necessary budget amendments for City project No. 9218 – Upgrade Storm Stations Committee Recommended Action: Council Action: BACKGROUND: This project is intended to renew Storm Pump Station s 192, 193 and 197 so that they can provide efficient and reliable services for the next… p. 1
- (E) Estimated Cost • Funding for the City share will be from the Street/Infrastructure Fund 4815. If a budget amendment is necessary, it will be requested at the time of construction bids. • It is expected that this project will again be placed on upcoming Committee of the Whole agendas, some of which are as follows: o Winter 2026 – Cost Participation, Construction, and Maintenance Agreement with the NDDOT o Winter 2027 – Award of Bids o Winter 2027 – Construction Engineering Agreement • Bids are planned to be opened on February 26, 2027 at the NDDOT in Bismarck, ND. • Construction is currentl… p. 2
- …ent Batteries Adopted Budget Totals Capital Outlay Totals $8,395,525.00 Budget Transactions Level Transaction Adopted Budget Centracts Traffic Signal Software Upd/License Renewal Fund 4815 - Street/Infrastructure Fund Totals $6,507,052.00 Fund 4815 - Str p. 4
- 2. Multi-Dwelling Property & Spatial Adjustments • Imaginary Lot Lines: New criteria allow for "imaginary lot lines" to calculate fire separation distances when dealing with multiple single-family or multi-family dwellings situated on a single lot. • Two-Family Enhancements: Two-family dwellings now have codified options for incorporating shared accessory rooms, streamlining duplex layouts. p. 4
- …es specific requirements for the on-site commercial storage of lithium batteries that are not part of large-scale ESS (such as inventory warehousing, manufacturing plants, and recycling facilities). • Active Controls: New provisions establish clearer storage thresholds, permitting triggers, and active safety measures (such as specialized detection and sprinkler design standards) for handling lithium-ion inventory safely. p. 6
- 2. Evolution of Energy Storage Systems (ESS) & Micromobility • Updated Standards (NFPA 855): Section 1207 and associated provisions continue to mature, heavily incorporating updated references to NFPA 855 for ESS design, safety, and fire mitigation. • Powered Micromobility Devices: The code introduces dedicated guidance regarding the unique fire hazards tied to charging and storing small electric vehicles (like e-bikes and e-scooters), focusing on product listings, separation spaces, and detection systems. p. 6
- …ble 302.6: “Column 1 change 1/2” to 5/8th Type X, Column 3 change1/2” to 5/8th Type X (19) R309.1.1 Revise as follows Automatic sprinkler systems for townhouses shall be designed and installed in accordance with Section P2904, NFPA 13D, NFPA 13R or NFPA 13 (20) R311.4 Add the following “A carbon monoxide alarm shall be installed on every habitable level of a dwelling unit and be interconnected to activate all alarms in the individual dwelling unit if one alarm is activated. (21) R318.3.1 Revise as follows “Landings or finished floors at the required egress door shall not be not more than 1 ½ i… p. 12
- 1. Storage and use of LP-gas in excess of 125-gallon aggregate water capacity. Exception: A permit is not required for individual containers with a 500-gallon (1893 L) water capacity or less or multiple container systems having an aggregate quantity not exceeding 500 gallons (1893 L), serving occupancies in Group R-3. p. 1
- …alled in accordance with Section 903.3 shall be provided throughout all buildings with a Group R fire area except in one and two family dwellings and townhouses. However, if automatic sprinkler systems are voluntarily installed in one or two family dwellings or townhouses they shall be installed as set forth in Section 903.3. (11) Section 903.3.1 Standards. Amend as follows: Sprinkler systems shall be designed with a 5 PSI safety margin and installed in accordance with Section 903.3.1.1, unless otherwise permitted by Section 903.3.1.2 and 903.3.1.3 and other chapters of this code, as applicabl… p. 2
