Borough of Camp Hill, PA · pop. 8K
Wed18Nov
Council
Wed Nov 18 · 4 days ago
Agendacamphillborough.comPacketCouncil Packet 11-18-26
Minutesnot posted yet
Meeting page ↗camphillborough.comThis agenda in plain words
Leer en españolThis is a regular monthly meeting of the Camp Hill Borough Council on Wednesday, November 18, 2026, at 7:00 PM. The main decisions are a few contracts for engineering work, a one-year extension of the trash and recycling contract, starting the 2027 budget process, and two changes to pension plans.
- Approve a contract with HRG for $312,000 to design a pedestrian connectivity project (a project to link walking paths) along Cumberland Boulevard. $312,000. Touches: People who walk along Cumberland Boulevard. p. 2
- Approve a one-year extension of the trash and recycling collection contract with Penn Waste, running from 4/1/27 through 3/31/28. The extension depends on Penn Waste giving a Performance Guarantee for 100% of the contract value for that year and a Certificate of Insurance. 100% of the contract value for the additional year; the agen. Touches: Borough trash and recycling customers; Penn Waste. p. 2
- Approve a contract with Hillis-Carnes Engineering Associates to do geotechnical borings (ground tests taken by drilling holes) for the Creek Road sewer force main replacement project. An estimated $20,800. Touches: Creek Road area; sewer customers. p. 2
- Adopt Resolution #2026-05 to amend the Police Pension Plan. Touches: Police Pension Plan members. p. 2
- Adopt Resolution #2026-06 to amend the N1 Pension Plan. Touches: N1 Pension Plan members. p. 2
- Advertise the 2027 budget, which starts the public notice process for the next year's budget. Touches: All Borough residents. p. 2
- Public comment on agenda items and other matters. Each speaker should give their name and address and has three minutes. Touches: Members of the public. p. 2
Words on this agenda, explained
- Consent Agenda
- A group of routine items approved together in one vote, with no separate discussion unless someone asks to pull an item out.
- Geotechnical borings
- Test holes drilled into the ground to learn what the soil and rock are like before building.
- Force main
- A pipe that moves sewage under pressure from a low point to a place where it can flow on to treatment.
- Performance Guarantee
- A promise, usually backed by money, that a contractor will finish the work or meet the contract terms.
- Certificate of Insurance
- A document from a company showing it carries insurance that covers its work.
- Resolution
- A formal written decision by the council, such as a change to a pension plan.
Written by AI from the agenda, Nov 18. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
Agenda items (3)
- ii. Public Works • Consider approval of a contract with HRG in the amount of $312,000 for engineering services associated with a pedestrian connectivity project along Cumberland Boulevard • Consider approval of a contract with Hillis-Carnes Engineering Associates to proceed with geotechnical borings for the Creek Road sewer force main replacement project at an estimated cost of $20,800 p. 1
- vi. Administration and Finance • Consider a one-year extension of the trash and recycling collection contract with Penn Waste to run from 4/1/27 through 3/31/28, contingent upon the receipt of a Performance Guarantee in the amount of 100% of the contract value for the additional one (1) year period and a Certificate of Insurance • Consider advertisement of the 2027 Budget • Consider two pension resolutions • Review draft 2027 meeting calendar p. 1
- f. Approve a one-year extension of the trash and recycling collection contract with Penn Waste to run from 4/1/27 through 3/31/28, contingent upon the receipt of a Performance Guarantee in the amount of 100% of the contract value for the additional one (1) year period and a Certificate of Insurance p. 2