GovMeet
Sign in

Watches › Moratorium Watch › Battery storage › Town of Frankfort

Battery storage moratorium

Town of Frankfort, NY

Status
Proposed On an agenda; no adoption read yet
Pauses
Battery storage
Seen
2 meetings, Jul 23, 2026 to Aug 20, 2026

Every meeting it was on

Newest first: one agenda line a meeting, with the words that show it.

  1. Aug 20, 2026
    Proposed · Meetings

    “establishing a six month moratorium on application, approvals, and/or constructing or installation of solar energy systems, solar farms, wind energy systems, windmills, and/or battery energy storage system (BESS)”

    The agenda line · the meeting

  2. Jul 23, 2026
    Proposed · Meetings

    “PROPOSED LOCAL LAW #2, 2026 — Moratorium on applications, approvals, and/or construction or installation of solar energy systems, solar farm, wind energy systems, windmills, and/or battery energy storage systems (BESS)”

    The agenda line · the meeting

The status comes from these lines: the AI says what each one did, and a vote the minutes record as passed counts as done. We may not yet have read every meeting. All meetings of Town of Frankfort.