- …nd Forks Staff Report Committee of the Whole – November 23, 2026 City Council – December 7, 2026 Agenda Item: Public Works Landfill Division Mid-Size Excavator, Bid #2026-4 Re-Bid Submitted by: Sharon Lipsh, Public Works Director Staff Recommended Action: Award bid for a used mid-sized excavator per the attached bid tabulation to RDO Equipment Co. in the amount of $202,304.75 to be funded through the Sanitation-Landfill Budget, subject to review by the Finance Department. Committee Recommended Action: Council Action: BACKGROUND: The Sanitation Landfill Division is acquiring a mid-sized excavat… p. 1
- The bid specifications were developed to allow consideration of both new and used equipment, providing the City with an opportunity to evaluate cost-effective options that meet the operation needs of the landfills. SUPPORT MATERIALS: • Bid Tabulation • 2026 Budget p. 2
- BID TABULATION QUOTATION #2026-4 Re-Bid PUBLIC WORKS DEPARTMENT, CITY OF GRAND FORKS, ND DATE: Nov. 5, 2026 RDO Equipment Agassiz Equipment Ironhide Equipment Butler Machinery ITEM UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST Landfill Excavator (NEW) $229,617 $206,373.18 $219,200 $232,419.51 Landfill Excavator (USED) $202,304.75 According to the above bid tabulation, RDO Equipment is the apparent low bidder. Sharon Lipsh, Public Works Director p. 3
- …Council Adopted Totals 5100.100.5110 700.0120 Trucks & Mounted Equipmt 348,700.00 Capital Outlay Totals $824,992.00 Level Transaction Council Adopted Purchase Mid Size (210P or similar) Excavator w/ Log Splitter Council Adopted Replace #3282 w/ a 744P or similar Loader 5100.100.5110 700.0090 Shop Equipment .00 5100.100.5110 700.0110 Construction Equipment .00 5100.100.5110 700.0050 Gen Equipment N. p. 4
- …d Forks Staff Report Committee of the Whole – November 23, 2026 City Council – December 7, 2026 Agenda Item: Public Works Landfill Division Front End Loader, Bid #2026-5 Re-Bid Submitted by: Sharon Lipsh, Public Works Director Staff Recommended Action: Trade unit #3282, a 2015 John Deere 644K loader and award bid for a 4-wheel drive front end loader per the attached bid tabulation to RDO Equipment Co. in the amount of $417,214, subject to review by the Finance Department. Committee Recommended Action: Council Action: BACKGROUND: The Sanitation Division is replacing a landfill 4-wheel drive fro… p. 1
- …, the Public Works Department believes the additional cost is justified by the improved safety, maintenance efficiency, and operational benefits. RDO Equipment meets all specifications, and staff recommends awarding the bid to RDO Equipment as the best overall value to the City. Unit #3282 will be traded, with proceeds applied toward the purchase of the new loader. SUPPORT MATERIALS: • Bid Tabulation • 2026 Budget p. 2
- …Council Adopted Totals 5100.100.5110 700.0120 Trucks & Mounted Equipmt 348,700.00 Capital Outlay Totals $824,992.00 Level Transaction Council Adopted Purchase Mid Size (210P or similar) Excavator w/ Log Splitter Council Adopted Replace #3282 w/ a 744P or similar Loader 5100.100.5110 700.0090 Shop Equipment .00 5100.100.5110 700.0110 Construction Equipment .00 5100.100.5110 700.0050 Gen Equipment N. p. 4
- b) approve Task Order Agreement with AE2S for Instrumentation and Controls Services in the amount of $55,179 c) approve any necessary budget amendments for City project No. 9216 – Upgrade Sanitary Lift Stations Committee Recommended Action: Council Action: BACKGROUND: This project is intended to renew Sanitary Lift Station No. 6 and 1 4 so that it can provide efficient and reliable service for the next 25 plus years. Lift station 6 is located at 322 N 25 th St and lift station 14 is located at 1730 S 12 th St. Lift station 6 was last rehabbed in 2002 and lift station 14 was last rehabbed in 20… p. 1
