- …ttendance Discuss status of 2020 Community Connectivity Grant; and take any necessary action to move project construction forward; Discuss 2022 STEAP Grant bids and SLR bid analysis; and take any necessary action and make recommendations to Town Council; Discuss status of ARPA funds and other funds set aside for and/or available for sidewalk projects; Public participation. Approve minutes of prior STF meetings on 4/13/26. Adjournment. Submitted By: Carla M. Perugini-Erickson p. 1
- …ched SLR's bid analysis memorandum for the State Route 69 Sidewalk Extension and Pedestrian-Level Illumination Project. Our review evaluated the four bids received on September 30, 2026, including contractor responsiveness, bid pricing, comparison to the Engineer's Estimate, contractor qualifications, and recommended next steps. The apparent low bidder is Priority Landscaping LLC with a bid of $850,535.00, which is approximately 34% above the Engineer's Opinion of Probable Construction Cost of $563,360.00. Based on our evaluation, we recommend that the Town first assess the availability of loc… p. 1
- …x Collector/Grants Director Date: October 6, 2026 Project No. 141.13129.00014 RE: State Route 69 Sidewalk Extension and Pedestrian-Level Illumination Bid Analysis _ SLR International Corporation (SLR) has completed its evaluation of the bids submitted for the State Route 69 Sidewalk Extension and Pedestrian-Level Illumination project in Prospect, Connecticut, on September 30, 2026. A total of four bids were received from the following contractors: Priority Landscaping LLC, Complete LLC, Mather Corporation, and Schultz Corporation. Each bidder was determined to be responsive to the bid submissi… p. 2
- …Landscaping LLC), the second-lowest bidder (Complete LLC), and the third-lowest bidder (Mather Corporation) for the items noted above. The Low Bidder Variance shown in the table represents the percentage difference between the apparent low bidder’s unit price and the Engineer's Estimate. Item No item Description Engineer's Priority Complete Mather Low Bidder Estimate Landscaping LLC LLC Corporation Variance 1 ] 1 | {0201001 Clearing and Grubbing $6,000/LS | $20,000/LS | $36,000/LS $43,425/LS +233% | 0406003A Pavement Repair $80/SY $100/SY $130/SY $255/SY +25% | 0922500 | Bituminous Concrete _… p. 3
- …irements, inspection coordination, and compliance with project specifications Next Steps It is important to note that the Town of Prospect (Town) was awarded a $500,000 Small Town Economic Assistance Program (STEAP) grant in 2022 for the project. As part of the grant application, the Town committed $125,000 in matching funds, approximately $68,000 of which has already been expended, leaving an estimated $57,000 in remaining p. 4
- …ension and Pedestrian-Level Illumination SLR Project No.: 141.13129.00014 ee Ee any other payment item to help minimize the risk of cost overruns and change orders during construction. The concerns listed in the Contractor Evaluation shall also be discussed to confirm the contractor's prior experience and familiarity with CTDOT standards and construction on state roadways. The meeting shall take place prior to the contract award. e Given the requirements set forth by the Connecticut Department of Transportation (CTDOT), if the Town decides to proceed with awarding a contract, the Town shall su… p. 5