Agendacolumbiacoga.api.civicclerk.comMinutescolumbiacoga.api.civicclerk.comRecording ▸YouTubeMeeting page ↗columbiacoga.portal.civicclerk.com
2 items on this agenda match the land-use topicsSubdivisions (2)
Agenda items (30)Show only the 2 matching
- 1.May 26, 2026
- 1.New Business
- a.Deputy County Manager p. 1
- 1.Implementation of FM Live Fuel Point Hardware and Software with FuelMaster - Columbia County Fleet Services uses a solution from FuelMaster to dispense and track fuel usage for County vehicles. This solution is in place at the County’s two fuel islands. FuelMaster has informed the County that this older product is no longer being offered to new customers, and the replacement product (called FM Live) is already in the field. FM Live offers enhanced communications options, reporting, and automation features that the County can implement in the future. The move to FM Live will require the acquisition and installation of new head-end equipment at both fueling sites, plus an agreement with NBS (National Bank Services) to serve as the credit card processor for Fuelman transactions. The equipment and installation cost for the FuelMaster equipment and the FM Live solution is $24,533.50 from C&M … p. 1
- 2.Professional Services Contract with Booker + Vick Architects for the Columbia County Roads and Bridges Administration Office - This item is for the professional services contract with Booker+Vick Architects for the architectural and engineering services needed to rebuild the Columbia County Roads and Bridges Administration Facility due to fire damage. p. 1
- b.Water Utility
- 1.Change Order Number One with Blair Construction for Water System Improvements Cleaning Phase I - This request is for a closeout change order to complete the Water System Cleaning Project. Once the work began, unanticipated project conditions required modifications and value engineering to complete the project in an economical way while still meeting the required project objectives. We recommend a closeout change order reducing the approved project cost by $36,031.81. The Renewal and extension line code is 57037-25-015-695. p. 1
- 2.Purchase of Water Meters for FY26/27 from Sensus, Inc - Sensus is the sole-source vendor we use for our Advanced Meter Infrastructure. We have to maintain an inventory of meters to support replacements and new installations. Our current inventory is running low, and it is time to replenish our stock. This inventory enables us to respond quickly and efficiently to meet our customers' needs. This is a budgeted item for the Fiscal Year 2027. The total, including tariffs, is $953,143.00. Line Code 511-5120-522076.
- 3.Award 2026019-BID5100 to Blair Construction for the Hunter's Ridge Lift Station Replacement - This item is a request to award Bid No. 2026019-BID5100, Hunter's Ridge Lift Station Replacement, to the low bidder, Blair Construction. The project involves replacement of the Hunters Ridge Lift Station on Falcon Drive. The existing Smith & Loveless lift station will be replaced with a new duplex submersible lift station. The modifications also include upgrades to the force main piping and lift station influent line. A stationary generator shall be installed on the site for the new lift station. A total cost of $551,856.05 will be paid out of our Renewal & Extension line item 57037-25-015-694. p. 1
- 4.Independent Contractor Agreement with Hydrologics, Inc. for a Zero Discharge Flushing Program - This request is for an Independent Contractor Agreement with Hydrologics Inc., for a 20-day Zero Discharge Flushing program designed to aggressively scour water mains for cleaning. This agreement will allow Hydrologics to perform onsite water main cleaning for 20 business days. The Water Utility will select eight subdivisions that would work well with this technology. Hydrologics is the sole vendor to provide this technology for water main maintenance. They have been providing this service for over 10 years and have completed a pilot program in Columbia County. The cost of this service is $203,595.12 and will be funded by line code 511-5125-601081. p. 1
- c.Engineering Services p. 1
