Charter Township of West Bloomfield, MI · pop. 66K
Wed2Dec6:00 PM
Environmental Commission
Wed Dec 2, 6:00 PM · Town Hall Board Room · in 10 days
Agendawbtownshipmi.api.civicclerk.com
Minutesafter the meeting
Meeting page ↗wbtownshipmi.portal.civicclerk.comAdd to calendar.ics for Outlook, Google, AppleThis agenda in plain words
Leer en españolThis is a regular monthly meeting of the West Bloomfield Township Environmental Commission on Wednesday, December 2, 2026, at 6:00 PM in the Township Boardroom. The main items up for decision are two requests for permits near wetlands and lake or canal shorelines, plus one smaller shoreline permit that the staff approves on its own.
- A request to build a new home on an empty lot. Part of the driveway, sidewalk, and street work would sit within the 'environmental features setback' near wetlands. The applicant proposes plantings to make up for that impact. Touches: Property at Sidwell #18-29-107-036, along Blue Jay Way; applicant Zhongyi Liu.The public may speak p. 1
- An after-the-fact permit for trees already removed within 25 feet of a canal on Upper Straits Lake. The request also covers other plant removal, about 9 cubic yards of riprap (large rocks) with filter fabric along the shoreline, and replacement tree planting and native seeding. Touches: Property at Sidwell #18-17-329-042, on a canal on Upper Straits Lake; applicant Todd's Services for Fahad Khan.The public may speak p. 1
- A permit to take out a failed seawall and place about 7 cubic yards of rock (4 to 10 inches) with filter cloth along 54 feet of shoreline, to stop erosion. Native plants would be seeded along the shoreline as natural protection. This item is on the administrative permits list. Touches: Shoreline of Upper Long Lake, 54 feet of frontage; permit #PWT26-2774. p. 2
Words on this agenda, explained
- Use permit
- A permit the township must approve before a property can be used or changed in a certain way.
- Environmental features setback (EFS)
- A required buffer distance kept clear of building or disturbance near wetlands, lakes, or canals.
- Riprap
- Large loose rocks placed along a shoreline to stop the water from wearing the land away.
- Mitigation
- Steps taken to make up for harm done to the land, such as planting new trees.
- Administrative permits
- Smaller permit requests that the township staff can decide without a full commission case.
Written by AI from the agenda, Nov 19. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
Agenda items (7)
- A.Old Business
- B.New Business
- a.CASE #1 #PWT26-2755 Liu Location: Sidwell #18-29-107-036 Request: A use permit request to construct a new home on a vacant parcel with portions of the site development being within the environmental features setback (EFS) to wetlands. Provide plantings as mitigation for EFS impacts of the section of Blue Jay Way, driveway, and sidewalk within the EFS as mitigation. Applicant: Zhongyi Liu p. 1
- b.CASE #2 # PWT26-2777 Khan Location: Sidwell #18-17-329-042 Request: An after-the-fact use permit for unauthorized tree removal within the 25 foot environmental features setback (EFS) to a canal on Upper Straits Lake. Permit request also includes removal of additional vegetation within the EFS, placement of approximately 9 cubic yards of riprap with filter fabric along the shoreline, with mitigation for the tree removal to include replacement tree planting and seeding with native seed mix within the EFS. Applicant: Todd’s Services, on behalf of Fahad Khan
- C.Other Business
- A.November 18th, 2026, Regular & Public p. 2
- A.#PWT26-2774 - Remove an existing failed seawall and place approximately 7 cubic yards of 4-10” rip rap with geotextile underlayment along 54 feet of Upper Long Lake shoreline to protect the existing shoreline from erosion. Use of native seeding within an eight (8) foot wide buffer on one side and along the existing shoreline on the north and east sides to provide natural shoreline protection. p. 2