- …the Task Order and previous amendments, if any, is modified as follows: Develop a scope of work and schedule for the project; assist city staff with purchasing materials for products to be installed by contractors; design the General and Electrical parts of the rehabilitation of Sanitary Lift Stations 14 and 15; prepare plans, specifications, and cost estimate; prepare bid documents; prepare contracts with contractors; and observe construction operations. Owner will be responsible for preparing controls for the project and ensuring their correct operation. p. 3
- …neer Anthony Ryan, Civil Engineer, Sr Dan Hanson, Water Operations Manager Pete Aamold, Wastewater-Stormwater Supervisor Staff Recommended Action: a) Approve Task Order Agreement with Houston Engineering for Design, Bidding, and Construction Administration in the amount of $166,111 and b) approve Task Order Agreement with AE2S for Instrumentation and Controls Services in the amount of $80,186 c) approve any necessary budget amendments for City project No. 9217 - Upgrade Flood Stations Committee Recommended Action: Council Action: BACKGROUND: This project is intended to replace the controls and… p. 1
- e) Ordinance enacting City Code Chapter XIX, Buildings and Building Regulations Article 10, relating to International Existing Building Code 3.7 Bid award for Public Works Equipment p. 2
- a) Bid#2026-4, Public Works Landfill Division Mid-Size Excavator (rebid) p. 2
- b) Bid #2026-5, Public Works Landfill Division Front End Loader (rebid) 3.8 Engineering Services Agreements for City Project No. 9216 – Upgrade Sanitary Stations 3.9 Engineering Services Agreements for City Project No. 9217 – Upgrade Flood Stations 3.10 Engineering Services Agreements for City Project No. 9218 – Upgrade Storm Stations p. 2
- e) Ordinance enacting City Code Chapter XIX, Buildings and Building Regulations Article 10, relating to International Existing Building Code 3.7 Bid award for Public Works Equipment p. 2
- a) Bid#2026-4, Public Works Landfill Division Mid-Size Excavator (rebid) p. 2
- b) Bid #2026-5, Public Works Landfill Division Front End Loader (rebid) 3.8 Engineering Services Agreements for City Project No. 9216 – Upgrade Sanitary Stations 3.9 Engineering Services Agreements for City Project No. 9217 – Upgrade Flood Stations 3.10 Engineering Services Agreements for City Project No. 9218 – Upgrade Storm Stations p. 2
- …ie Parvey (Water Works Director) Dan Hanson (Water Operations Manager) Carmen Neuschwander (Utility Engineer) Staff Recommended Action: Pending DWSRF approval, award contract to low bidder, Taggart Contracting Inc in the amount of $4,799,348.00 for City Project No. 9071.01 – 2027 Watermain Replacement Cottonwood St (4th Ave S – 9 th Ave S) & 9071.02 – 2027 Standalone Lead Service Line Replacement. Committee Recommended Action: Council Action: BACKGROUND: Bids for this Project were received on 11/19/26. Two bids were received and Two bids were opened. The low bid of $4,799,348.00 was submitted… p. 1
- Contractor Acknowledge Addendum 1& 2 Bid Bond Contractor's License Non-Collusion Affidavit Base Bid Taggart Contracting Inc 1 PO Box 726, Theif River Falls, MN 56701 Hanco 2 PO Box 55 Lake Nebagamon, WI 54849 3 4 5 Engineer's Estimate $4,408,319.00 Yes $4,995,813.50 Abstract of Bids Received City Project No. 9071 Project Name - 2027 Lead Service Line Replacement Bid Opening - 2:00 PM on Thursday, November 19, 2026 Yes $4,799,348.00 p. 4
- S:\9113 Alerus Center Scoreboard Replacement\Staff Reports\Bids\9113 Bids.doc City of Grand Forks Staff Report Committee of the Whole – November 23, 2026 City Council – December 7, 2026 Agenda Item: Bids for City Project No. 9113 – Alerus Center Scoreboard Replacement Submitted by: Engineering Department, Christian Danielson, PE (City Engineer) Staff Recommended Action: Reject bids from SNA and Uber Displays, Award project to Daktronics in the amount of $4,282,624.98 to include Alternative 1C – 30.6 x 100.8’ Main Displays (6mm Pixel Pitch), Alternative 2A – 4.7’ x 185.8’ Ribbon Displays (8mm P… p. 1