- 1.…Approve Resolution 26-11 to Increase the Speed Limit and Reclassify Kelarie Way to a Minor Collector Road History - Kelarie Way is a two‑lane roadway that serves as the primary entrance to the Kelarie Subdivision. Kelarie Way begins at Baker Place Rd and extends north for approximately 0.49 miles, crossing three neighborhood intersections before terminating at the roundabout connecting Dublin Loop and Bancroft Drive. Length = 0.49 miles Average Daily Traffic (ADT) = 2,464 # of Abutting Homes = 0 Current Posted Speed = 25 MPH 85th Percentile Speed = 37 MPH Proposed Posted Speed = 30 MPH Reclassifying Kelarie Way from a local road to a minor collector road with a 30 MPH speed limit aligns with the Department of Public Safety’s and GDOT’s recommendations, and allows the road to be added to the County’s Radar Permit for speed enforcement by the Sheriff’s Office. Funding - n/a Timeline - n/a p. 2
- 2.Lighting Services Agreements with Georgia Power to Upgrade Street Lighting at Various Locations - Phase IV - Location: (see below) Request: Approve the Lighting Services Agreements with Georgia Power to Upgrade Street Lighting at Various Locations - Phase IV History: Due to the HID (High Intensity Discharge) lighting technology becoming obsolete, Georgia Power is upgrading streetlights throughout the County from HID to LED (Light Emitting Diode) lighting. GA Power has been performing upgrades in phases with three (3) phases being previously approved by the Board on the following dates: Phase I approved July 2, 2024 Phase II approved July 1, 2025 Phase III approved December 16, 2025 The first three phases have been completed and Georgia Power has proposed Phase IV of its streetlight upgrade program, which includes upgrading 220 streetlights in 6 areas to LED lighting as summarized below. … p. 2
- 3.Non-Residential Gas Extension Contract with Atlanta Gas Light (AGL) to serve the installation of a Backup Generator for the Traffic Signal at the intersection of River Watch Pkwy and Baston Rd - Location – Intersection of River Watch Pkwy and Baston Rd (3528 River Watch Parkway) Request – Approve the Non-Residential Gas Extension Contract with Atlanta Gas Light (AGL) to serve the installation of a Backup Generator for the Traffic Signal at the intersection of River Watch Pkwy and Baston Rd History – The Traffic Engineering Department recently purchased budgeted natural gas backup generators to place at various high volume traffic signals, ensuring continuous traffic signal operations during power outages. A unit is scheduled for installation at River Watch Pkwy and Baston Rd. Accordingly, this contract secures AGL's services to extend the necessary gas utility line to the subject… p. 2
- 4.Contract #2026-3538 with Eleven-X to Purchase their Smart Parking System (eXactpark) for the Parking Deck and Parking Lots around the Performing Arts Center - Location – The project covers the Parking Garage and the surface lots surrounding the Performing Arts Center (PAC), specifically PAC Parking Lots A, B, and C. Request – Approve Contract #2026-3538 with Eleven-X to Purchase their Smart Parking System (eXactpark) for the Parking Deck and Parking Lots around the Performing Arts Center History - Parking congestion has become increasingly common in County-owned parking lots in Evans, particularly around the PAC during high-volume events. In an effort to mitigate this, Staff began researching options for automated parking solutions. Staff identified four (4) potential solutions and requested quotes and specifications from each of the respective vendors - Eleven-X Parking Logix Mistall… p. 2
- 5.Contract# 2025-3325, Change Order 1 for TIA 2, Group 6 Resurfacing with Reeves Construction - Location - Stevens Creek Rd Request - Approve Change Order 1 for TIA 2, Group 6 Resurfacing with Reeves Construction in the amount of $287,735.00. History - Stevens Creek Rd was included on the TIA 2 resurfacing list. Due to funding restrictions, staff reduced the type of remediation method to rehabilitate the roadway. Additional funding through LMIG is available and staff requested a change order from Reeves Construction to perform the corrective measures originally determined to be needed. Reeves original bid was $324,556.50; they have extended their pricing for the original items and quoted the additional items needed to mill and overlay for a total of $612,291.50. Funding - $287,735.00 (LMIG) Timeline - N/A p. 2
- 6.Facility Use Agreement with the Clarks Hill Beekeepers Association for use of the Baker Place Road Municipal Solid Waste Landfill - Location: Baker Place Road Municipal Solid Wase Landfill ("Landfill"), 590 Baker Place Road, Grovetown, GA, 30813. Request: Approve the Facility Use Agreement with the Clarks Hill Beekeepers Association for use of the Baker Place Road Municipal Solid Waste Landfill History: County Staff and the Clarks Hill Beekeepers Association ("Association") have collaborated to establish seven (7) bee colonies at the closed Landfill site. Staff would like to establish an official agreement with the Association for the Association to maintain the hives and use the land for club-based educational workshops. If approved by the Board, these recreational activities will also require approval from the Georgia Environmental Protection Division through a minor modification of… p. 2
