3 items on this agenda match the land-use topicsSubdivisions (2), Variances (1), Industrial land (1)
Agenda items (47)Show all 47
- B.…Description of Revision 3 3.7 Add reapplication clause for Variances- similar to Special and Use Exceptions 5 5.2.B3 Add statement "***=A minimum 0' setback may only be permitted if attached or touching adjacent buildings, driveway, or alley" for side setbacks in T5U, T-5C, and T-5U zoning districts 6 6.2.1 Add statement of one detached dwelling per lot for SD-2 6 6.2.2 Add statement of one detached dwelling per lot for SD-6 6 6.7.2 Removed C and MDU-20 zoning from districts that Cottage Courts are allowed 6 6.7.6 Change CO requirements to allow for COs to be issued if common areas are complete 6 6.7.7 Removed MDU 20 and C from chart, Change area per dwelling unit to 150% of underlying zoning district density, and Correct formatting error in chart 6 6.7.10 Change driveway requirements to allow for gravel with minimum arpon at entrance 13 13.7.11.D.3 Update restriction of types of… p. 2
- 1.…and consideration of FP 26-07 a request for Final Plat approval for “Northstar Industrial Park Lot 3” the southern portion of RetherFord Road in an I (Industrial) zoning district. - The applicant is Brett Brasher on behalf of OCEDA for the “Northstar Industrial Park Lot 3”. This is a minor subdivision that creates a new parcel for the relocated lift station and ingress/egress easement to the new parcel. OCEDA is requesting the subdivision to allow for a new lot to be created for a lift station owned by Starkville Utilities servicing the Northstar Industrial Park and surrounding area. The sole purpose of the new lot is for a lift station with associated facilities. No other buildings are being proposed on the lot. An easement will be provided to allow for access and servicing of the lift station. The Northstar Industrial Park final plat was approved by the Board of Aldermen on October… p. 3
- 2.…- The Country Club Estates Subdivision is located along South Montgomery, south of the Greenbriar Subdivision. The infrastructure installation for Country Club Estates Phases 3B, 3C, and 3D is complete and has met the City’s required inspections. According to Section 15.1.5 of the Unified Development Code, infrastructure is eligible for City acceptance after either 85% of lots have received Certificates of Occupancy or 7 years have passed since the final plat. For these phases, 7 years have passed since the final plat. This acceptance will release the developer from maintenance of the public infrastructure and turn it over to the City. The streets included are all or portions of Turnberry Ln, Cypress Point Rd, Somersett Rd, Royal Troon Rd, and Pine Valley Dr. The final plats for Phase 3B, 3C, and 3D are attached for reference. A surety has been secured for the remaining sidewalks that… p. 3