- S:\9113 Alerus Center Scoreboard Replacement\Staff Reports\Bids\9113 Bids.doc ANALYSIS AND FINDINGS OF FACT: Bids were advertised starting on October 14, 2026. Bids remained advertise for four (4) weeks. During the four-week advertisement period, vendors were invited to conduct a walkthrough of the Alerus Center to better understand the facility. Vendors were also required to take part in a screening interview prior to submitting a bid. Screening interviews were intended to validate that each vendor was providing consistent products for the project and determine each vendor was capable of perf… p. 2
- • Two separate sealed envelopes are required with the submittal o Sealed envelope with the prime vendor/contractor’s current contractor license in the state of North Dakota and a bid bond in the amount of 5% of the bid. (NDCC requirement). o Sealed envelope with the paper bid proposal as well as a USB drive containing a digital version of the bid proposal. If any of the conditions are not met, the bid cannot be opened. When opening bids, the envelope with the contractor license and bid bond is opened and reviewed first. If those two documents are included and correct, then the envelope with th… p. 2
- • Uber Displays Of the four bids that were received, only two were opened. The bid packages submitted by SNA and Uber Displays both included a contractor license that was not in the name of the vendor submitting the bid. For that reason, neither of those bids were opened and read. The recommendation included in this staff report is reject those bids and return them to the corresponding firm. The remaining two bid packages from Daktronics and Lucent HD were opened without issue. p. 2
- • Alternative 1A/B – 23.6’ x 85.7’ o This is the base bid for the project and the minimum display size that was solicited for bids. p. 3
- • Alternative 1C/D – 30.6’ x 100.8’ Main Displays o This is the alternative size that was solicited for bids that is both taller and wider than the base bid. p. 3
- …B but includes only warranty on parts. Labor would a cost borne by the owner. Broadcast & Cabling This is a fixed cost for the project to replace and renew the broadcast and cabling equipment that the runs the event space for the Alerus Center. Inclusive of this item are cameras, connective cabling, event and display management software, integration, etc. Of note is that Daktronics provide several vendor alternatives under this item that were reviewed, approved by staff, and reflected in costs shown in the table above. When comparing the Daktronics and Lucent HD bid prices, regardless of combi… p. 4
- • Alternative 4B – 10 Year Parts and Labor Extended Warranty The total cost of the above alternatives from Daktronics is $4,282,624.98. The Events Center Commission concurred with the recommendation listed above. A comparable bid from Lucent HD totals $6,018,932.44. A comparable cost for similar equipment from the quote received in early 2026 for this project is $4,779,376. Note that the quote received in early 2026 did not include a 30.6’ tall board option which would have likely brought the cost up. p. 4
- …Neral Conditions (Less Taxes) $80,085 $197,051 $154,315 Sales Tax $211,911 $61,869 $128,057 Total Base Bid: Option 1 $3,134,819 $2,186,557 $3,095,582 Variance from Low Bid ($) N/A $0 $909,025 Variance from Low Bid (%) N/A 0.0% 41.6% Total Base Bid: Option 2 $4,336,635 $2,820,236 $3,858,025 Variance from Low Bid ($) N/A $0 $1,037,789 Variance from Low Bid (%) N/A 0.0% 36.8% Broadcast Room Improvements (Broadcast Bid Form) Ajp Estimate Daktronics Lucenthd 1.1 Broadcast Equipment $501,744 $598,035 $682,976 1.2 Labor, Materials and Travel $121,000 $58,063 $61,034 1.3 Sales Tax (Broadcast Productio… p. 1
