Leer en españolThis is a draft of Article 8, the county's rules for large renewable energy projects such as wind farms and solar farms, shown at a Board of Supervisors meeting on November 17, 2026. The text is a working draft with many staff, commission, and community edits still open, so it is up for discussion and revision rather than a final vote shown here. The agenda text shown covers the purpose, applicability, and a long list of definitions.
- Discussion of Draft 11 of the Article 8 Renewable Energy Ordinance, the county's rules for large solar and wind projects that need a Conditional Use Permit. The draft lists the purpose of the rules and says they apply to projects of one megawatt or more. Touches: Anyone interested in large solar, wind, or battery projects in Apache County; owners of land near such projects.. p. 1
- The purpose section says approved projects must provide significant long-term local public benefit, and must not shift project costs or risks to neighbors, county residents, or taxpayers. Applicants must submit reports and studies for third-party review at the applicant's expense before public hearings. Touches: Neighbors of proposed projects, county residents, and taxpayers.. p. 1
- The applicability section says the rules do not cover small personal or on-site systems meant mainly for the property they sit on, or facilities planned at less than one megawatt. Touches: Homeowners, farms, and businesses thinking about small on-site solar or wind systems.. p. 2
- The draft defines key terms such as Micro-siting, which allows small moves of project parts up to 100 feet, approved in writing by the Community Development Director. Changes larger than that would count as Substantial Modifications. Touches: Nearby property owners and anyone affected by project layout changes.. p. 14
- The draft defines Participating Parcel and Non-participating Parcel. A participating parcel has a signed, recorded lease, easement, or option with the project. Non-participating parcels do not, and the draft says leases must be checked to make sure they do not expire. Touches: Landowners who have or have not signed agreements with a project.. p. 14
- The draft defines Highway Use Agreement, Highway Repair Bond, and Highway Video Log. These describe a road-use contract, a bond to repair roads, and a time-stamped video record of road condition. Touches: Anyone who lives near or uses roads that construction trucks would travel.. p. 12
- The draft defines Biomass Energy Production, and a note says staff will work on a better definition. Several other definitions, including Agri-Voltaics and Qualified RF Communications Consultant, are also still under debate. Touches: Forest, grassland, and land-management operations; farms with solar panels.. p. 4
Words on this agenda, explained
- Conditional Use Permit (CUP)
- A permit the county can grant for a use that is allowed only under set conditions and after review.
- Utility-Scale
- Describes a very large power-producing facility, such as a big solar or wind farm, meant to sell power to the grid.
- Micro-siting
- Small changes to where project parts are placed, within a set distance, to avoid problems found during construction planning.
- Participating Parcel
- A piece of land whose owner has signed a recorded lease, easement, or option allowing the project to use it.
- Highway Use Agreement
- A written contract with the county that lets a company use certain public roads under agreed terms.
- Megawatt
- A unit of electric power; the draft uses it to set the size at which the rules start to apply.
Written by AI from the agenda, Nov 14. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
Agenda items (5)Show only the 3 matching
- 1. Specify Conditional Use Permit (CUP) application requirements for the development of utility-scale renewable energy production facilities. The permitting process requires thorough review to help ensure that potential adverse impacts are carefully identified, addressed and mitigated. Due to the scale and complexity of these projects, they require more information and more time to process compared to typical applications. Therefore, the requirements in this Article 8 are in addition to the basic requirements in Article 1106-1107, unless otherwise specified herein. p. 1
- d. Satisfy CUP evaluation criteria and standards in Article 11, and do not shift project related costs or risks to neighbors, County residents, local or state agencies, or onto the taxpayers; and p. 1
- e. Submit a complete application with reports and studies subject to 3 rd party review at the applicant’s expense prior to P&Z public hearings to consider the CUP. p. 1
- …s with an actual or planned generating capacity of less than one megawatt. These include, but are not limited to, small wind energy systems and small solar energy systems, including ground-mounted systems, roof-mounted systems, pole-mounted systems, and systems affixed to shade structures located over parking areas. p. 2
- …on the same site, allowing agricultural activities and electric generation to occur concurrently. Does the Commission intend agri-voltaics to mean a solar facility that actually incorporates agricultural production? If we say agricultural production ‘may be integrated,’ almost any solar facility potentially qualifies as agri-voltaic. If we say it ‘is integrated,’ then actual coexisting agricultural production becomes part p. 3