- 7.Contract# 2026-3609 with Surveying and Mapping, LLC for Prior Rights Research for the Hereford Farm Rd Widening Project, PI# 012865 - Location - Hereford Farm Rd Request - Approve Contract# 2026-3609 with Surveying and Mapping, LLC (SAM) for Prior Rights Research for the Hereford Farm Rd Widening Project, PI# 012865, in the not-to-exceed amount of $30,000.00. History - Typically, when utility relocations are required for a construction project, the project owner must bear the full cost unless they can demonstrate "prior rights" to the land. The Hereford Farm Rd Widening Project requires Georgia Power to relocate up to 260 poles with estimated costs exceeding $4M. During a preliminary project review in preparing their proposal, SAM estimates Georgia Power likely holds prior rights to only about 40% of the affected poles; therefore, SAM estimates they can provide a project savings of up… p. 2
- 8.2026 Annual Renewal of Columbia County's Title VI Plan relating to Federal Assistance for Transportation Programs and Activities - Location - N/A Request – Approve the Annual Renewal of Columbia County's Title VI Plan relating to Federal Assistance for Transportation Programs and Activities History - Title VI of the Civil Rights Act of 1964 protects people from discrimination based on race, color, or national origin in programs or activities that receive Federal financial assistance. To be eligible for federal funding of any type, local governments with populations less than 100,000 must acknowledge a Title VI agreement. When the population becomes greater than 100,000 they must develop and implement a Title VI Plan. The Title VI Plan for Columbia County was developed and originally approved in March of 2015. The FHWA requires that the Title VI Plan be updated and/or renewed annually,… p. 2
- d.Other Committees
- 2.Items Added at the Meeting p. 2
- 1.Water Utility
- a.Year to Date Budget Report p. 2
- b.Water and Sewer Construction Projects Report p. 2
- 2.Engineering Services p. 1
- a.Roadway Projects Report p. 2
- b.Roadway Resurfacing Report p. 2
- 1.Property A - Easement for the Washington Road Corridor Traffic Improvements Project On October 7, 2025, the Board approved a construction contract with the NGT Group for intersection improvements and mast arm upgrades along the Washington Rd (SR 104) corridor. This temporary construction easement is needed for the work to be done at the intersection of Washington Rd and Evans to Locks Rd. Tax ID Name Acreage Total Parcel ID# 072A 110 Evans Enterprise of Augusta, LLC 0.004 AC of Temporary Construction Easement Donation The project has been on hold while the mast arms were being fabricated and shipped. They have recently been received by the vendor and are currently awaiting GDOT's final inspection and approval of all materials. Work is expected to begin within the next four (4) calendar weeks.
- 2.Property B - Easement for the Horizon South Pkwy / Chamblin Rd Connector Project The Horizon South Pkwy and Chamblin Rd Connector Project consists of a new 1.25 mile, 2-lane road with a center turn lane connecting Chamblin Rd to Horizon South Pkwy. This project will also extend Gateway Blvd by half a mile to connect with a new roundabout along the aforementioned connector road. Key upgrades will include a 500' vehicular bridge over Mill Branch, traffic signal upgrades at Chamblin Rd (Canterbury Farms Pkwy), and a traffic signal on Horizon South Pkwy. Staff has negotiated with the following property owners to obtain right-of-way, permanent easements, and/or temporary easements for this road project. Tax ID Name Acreage Total Parcel ID# 062 1710 Calvin Tolbert, as trustee under Calvin Tolbert Living Trust 0.01 acres of Temporary Easement Donation
- 3.Property C - 07/01/2026 - After Committee and before BoC it was found that this item was not needed. Therefore, it didn't go to the July 07, 2026 BoC. Purchase of the additional permanent easements for Branch Spring Connector Project. Parcel Name Permanent Temporary Cost 062 085S Branch Springs Development, LLC 0.076 0.00 Donation