This is a monthly report packet for the Oconomowoc Utility Committee meeting on Tuesday, November 17, 2026. The clerk's memo says no items need action by the committee this month, so there are no votes listed. The packet is mostly department reports on electric, water, and wastewater work, plus a lead-in-water notice that residents will receive.

  1. The clerk says no items need to move forward for committee review this month. The reports are attached for information only. p. 1
  2. The water department is sending customers a notice about lead service lines. Customers may get a letter saying whether their property has a lead water line, and how to help confirm it. Touches: Water customers; property owners with a lead water service line. p. 8
  3. Water samples taken June to September 2026 showed lead above the action level of 15 micrograms per liter in some homes. A required notice about lead in drinking water will go to all water customers. Touches: All water customers. p. 8
  4. The city plans a request for proposal for engineering services to replace Transformer 8 at Cooney Substation. The project is budgeted, with construction in 2029. Touches: Electric customers. p. 6
  5. The utility billing software is moving to a newer version, NorthStar7, during the week of November 16. Billing may be affected during the change. Touches: Utility customers. p. 5
  6. A culvert crossing the Lake Country Trail, south of the wastewater treatment plant, will be enlarged to help reduce flooding near Worthington St. during heavy rain. Work is planned for the week of November 16. Touches: Residents near Worthington St. and the Cooney SS and utility area. p. 7
  7. Water meter exchanges for 5/8" to 1" meters continue as residents book appointments online. 142 exchanges remain to be scheduled for 2026. Touches: Water customers with 5/8" to 1" meters. p. 8
  8. A failed pump at the wastewater plant is being repaired by a contractor, with a turnaround of under one week expected. Fall biosolids hauling also began November 3. Touches: Sewer customers. p. 13
Words on this agenda, explained
Request for Proposal (RFP)
A written call asking outside firms to bid on and offer to do a job.
Action Level Exceedance (ALE)
Lead test results above the level the rules set, which means the utility must notify customers.
Substation
A site where electricity voltage is changed before it goes out to homes and businesses.
Culvert
A pipe or box passing under a road or path that lets water flow through.
Biosolids
The solid material left after sewage is treated, which is sometimes spread on farmland.

Written by AI from the agenda, Nov 14. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.