City of Starkville, MS · pop. 25K
Tue21Jul5:30 PM
Board of Aldermen
Tue Jul 21, 5:30 PM · Court Room, City Hall, 110 West Main Street, Starkville · 4 months ago
Agendastarkvillems.api.civicclerk.comMinutesstarkvillems.api.civicclerk.comMeeting page ↗starkvillems.portal.civicclerk.com
3 items on this agenda match the land-use topicsSubdivisions (2), Variances (1), Industrial land (1)
Agenda items (47)Show only the 3 matching
- A.Consideration of the Minutes of the July 7, 2026 Regular Meeting of the Mayor and Board of Aldermen of the City of Starkville. p. 2
- B.Consideration of the Minutes of the July 10, 2026, Special Call Meeting of the Mayor and Board of Aldermen of the City of Starkville. p. 2
- A.Mayor's Comments
- 1.Employee Introductions p. 2
- B.Board of Aldermen Comments p. 2
- A.Jermaine Banks- Transparency Around Crypto/Bitcoin Mining, the Potential Investors, and Impact. p. 2
- A.SECOND PUBLIC HEARING AND CONSIDERATION FOR AMENDING THE RENTAL HOUSING SECTION OF THE UNIFIED DEVELOPMENT CODE TO INCLUDE SHORT TERM RENTALS AS PART OF REVISION #14. - The Unified Development Code was adopted on December 19, 2019, and last amended on February 17, 2026. The only change between the first draft and the second draft is the clerical correction of a referenced law in the last sentence of the first paragraph of Section 17.6.2. The first public hearing was held by the Board of Aldermen on July 7, 2026. The Public Hearings were advertised in the Starkville Dispatch on June 12, 2026, and June 19, 2026. The proposed amendments are as follows: Proposed Revision #14 to the Unified Development Code July 2026 Section Number UDC Section Number Description of Revision 17 17.6.1 Added to the intent statement to include Short Term Rentals (STRs) 17 17.6.2.A Added STR to Registration Fee… p. 2
- B.…Description of Revision 3 3.7 Add reapplication clause for Variances- similar to Special and Use Exceptions 5 5.2.B3 Add statement "***=A minimum 0' setback may only be permitted if attached or touching adjacent buildings, driveway, or alley" for side setbacks in T5U, T-5C, and T-5U zoning districts 6 6.2.1 Add statement of one detached dwelling per lot for SD-2 6 6.2.2 Add statement of one detached dwelling per lot for SD-6 6 6.7.2 Removed C and MDU-20 zoning from districts that Cottage Courts are allowed 6 6.7.6 Change CO requirements to allow for COs to be issued if common areas are complete 6 6.7.7 Removed MDU 20 and C from chart, Change area per dwelling unit to 150% of underlying zoning district density, and Correct formatting error in chart 6 6.7.10 Change driveway requirements to allow for gravel with minimum arpon at entrance 13 13.7.11.D.3 Update restriction of types of… p. 2
- A.There Are No Items for This Agenda p. 2
- A.Consideration of a Resolution to Extend Additional Funding to the Golden Triangle Regional Airport Authority for the Air Service from Gtr to Dfw in the Amount Equal to 20 Per Cent of Three Hundred Thousand Dollars ($300,000.00) for an Additional Sixty Thousand Dollars ($60,000.00) as a Participating Sponsor. p. 2
- A.Airport
- 1.CONSIDERATION OF RENEWING THE GENERAL LIABILITY AND HANGARKEEPERS COVERAGE FOR THE AIRPORT. - The attached is an annual renewal policy. Aviation General Liability (AGL) and Hangarkeepers coverage protect airport operators, Fixed-Base Operators (FBOs), and service providers from bodily injury, third-party property damage, and damage to customer aircraft in their care, custody, or control. p. 3
- 2.Request Approval for five airport board members: Operations Manager R. Bouchillon, Airport Director R. Lincoln and Aldreman M. Brooks to attend the Mississippi Airport Conference Sept 30 - Oct 2 in Biloxi, MS at an estimated cost of $6,479.00. - MS Airport Meetings with FAA and MDOT p. 3
- B.Community Development and Planning Department p. 3
- 1.…and consideration of FP 26-07 a request for Final Plat approval for “Northstar Industrial Park Lot 3” the southern portion of RetherFord Road in an I (Industrial) zoning district. - The applicant is Brett Brasher on behalf of OCEDA for the “Northstar Industrial Park Lot 3”. This is a minor subdivision that creates a new parcel for the relocated lift station and ingress/egress easement to the new parcel. OCEDA is requesting the subdivision to allow for a new lot to be created for a lift station owned by Starkville Utilities servicing the Northstar Industrial Park and surrounding area. The sole purpose of the new lot is for a lift station with associated facilities. No other buildings are being proposed on the lot. An easement will be provided to allow for access and servicing of the lift station. The Northstar Industrial Park final plat was approved by the Board of Aldermen on October… p. 3
- C.Courts
- 1.There Are No Items for This Agenda p. 2
- D.Engineering
