Demolition- Request for Proposals- 1810 N. Illinois and 22 Twilight
This agenda in plain words
Leer en españolThis is a Village of Swansea request for bids (called a Request for Proposals) to tear down and clean up two properties: 1810 N. Illinois St. and 22 Twilight Dr. Sealed proposals are due to the Village Clerk at 2 p.m. on December 7, 2026, and will be opened and read aloud right after that at the Swansea Government Center. The packet also includes asbestos inspection reports for both houses, which find asbestos in some floor tile and mastic that must be removed before demolition.
- Bids are asked for to demolish and remove the one-story property at 1810 N. Illinois St. and clear the site, including foundations, slabs, concrete and debris. Touches: Contractors; neighbors of 1810 N. Illinois St.. p. 2
- Bids are asked for to demolish and remove the one-story wood-frame residence at 22 Twilight Dr. and clear the site, including foundations, slabs, concrete and debris. Touches: Contractors; neighbors of 22 Twilight Dr.. p. 2
- Sealed bids are due to the Village Clerk by 2 p.m. on December 7, 2026. Bids will be opened and read aloud right after the deadline, and the public is invited to attend. Touches: Contractors and interested residents. p. 5
- Bidders must visit and inspect both properties before they submit a bid. Touches: Contractors bidding on the work. p. 3
- The asbestos report for 22 Twilight Dr. finds asbestos in floor tile and mastic. A licensed contractor must remove it before demolition, and a 10-day notice must go to the state EPA (IEPA) first. Touches: Neighbors of 22 Twilight Dr.; contractors. p. 10
- The asbestos report for 1810 N. Illinois St. finds asbestos in floor tile and mastic. A licensed contractor must remove it before demolition, and a 10-day notice must go to the state EPA (IEPA) first. Touches: Neighbors of 1810 N. Illinois St.; contractors. p. 29
- The winning bidder must provide insurance and performance and payment bonds, each equal to the full contract amount, and sign a contract within 15 days of award. Touches: Winning contractor. p. 2
- Each bid must include a security deposit equal to 5% of the total bid amount. Bids stay valid for 30 days after opening. 5% of the total proposal amount. Touches: Contractors bidding on the work. p. 2
- The Village does not have to pick the lowest bid. It may also choose to award one property, both together, or none, and may consider qualifications and experience. Touches: Contractors bidding on the work. p. 5
- Workers must be paid prevailing wage under the Illinois Prevailing Wage Act, and certified payroll records must come with payment requests. Touches: Contractors and their workers. p. 4
Words on this agenda, explained
- Request for Proposals
- A public request asking companies to send in sealed bids for a job.
- Proposal security
- A deposit sent with a bid to show the bidder is serious; here it is 5% of the bid total.
- Performance and Payment Bonds
- Promises from an insurance company that the contractor will finish the job and pay its bills.
- Non-friable
- Asbestos bound tightly in a material so it does not crumble easily, but it can release fibers if sanded, ground or cut.
- Prevailing Wage Act
- A state law that sets minimum pay rates for workers on public construction jobs.
Written by AI from the agenda, Nov 16. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
Agenda items (1)
- …bmission constitutes acknowledgment of site conditions. The successful proposer shall furnish insurance, performance bond, payment bond, and executed contract within fifteen (15) days of award. SCOPE OF WORK 1810 N Illinois ST.: Complete demolition and removal of the one story property and all related components including but not limited to all foundations, footings, slabs, accessory structures, concrete, and debris. 22 Twilight Dr.: Complete demolition and removal of the one-story wood-frame residence, all foundations, footings, slabs, accessory structures, concrete, and debris. Both properti… p. 2