- …Center Total Base Bid: Led and Broadcast Ajp Estimate Daktronics Lucenthd Total Base Bid: Led Option 1 and Broadcast $4,091,354 $3,199,865 $4,153,398 Variance from Low Bid ($) N/A $0 $953,533 Variance from Low Bid (%) N/A 0.0% 29.8% Total Base Bid: Led Option 2 and Broadcast $5,293,170 $3,833,544 $4,915,842 Variance from Low Bid ($) N/A $0 $1,082,297 Variance from Low Bid (%) N/A 0.0% 28.2% Bid Form Alternates (Not Included in Totals) Ajp Estimate Daktronics Lucenthd Alternate 1: Option 1 - Increase Resolution to 4mm (Add) $212,038 $199,521 $597,198 Alternate 2: Option 2 - Increase Resolution… p. 2
- …cument §1.13 Tab 13 Proposal Summary — Scope of Work, Pricing Summary and Proposal Details Submitted separately, per §1.7.A and the Advertisement for Bids: a separately sealed envelope containing the 5% bidder's bond and a copy of LucentHD's North Dakota contractor license. Also enclosed: USB drive with the completed Excel bid forms (LED Proposal Form and Broadcast Bid Form Rev03) and an electronic copy of this proposal. An electronic copy is also sent to Jack Bailey (AJP) with copy to Christian Danielson, City Engineer, per §1.5. LucentHD | City of Grand Forks — Alerus Center Scoreboard Rep… p. 2
- …ee r Anthony Ryan, Civil Engineer, Sr Dan Hanson, Water Operations Manager Pete Aamold, Wastewater-Stormwater Supervisor Staff Recommended Action: a) Approve Task Order Agreement with AE2S for Design, Bidding, Construction Administration and Instrumentation and Controls Services in the amount of $173,579 b) approve any necessary budget amendments for City project No. 9218 – Upgrade Storm Stations Committee Recommended Action: Council Action: BACKGROUND: This project is intended to renew Storm Pump Station s 192, 193 and 197 so that they can provide efficient and reliable services for the next… p. 1
- (E) Estimated Cost • Funding for the City share will be from the Street/Infrastructure Fund 4815. If a budget amendment is necessary, it will be requested at the time of construction bids. • It is expected that this project will again be placed on upcoming Committee of the Whole agendas, some of which are as follows: o Winter 2026 – Cost Participation, Construction, and Maintenance Agreement with the NDDOT o Winter 2027 – Award of Bids o Winter 2027 – Construction Engineering Agreement • Bids are planned to be opened on February 26, 2027 at the NDDOT in Bismarck, ND. • Construction is currentl… p. 2
- …ent Batteries Adopted Budget Totals Capital Outlay Totals $8,395,525.00 Budget Transactions Level Transaction Adopted Budget Centracts Traffic Signal Software Upd/License Renewal Fund 4815 - Street/Infrastructure Fund Totals $6,507,052.00 Fund 4815 - Str p. 4
- 2. Multi-Dwelling Property & Spatial Adjustments • Imaginary Lot Lines: New criteria allow for "imaginary lot lines" to calculate fire separation distances when dealing with multiple single-family or multi-family dwellings situated on a single lot. • Two-Family Enhancements: Two-family dwellings now have codified options for incorporating shared accessory rooms, streamlining duplex layouts. p. 4
- …es specific requirements for the on-site commercial storage of lithium batteries that are not part of large-scale ESS (such as inventory warehousing, manufacturing plants, and recycling facilities). • Active Controls: New provisions establish clearer storage thresholds, permitting triggers, and active safety measures (such as specialized detection and sprinkler design standards) for handling lithium-ion inventory safely. p. 6
- 2. Evolution of Energy Storage Systems (ESS) & Micromobility • Updated Standards (NFPA 855): Section 1207 and associated provisions continue to mature, heavily incorporating updated references to NFPA 855 for ESS design, safety, and fire mitigation. • Powered Micromobility Devices: The code introduces dedicated guidance regarding the unique fire hazards tied to charging and storing small electric vehicles (like e-bikes and e-scooters), focusing on product listings, separation spaces, and detection systems. p. 6
