Agenda items (11)
- 1.Approve Minutes from the July 22 and August 26, 2026 Meetings p. 1
- 2.Ordinance 1390B Revision of Sections 38-302, 38-304, 38-306 and 38-308 Bicycles and Play Vehicles Regarding Definition and Operation of Bicycles, Electric Bicycles, Electric Motorized Devices, Electric Scooters and Personal Assisted Mobility Devices (Requested by Council) p. 1
- 3.Approval of Bid Deemed Most Advantageous to the City of Antigo for Cured In Place Pipe Lining - Bids were solicited for cured-in-place pipe lining (CIPP) of approximately 2,000 lineal feet of eight-inch sanitary pipe. The bid tab is attached. p. 1
- 4.Approval of Bid Deemed Most Advantageous to the City of Antigo for a Wheel Loader Plow and Wing Attachment - Bids were solicited for a wheel loader plow and wing attachment for snow removal. The bids were due September 23, 2026 at 11:00 am so a bid tab is not available. I will bring the bid tab to the Public Works meeting for my recommendation. p. 1
- 5.Approval of Bid Deemed Most Advantageous to the City of Antigo for Replacement of Water Plant Boilers - There is currently $100,000.00 budgeted in the 2026 Capital Improvements budget to replace the existing boilers at the water treatment plant. The boilers were installed in 2008 and have had multiple failures requiring repairs in the last few years. Bids were opened on September 9, 2026. Three bids were received from August Winter & Sons, JF Ahern and Rohde Bros. I asked for optional replacement of existing heat fans if there was available room in the budget, but that does not seem to be the case. For replacing the existing boilers and circulating pumps, the totals are: August Winter & Sons: $94,000 Rohde Bros: $89,250 JF Ahern: $108,750 My recommendation to the committee is to accept the bid from August Winter & Sons to replace the existing boilers and circulating pumps for a total of … p. 1
- 6.Approval to Add Autistic Child Sign on the 800 Block of Sixth Avenue - A parent of an autistic child has requested signage to be placed around their home in the 800 block of Sixth Avenue. We would place one sign on each side of the road so that it is visible in both directions. The cost of the signs would be less than $200.00. We have signage similar to this in other areas, such as Deaf Child.
- 7.Repair of Two Fifth Avenue Lift Station Pumps - The rotating elements in the two onsite pumps in the lift station at the corner of Fifth Ave and Field Street need to be replaced. I received a quote from Crane Engineering for the replacement and installation of these rotating elements. The price per rotating element is $7,182.00 plus installation and travel, $2,500.00, for a total of $9,682.00 each. I asked Crane Engineering about the cost of new pumps. New pumps would cost $11,862.00 each, not including installation. I am asking the committee to approve the replacement of these rotating elements for a total cost of $19,364.00.
- 8.Discuss Available Lots for Home Building for Sale (Referred by Alderperson Dieck) p. 1
- 9.Consider Snow Removal on Sidewalks Downtown (Referred by Alderperson Dieck) p. 1
- 10.Downtown Striping Reviewed (Referred by Alderperson Dieck) p. 1
- 11.Repair of Council Chamber and Downtown PA Systems (Referred by Alderperson Dieck) - Administration has been in contact with the City of Wausau regarding the downtown sound system. Mr. Werner and I spoke with each other on September 3rd. p. 1