Township of Upper Pottsgrove, PA · pop. 6K
Mon16Nov
Board of Commissioners
Mon Nov 16 · 6 days ago
This agenda in plain words
Leer en españolThis is a regular monthly meeting of the Upper Pottsgrove Township Board of Commissioners, held Monday, November 16, 2026 at 7:00 PM in the Pottsgrove High School Cafeteria. The main items up for a decision are money releases tied to two building projects, three grant support resolutions for fire, police and a municipal complex, a Planning Commission appointment, a storm sewer repair quote, and a first look at two zoning hearing requests for December 9.
- Release the remaining escrow money held for stormwater and grading review at 2086 Detweiler Rd (Permit 0620-2204), based on the Township Engineer's July 20, 2026 letter. $4,925.87. Touches: The property at 2086 Detweiler Rd and its builder or owner. p. 1
- Release construction security for Pottsgrove Hunt Phase 1 Subdivision, following the Township Engineer's conditions and a November 13, 2026 letter. Touches: Pottsgrove Hunt Phase 1 (Catalyst Homes). p. 2
- Accept the resignation of Manuel Cartegena from the Planning Commission and appoint John Bush to the Planning Commission, with his term ending December 2026. Touches: Planning Commission. p. 2
- Approve a quote from Sacks & Sons, Inc. for storm sewer repairs on Maple Leaf Lane, to be done before utility and road work planned for 2027. Touches: Maple Leaf Lane residents and drivers. p. 2
- Board review of a zoning request by SDM Investments, LLC to expand a non-conforming use at 1393 Farmington Avenue, to within 200 feet of Farmington Avenue. This is for the December 9 Zoning Hearing Board meeting. Touches: 1393 Farmington Avenue, RO Retail Office District. p. 2
- Board review of a request by Master Ventures, LLC for 28 townhomes at 0 Farmington Avenue, including permission to build on steep slopes and relief to allow building coverage over 50% on some lots. This is for the December 9 Zoning Hearing Board meeting. Touches: 0 Farmington Avenue (R3 Residential District); nearby residents. p. 3
Written by AI from the agenda, Nov 14. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
4 items on this agenda match the land-use topicsSubdivisions (2), Special use (2), Variances (1)
Agenda items (5)Show only the 4 matching
- 10. Action Items Subdivisions & Land Developments p. 1
- b. Release of Funds – Pottsgrove Hunt Phase 1 (Catalyst Homes) – Security Release 21 Consideration of a motion to authorize the release of construction security for the Pottsgrove Hunt Phase 1 Subdivision in accordance with the Township Engineer’s conditions and recommendation made by letter dated November 13, 2026. Ordinances Resolutions p. 2
- i. ZHB #06-2026: 1393 Farmington Avenue SDM Investments, LLC, owner of the property at 1393 Farmington Avenue, Pottstown, PA, in the RO Retail Office District requesting a special exception from §350-149 (relating to non-conforming uses) to permit the expansion of the nonconforming use to within two-hundred (200) feet of Farmington Avenue. p. 2
- ii. ZHB #07-2026: 0 Farmington Avenue (“Master Ventures”) Master Ventures, LLC, in the R3 Residential District (28 proposed townhomes), seeks a special exception approval under Code §350-41 to permit buildings, retaining walls, utilities, roads, parking areas and access drives on steep slope areas of proposed lots, and variance relief from Code §350-89.C to allow a building coverage greater than 50% for some lots. p. 3
- c. Fire and Ambulance p. 1