- …ble 302.6: “Column 1 change 1/2” to 5/8th Type X, Column 3 change1/2” to 5/8th Type X (19) R309.1.1 Revise as follows Automatic sprinkler systems for townhouses shall be designed and installed in accordance with Section P2904, NFPA 13D, NFPA 13R or NFPA 13 (20) R311.4 Add the following “A carbon monoxide alarm shall be installed on every habitable level of a dwelling unit and be interconnected to activate all alarms in the individual dwelling unit if one alarm is activated. (21) R318.3.1 Revise as follows “Landings or finished floors at the required egress door shall not be not more than 1 ½ i… p. 12
- 1. Storage and use of LP-gas in excess of 125-gallon aggregate water capacity. Exception: A permit is not required for individual containers with a 500-gallon (1893 L) water capacity or less or multiple container systems having an aggregate quantity not exceeding 500 gallons (1893 L), serving occupancies in Group R-3. p. 1
- …alled in accordance with Section 903.3 shall be provided throughout all buildings with a Group R fire area except in one and two family dwellings and townhouses. However, if automatic sprinkler systems are voluntarily installed in one or two family dwellings or townhouses they shall be installed as set forth in Section 903.3. (11) Section 903.3.1 Standards. Amend as follows: Sprinkler systems shall be designed with a 5 PSI safety margin and installed in accordance with Section 903.3.1.1, unless otherwise permitted by Section 903.3.1.2 and 903.3.1.3 and other chapters of this code, as applicabl… p. 2
- …nd Forks Staff Report Committee of the Whole – November 23, 2026 City Council – December 7, 2026 Agenda Item: Public Works Landfill Division Mid-Size Excavator, Bid #2026-4 Re-Bid Submitted by: Sharon Lipsh, Public Works Director Staff Recommended Action: Award bid for a used mid-sized excavator per the attached bid tabulation to RDO Equipment Co. in the amount of $202,304.75 to be funded through the Sanitation-Landfill Budget, subject to review by the Finance Department. Committee Recommended Action: Council Action: BACKGROUND: The Sanitation Landfill Division is acquiring a mid-sized excavat… p. 1
- The bid specifications were developed to allow consideration of both new and used equipment, providing the City with an opportunity to evaluate cost-effective options that meet the operation needs of the landfills. SUPPORT MATERIALS: • Bid Tabulation • 2026 Budget p. 2
- BID TABULATION QUOTATION #2026-4 Re-Bid PUBLIC WORKS DEPARTMENT, CITY OF GRAND FORKS, ND DATE: Nov. 5, 2026 RDO Equipment Agassiz Equipment Ironhide Equipment Butler Machinery ITEM UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST UNIT PRICE TOTAL COST Landfill Excavator (NEW) $229,617 $206,373.18 $219,200 $232,419.51 Landfill Excavator (USED) $202,304.75 According to the above bid tabulation, RDO Equipment is the apparent low bidder. Sharon Lipsh, Public Works Director p. 3
- …Council Adopted Totals 5100.100.5110 700.0120 Trucks & Mounted Equipmt 348,700.00 Capital Outlay Totals $824,992.00 Level Transaction Council Adopted Purchase Mid Size (210P or similar) Excavator w/ Log Splitter Council Adopted Replace #3282 w/ a 744P or similar Loader 5100.100.5110 700.0090 Shop Equipment .00 5100.100.5110 700.0110 Construction Equipment .00 5100.100.5110 700.0050 Gen Equipment N. p. 4
- …d Forks Staff Report Committee of the Whole – November 23, 2026 City Council – December 7, 2026 Agenda Item: Public Works Landfill Division Front End Loader, Bid #2026-5 Re-Bid Submitted by: Sharon Lipsh, Public Works Director Staff Recommended Action: Trade unit #3282, a 2015 John Deere 644K loader and award bid for a 4-wheel drive front end loader per the attached bid tabulation to RDO Equipment Co. in the amount of $417,214, subject to review by the Finance Department. Committee Recommended Action: Council Action: BACKGROUND: The Sanitation Division is replacing a landfill 4-wheel drive fro… p. 1