- 1.Consideration of approving permission to apply for funding from the 2026 Advanced Transportation Technologies and Innovation (ATTAIN) Program. - The Federal Highway Administration’s ATTAIN program provides competitive grants to deploy, install, and operate advanced transportation technologies to improve safety, mobility, efficiency, system performance, intermodal connectivity, and infrastructure return on investment. The program’s website is: https://highways.dot.gov/iija/fact-sheets/advanced-transportation-technologies-and-innovation The vision for this application, in partnership with Mississippi State University, is to install innovative traffic control and transit technologies to modernize and optimize the transportation network with an emphasis on data collection to inform operations, proactive responses to issues, and planning for future projects. p. 3
- 2.…- The Country Club Estates Subdivision is located along South Montgomery, south of the Greenbriar Subdivision. The infrastructure installation for Country Club Estates Phases 3B, 3C, and 3D is complete and has met the City’s required inspections. According to Section 15.1.5 of the Unified Development Code, infrastructure is eligible for City acceptance after either 85% of lots have received Certificates of Occupancy or 7 years have passed since the final plat. For these phases, 7 years have passed since the final plat. This acceptance will release the developer from maintenance of the public infrastructure and turn it over to the City. The streets included are all or portions of Turnberry Ln, Cypress Point Rd, Somersett Rd, Royal Troon Rd, and Pine Valley Dr. The final plats for Phase 3B, 3C, and 3D are attached for reference. A surety has been secured for the remaining sidewalks that… p. 3
- 3.CONSIDERATION OF APPROVAL OF CHANGE ORDER #3 TO THE ASPHALT OVERLAY TERM CONTRACT WITH FALCON CONTRACTING TO ADD A PAY ITEM FOR WALKING TRAIL PAVING. - The City has a term contract with Falcon Contracting for asphalt overlays. The primary scope of this contract is for City street work. There are areas of the Cornerstone walking trail that need asphalt repairs. This change order will add a new pay item for asphalt installation for walking trails. The normal cost to install asphalt is $166/ton for City Streets. The proposed pay item for walking trail paving is $200/ton. The extra cost accounts for slower production and more difficult access. When compared to pricing for similar projects, we believe the proposed pay item is a fair price for the City. Change Orders 1&2 were both for one year renewals of the term bid. p. 3
- E.Finance and Administration p. 3
- 1.REQUEST APPROVAL OF THE CITY OF STARKVILLE CLAIMS DOCKET FOR ALL DEPARTMENTS INCLUDING STARKVILLE UTILITIES DEPARTMENT AS OF JULY 16, 2026 FOR FISCAL YEAR ENDING 9/30/26, ACKNOWLEDGING THAT THE CITY CLERK HAS ATTESTED AND CERTIFIED ON THE COVER OF THE CLAIMS DOCKET THAT ALL CLAIMS ON THE DOCKET ARE TRUE, ACCURATE, LAWFUL AND PROPER TO THE BEST OF HER KNOWLEDGE, FOR PAYMENT PURSUANT TO HER DUTIES UNDER MISS. CODE SECTIONS 21-39-5, 21-39-7, 21-39-9, 21-39-17 AND 21-15-21. - Total Claims for the FY 26 Claims Docket Ending July 16, 2026 is $3,783,863.13 of which the claims amount for Starkville Utilities is $1,389,498.33. General Fund 001 $614,895.84 Restricted Police Fund 002 $747.16 Restricted Fire Fund 003 $1130.27 Airport Fund 015 $15,210.16 Restricted Airport 016 $148,118.56 Sanitation / Environmental Services 022 $28,948.64 State Forfeited Funds 151 $3420.00 Debt Service Fund 200… p. 3
- 2.Request Acceptance of the June 2026 Financial Statements of the City of Starkville, Ms. - N/A p. 3
- 3.REQUEST ACKNOWLEDGMENT OF PRIVILEGE LICENSES ISSUED BY THE CITY CLERK’S OFFICE FOR THE MONTH OF JUNE 2026 BY THE BOARD IN ACCORDANCE WITH MISSISSIPPI CODE 27-17-501. - FISCAL NOTE: Mississippi Code 27-17-501 The privilege taxes paid to the officer collecting same shall be reported by him monthly and paid into the proper depository, to the credit of the general fund, as are other taxes, except as otherwise provided by law, and each officer shall within twenty (20) days after the end of each month make to the county auditor, or in the case of a municipality, to the governing body of the municipality, a report of the licenses issued by him during the preceding month, upon such form as shall be prescribed by the county auditor or by the governing body. p. 3
- 4.CONSIDERATION OF THE Acceptance of City of THE FISCAL YEAR September 30, 2025 audit OF THE CITY OF STARKVILLE AS PREPARED BY WATKINS, WARD & STAFFORD, PLLC. - The City has received the completed 9/30/25 audit by Watkins, Ward and Stafford. The audit contained no findings. p. 3
- F.Fire Department
- 1.Consideration of Approval of the Low Quote from Wholesale Laundry Equipment SE in the Amount of $24,653.41 for Firefighter Gear Washer and Dryer. p. 4
