Town of Cheshire, CT · pop. 29K
Wed18Nov7:00 PM
Public Building Commission
Wed Nov 18, 7:00 PM · Town Hall, Room 210, 84 South Main St., Cheshire · 4 days ago
Agendacheshirect.api.civicclerk.comMinutescheshirect.api.civicclerk.comMeeting page ↗cheshirect.portal.civicclerk.com
This agenda in plain words
Leer en españolThis is a regular monthly meeting of the Cheshire Public Building Commission, held at Town Hall. The agenda lists old business on several town building projects, including a pool boiler and pool roof, a youth center, a prisoner cell renovation, and a high school ventilation unit. No new votes on major new spending are listed, and most items are updates on projects already underway.
- Update on the pool boiler replacement. The boilers have not recently tripped, and the contractor gave a warranty through June 30, 2027. Touches: Town pool users and the Public Building Commission. p. 2
- Update on the pool roof replacement. The main roof work is done, but the final inspection is not finished. A problem where the wall material was cut for new metal flashing is being reviewed, and a change order is proposed to fix it. Touches: Town pool users. p. 2
- Update on the Harmon Leonard Jr. Youth Center improvements. The project is in the budget proposal and is waiting for Council funding before it can move forward. Touches: Youth Center users. p. 2
- Update on the prisoner cell renovations (design phase). The project is on hold while it waits for Council action. p. 1
- Update on the regenerator ERV (ventilation) installation at Cheshire High School. The project is on hold. Touches: Cheshire High School. p. 1
- Review of the minutes of the October 21, 2026 regular meeting. p. 1
- Review of the monthly financial status report. p. 1
Words on this agenda, explained
- Old business
- Items the commission already discussed earlier that are still being worked on and come back for an update.
- Consent calendar
- A group of routine items that are usually approved together in one vote without separate discussion.
- Subcommittee Chair
- The commission member who leads a smaller group that looks at a specific project before the full commission acts.
- EIFS
- A wall covering made of foam and a thin coating, sometimes called synthetic stucco.
- Flashing
- Thin metal or other material used to seal joints so water does not get into a roof or wall.
- CO
- A change order, which is a written change to a contract's work or price.
Written by AI from the agenda, Nov 17. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
Agenda items (1)
- A.Projects: