Public Works Services
Tue Jun 23, 8:30 AM · 5 months ago
Public Works and Engineer Services
Agendacolumbiacoga.api.civicclerk.comMinutescolumbiacoga.api.civicclerk.comRecording ▸YouTubeMeeting page ↗columbiacoga.portal.civicclerk.com
2 items on this agenda match the land-use topicsSubdivisions (2)
Agenda items (30)Show all 30
- 4.Independent Contractor Agreement with Hydrologics, Inc. for a Zero Discharge Flushing Program - This request is for an Independent Contractor Agreement with Hydrologics Inc., for a 20-day Zero Discharge Flushing program designed to aggressively scour water mains for cleaning. This agreement will allow Hydrologics to perform onsite water main cleaning for 20 business days. The Water Utility will select eight subdivisions that would work well with this technology. Hydrologics is the sole vendor to provide this technology for water main maintenance. They have been providing this service for over 10 years and have completed a pilot program in Columbia County. The cost of this service is $203,595.12 and will be funded by line code 511-5125-601081. p. 1
- 1.…Approve Resolution 26-11 to Increase the Speed Limit and Reclassify Kelarie Way to a Minor Collector Road History - Kelarie Way is a two‑lane roadway that serves as the primary entrance to the Kelarie Subdivision. Kelarie Way begins at Baker Place Rd and extends north for approximately 0.49 miles, crossing three neighborhood intersections before terminating at the roundabout connecting Dublin Loop and Bancroft Drive. Length = 0.49 miles Average Daily Traffic (ADT) = 2,464 # of Abutting Homes = 0 Current Posted Speed = 25 MPH 85th Percentile Speed = 37 MPH Proposed Posted Speed = 30 MPH Reclassifying Kelarie Way from a local road to a minor collector road with a 30 MPH speed limit aligns with the Department of Public Safety’s and GDOT’s recommendations, and allows the road to be added to the County’s Radar Permit for speed enforcement by the Sheriff’s Office. Funding - n/a Timeline - n/a p. 2