- G.Human Resources
- 1.Request Authorization to Hire Haden McKee as Inventory Control Technician in the Starkville Utilities Department. - Funds Are Included in the Fiscal Year 2025/26 Budget. 50% of Pay — Account 903.00 (Electric Expense) 15% of Pay — Account 604.50 (Water Distribution) 15% of Pay — Account 704.50 (Wastewater Division) 10% of Pay — Account 804.50 (Water Treatment) 10% of Pay — Account 904.50 (Sewer Collection) p. 4
- 2.Request Authorization to Hire Jeromy Hill as a Temporary Sanitation Worker in the Sanitation & Environmental Services Department. - Budgeted from Line Item # 022-322-430-107 p. 4
- 3.Request Authorization to Establish a Landscape Architect Position Within the Engineering Department. - Budgeted from Line Item # 001-197-430-103 p. 4
- H.Information Technology p. 4
- 1.There Are No Items for This Agenda p. 2
- I.Parks
- 1.CONSIDERATION OF EXECUTING A DESIGN-BUILD CONTRACT WITH ARTISAN SKATEPARKS FOR THE PROPOSED SKATEPARK AT THE SPORTSPLEX. - A request for proposal (RFP) was done for design-build services for a proposed skatepark located at the Starkville Sportsplex on Lynn Ln. Proposals were received from three qualified companies. The proposals were reviewed by a selection committee and Artisan Skateparks was selected as the preferred design-build company. This contract will cover design and construction services required to build the skate park. A detailed results table of the RFP rankings is attached. p. 4
- J.Police Department
- 1.Police
- 1.There Are No Items for This Agenda p. 2
- 2.Code Enforcement
- 1.There Are No Items for This Agenda p. 2
- K.Sanitation Department p. 4
- 1.REQUEST AUTHORIZATION TO ADVERTISE FOR BIDS FOR CONSTRUCTION OF STARKVILLE CLASS I RUBBISH SITE, FINAL CLOSURE CONSTRUCTION ON AUGUST 26, 2026 at 10:00 AM. - The landfill is jointly owned by Oktibbeha County and the City of Starkville. The City of Starkville manages the landfill and due to the encroachment outside the borders of the certificated landfill area, the City purchased additional property and now needs to remediate the landfill so that it can be closed and provided with a clear record by MDEQ. The first step is to advertise for construction bids to make those needed remedial changes and then to provide the specific cover required by the state to legally close the landfill and bring it into compliance. p. 4
- L.Utilities Department p. 3
- 1.Consideration of accepting the low bid for the Water Supply Well No. 9 Rebid project from Double S, Inc. in the amount of $3,457,850.00 and authorizing the Mayor to execute a construction contract. - The project was initially advertised and received bids on April 21, 2026. Two bids were received; however, the lowest bid exceeded the project budget significantly and the Board approved to reject the bids and readvertise. The lowest bid was nearly $4.3 Million. The plans were slightly modified and the contract time was extended to accommodate more flexibility from a construction completion standpoint. This project was re-advertised and bids were received on the revised plans and contract time on Wednesday, June 24 at 10am. A full bid tabulation is attached with a summary of the three base bids received provided below. Double S, Inc. $3,457,850.00 Mid South Water, LLC $3,560,900.00 Donald… p. 4
- 2.Request authorization to accept the Engineering Services Agreement with AG Utility Services, LLC, for electrical engineering and consulting services on an as-needed basis. - This will replace the previous Engineering Services Agreement with Atwell and Gent, P.A. Atwell and Gent firm has provided regular engineering for our electrical system and also assisted with water production electrical design and communications. They have merged with Integrity PSC and will be operating under a new business name- A&G Utility Services, LLC. The staff, office location, and services provided will not change. p. 4
- 3.Consideration of approval of Task Order #6 Amendment #1 from Neel-Schaffer for additional professional services to apply for State Revolving Loan (SRF) for the Water Treatment Plant for Well #9. - These additional engineering services will assist Starkville Utilities in preparing the facilities plan, completion of the environmental assessments, submission of necessary paperwork, and facilitation of public notice necessary to submit the Water Treatment Plant planned for Well #9 for consideration of State Revolving Loan Funds (SRF). SRF funding is allocated to projects based on highest ranking, and if this project is selected, it would qualify for a 20-year low interest loan (interest rate is approximately 2%) and the full project amount ($3.5 Million) could be funded. Neel Schaffer believes that this project will rank high and there is a strong possibility of approval. Submitting an… p. 5