- …, the Public Works Department believes the additional cost is justified by the improved safety, maintenance efficiency, and operational benefits. RDO Equipment meets all specifications, and staff recommends awarding the bid to RDO Equipment as the best overall value to the City. Unit #3282 will be traded, with proceeds applied toward the purchase of the new loader. SUPPORT MATERIALS: • Bid Tabulation • 2026 Budget p. 2
- …Council Adopted Totals 5100.100.5110 700.0120 Trucks & Mounted Equipmt 348,700.00 Capital Outlay Totals $824,992.00 Level Transaction Council Adopted Purchase Mid Size (210P or similar) Excavator w/ Log Splitter Council Adopted Replace #3282 w/ a 744P or similar Loader 5100.100.5110 700.0090 Shop Equipment .00 5100.100.5110 700.0110 Construction Equipment .00 5100.100.5110 700.0050 Gen Equipment N. p. 4
- b) approve Task Order Agreement with AE2S for Instrumentation and Controls Services in the amount of $55,179 c) approve any necessary budget amendments for City project No. 9216 – Upgrade Sanitary Lift Stations Committee Recommended Action: Council Action: BACKGROUND: This project is intended to renew Sanitary Lift Station No. 6 and 1 4 so that it can provide efficient and reliable service for the next 25 plus years. Lift station 6 is located at 322 N 25 th St and lift station 14 is located at 1730 S 12 th St. Lift station 6 was last rehabbed in 2002 and lift station 14 was last rehabbed in 20… p. 1
- …the Task Order and previous amendments, if any, is modified as follows: Develop a scope of work and schedule for the project; assist city staff with purchasing materials for products to be installed by contractors; design the General and Electrical parts of the rehabilitation of Sanitary Lift Stations 14 and 15; prepare plans, specifications, and cost estimate; prepare bid documents; prepare contracts with contractors; and observe construction operations. Owner will be responsible for preparing controls for the project and ensuring their correct operation. p. 3
- …neer Anthony Ryan, Civil Engineer, Sr Dan Hanson, Water Operations Manager Pete Aamold, Wastewater-Stormwater Supervisor Staff Recommended Action: a) Approve Task Order Agreement with Houston Engineering for Design, Bidding, and Construction Administration in the amount of $166,111 and b) approve Task Order Agreement with AE2S for Instrumentation and Controls Services in the amount of $80,186 c) approve any necessary budget amendments for City project No. 9217 - Upgrade Flood Stations Committee Recommended Action: Council Action: BACKGROUND: This project is intended to replace the controls and… p. 1
- …ie Parvey (Water Works Director) Dan Hanson (Water Operations Manager) Carmen Neuschwander (Utility Engineer) Staff Recommended Action: Pending DWSRF approval, award contract to low bidder, Taggart Contracting Inc in the amount of $4,799,348.00 for City Project No. 9071.01 – 2027 Watermain Replacement Cottonwood St (4th Ave S – 9 th Ave S) & 9071.02 – 2027 Standalone Lead Service Line Replacement. Committee Recommended Action: Council Action: BACKGROUND: Bids for this Project were received on 11/19/26. Two bids were received and Two bids were opened. The low bid of $4,799,348.00 was submitted… p. 1
- • A total of two bids were received and two bids were opened. p. 3
- • The lowest bid received was from Taggart Contracting. p. 3
- Contractor Acknowledge Addendum 1& 2 Bid Bond Contractor's License Non-Collusion Affidavit Base Bid Taggart Contracting Inc 1 PO Box 726, Theif River Falls, MN 56701 Hanco 2 PO Box 55 Lake Nebagamon, WI 54849 3 4 5 Engineer's Estimate $4,408,319.00 Yes $4,995,813.50 Abstract of Bids Received City Project No. 9071 Project Name - 2027 Lead Service Line Replacement Bid Opening - 2:00 PM on Thursday, November 19, 2026 Yes $4,799,348.00 p. 4
43 more passages from inside the staff reports, forms and minutes attached to this agenda are not listed as agenda items. Search finds every word of them.