Board of Commissioners Meeting
Agendagreenecoga.api.civicclerk.comAttachment2026-07-20 LAKE SOCIETY_PRELIMINARY PLAT PLANAttachmentSouthwyck MinutesAttachmentDevelopment Agreement (Airabella) FinalAttachmentBLUFFS AT CAREY STATION - PH 2 - 10 - FPAttachmentBudget adjustment sheets combined
Minutesnot posted yet
Meeting page ↗greenecoga.portal.civicclerk.com3 items on this agenda match the land-use topicsSubdivisions (2), Planned developments (1), Water & sewer (1)
Agenda items (7)Show only the 3 matching
- 1.Minutes from the October 13, 2026 Regular Monthly Meeting and the September 8, 2026 Executive Session. p. 1
- 1.Amendment to the Preliminary Plat for Lake Society, 317.873 acres, containing 559 dwellings - Atwell, LLC (Applicant) - The proposed site is situated on 317.873 acres of Tax Parcels #0310000020, #031000002A, and #031000002B and contains 559 dwellings, of which 445 are single family home sites and 114 are multifamily town homes and flats. Of the 317.873 acres platted, 38.62% is open space and common areas. The proposed project received zoning approval September 12, 2023, with the following stipulations; the density does not exceed 1.78 units per acre, open space is at least 35%, short-term rental is prohibited, the minimum lot size is 7,000 square feet, and the community is age-restricted. With the additional proposed lots, the density will be 1.76 units per acre and open space is 38.62%. The proposed project meets all zoning conditions. p. 1
- 2.Final Plat for The Bluffs at Carey Station, Phase 2, 31.02 acres, 85 Lots — Dream Finders Homes (Applicant). - The project is situated on 31.02 acres of Parcel Number 0360000070 . Of the 31.02 acres platted, 14.04 acres are in lots, 3.62 acres are in right-of-way, and 13.36 acres are in open space. The project is zoned PUD. All lots will be serviced by Piedmont Water Resources LLC. The required maximum density is 4 units per acre, and the provided density is 2.74 units per acre. p. 1
- 1.Development Agreement with Red Clay Development Group, LLC (Traffic Light) - Red Clay Development Group, LLC, as part of the Airabella development, has submitted a traffic study to the Georgia Department of Transportation. The subject traffic study necessitates the potential construction of a temporary signal and future roundabout at the intersection of Lake Oconee Parkway with Carriage Lane and Airabella Boulevard. The signal request from DOT makes the County responsible for utility costs associated with operation of the signal and installation costs. However, it is our understanding that a request for a signal must be considered prior to the consideration of a roundabout. Ultimately, DOT is considering the construction of a roundabout at the subject intersection. So that the County will not be responsible for any portion of the construction or operation of the proposed temporary… p. 1
- 2.Contract for Bridge Deck Rehabilitation - Cold Springs Road - The bridge deck at Cold Springs Road is in need of repair. Massana Construction, Inc. has provided a price of $96,204.61 for the rehabilitation of the full bridge deck and replacement of guardrail. A contract with the appropriate bond has been provided for consideration. Funding for the proposed project will be provided through TSPLOST. p. 1
- 3.Resolution for TREES Grant - House Bill 223, the Timberlands Recovery, Exemption, and Earnings Stability (TREES) Act, authorizes Greene County to provide temporary property tax relief for eligible standing timber damaged by Hurricane Helene. The relief applies to timber taxes levied during the final quarter of 2024 and throughout 2025. To qualify for state grant funding to offset lost tax revenue, the Board of Commissioners must adopt a resolution authorizing the relief and submit an application to the Georgia Department of Revenue. Grant funding is determined based on historical timber tax revenues, estimated revenue losses, and storm damage. The grant amount is estimated to be $37,305.16.
- 4.Budget Adjustments - Various budget adjustments have been identified by staff in relation to Fiscal Year 2026. Adjustments range small overages in various departments, transit program expenses, wastewater collection system expansion, and additional revenues in Special Revenue funds.