GovMeet
Sign in
Wed18Nov

Water Pollution Control Authority

Wed Nov 18 · 4 days ago

Water Pollution Control Authority Meeting Agenda (PDF)

This agenda in plain words

Leer en español

This is a regular online meeting of the Trumbull Water Pollution Control Authority, the town board that runs the sewer system. The main items are a public hearing on a proposed sewer assessment for 5 Nuthatch Hill Road, and an old request to cancel a sewer connection approval for 7182-7192 Main Street.

  1. Public hearing on a proposed sewer assessment of $21,203 for 5 Nuthatch Hill Road. Residents may speak about it. The board will then consider approving it. $21,203.00. Touches: Owner of 5 Nuthatch Hill Road (Casey Rickey et al, or current owner).The public may speak p. 1
  2. Consider revoking the sewer connection approval given for 7182-7192 Main Street in 2021. The reasons given are the long time since the approval and the need to free up wastewater flow capacity for other town projects. Touches: Owner of 7182-7192 Main Street. p. 2
  3. Approval of the 5 Nuthatch Hill Road sewer assessment, after the public hearing. $21,203.00. Touches: Owner of 5 Nuthatch Hill Road. p. 2
  4. Update on a sewer assessment for 11 Pam Bar Road. The agenda gives no details. Touches: Owner of 11 Pam Bar Road. p. 2
  5. Discussion of a Whitney Avenue force-main lining project. The agenda gives no details. Touches: People along Whitney Avenue. p. 2
  6. Report on a Whitney Avenue force-main break that happened on November 4, 2026. The agenda gives no details. Touches: People along Whitney Avenue. p. 2
  7. Discussion of the 5-Year Capital Plan. The agenda gives no details. p. 2
Words on this agenda, explained
Public hearing
A set time when the public may speak about an item before the board decides it.
Sewer assessment
A charge a property owner pays toward a sewer line that serves the property.
Force-main
A pressure pipe that pushes sewage uphill or over long distances to a treatment plant.
Revocation
Canceling an approval that was already given.
Wastewater flow capacity
How much sewage the town's pipes and plant can handle at one time.
Unit assessment charge
A flat charge per lot, added to the charge for the lot's street frontage.

Written by AI from the agenda, Nov 17. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.

1 item on this agenda matches the land-use topicsWater & sewer (1)

Agenda items (1)Show only the 1 matching