GovMeet
Sign in
Sat5Dec

OV120526

Sat Dec 5 · in 13 days

This agenda in plain words

Leer en español

This is a Town of Oro Valley, Arizona, meeting packet for a board meeting on Saturday, December 5, 2026. The text is not a standard agenda with numbered items. It is a stack of engineering letters, drainage reports, calculation sheets and computer model printouts about storm water flow for the Stone Canyon 8 neighborhood in Rancho Vistoso Neighborhood 12. It does not list a clear item for a vote or a public hearing.

  1. A 2007 letter from the engineering firm WLB Group explains how storm water flow from concentration point CP 19 is handled, including a culvert under Rancho Vistoso Boulevard. It says the expected increase in flow would not hurt how the culvert works. Touches: Stone 8 subdivision, the Honeybee development, and people near the CP 19 wash and Rancho Vistoso Boulevard. p. 1
  2. A 2007 addendum to the drainage report revises flow estimates for watersheds 16.0E, 17.0E and 18.0E, and the flow numbers for the southeast corner of the property. Touches: Stone Canyon 8 property, southeast corner, Rancho Vistoso Neighborhood 12. p. 7
  3. A 2015 note from Town of Oro Valley engineer Fritz Laos says he approved the revised detention plan for RVNH 12, Stone 8, with no more comments. Touches: Stone 8 subdivision. p. 5
  4. Calculation sheets and computer model printouts estimate peak storm water flows (100-year storm) at several concentration points, before and after development. Touches: Stone 8 and nearby properties that drain into these wash channels. p. 11
Words on this agenda, explained
Concentration point
A spot on the land where storm water from an area collects and is measured, such as CP 19.
100-year peak
The highest expected flow of storm water in a storm that is expected to happen on average once every 100 years.
Cfs
Cubic feet per second, a measure of how much water is flowing.
Detention
Holding back storm water on a site so it does not flow off all at once.
Wash
A dry creek bed that carries water only when it rains hard.

Written by AI from the agenda, Nov 14. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.

1 item on this agenda matches the land-use topicsSubdivisions (1)

Agenda items (1)Show only the 1 matching