Columbia County, GA · pop. 160K
Tue1Sep6:00 PM
Board of Commission
Tue Sep 1, 6:00 PM · 3 months ago
Board of Commissioners Meeting
Agendacolumbiacoga.api.civicclerk.comMinutescolumbiacoga.api.civicclerk.comRecording ▸YouTubeMeeting page ↗columbiacoga.portal.civicclerk.com
8 items on this agenda match the land-use topicsPlanned developments (3), Rezoning (3), Variances (2), Subdivisions (1), Special use (1)
Agenda items (38)Show only the 8 matching
- 1.August 18, 2026 Commission p. 1
- 2.August 18, 2026 Executive Session p. 1
- 1.Community and Emergency Services Committee p. 1
- a.Animal Services Donations - The following would like to donate a total of $4,220.00 to Columbia County Animal Services for the medical care of shelter animals: Carolina Butt $120.00 ASPCA/Gerald Jones Subaru $4,000.00 Subaru Loves Pets partnership in October Anonymous Citizen $100.00
- b.Christmas Lighting Services Agreement with Megah, LLC. - The "Christmas in Columbia County" light displays at Evans Towne Center Park drew 147,000 in total attendance in 2025, with 102,000 unique visitors. To supplement the 40 county-owned light displays and 60-foot Christmas Tree set up by Parks staff, a professional Christmas lighting vendor is used to provide, install, and maintain lights on designated buildings, landscape features, and structures at Evans Towne Center Park and Evans Market Pavilion. Proposals for RFP# 2026024-RFP1010: Christmas Lighting Services were opened on June 17, 2026. Four vendors responded to the RFP and attended the mandatory pre-proposal meeting held on Tuesday, June 30, 2026, at 10:00 a.m. at Evans Towne Center Park. All four proposals were reviewed, evaluated, and scored by an evaluation panel consisting of representatives from various county divisions…
- 2.Public Works and Engineering Services Committee p. 1
- a.Purchase from MHC Kenworth a Bucket Truck for Traffic Engineering - Fleet Services and Traffic Engineering worked with the State of Georgia Contract holder, MHC Kenworth, on a quote for a Versalift Bucket Truck. This will replace Shop # 1442, which is a 2012 International Bucket Truck. p. 1
- b.Purchase from Pearson Peterbilt a 567 Dump Truck for Stormwater - Fleet Services and Stormwater worked with the State of Georgia Contract holder, Peterbilt, on a quote for a 567 Dump Truck. This Dump Truck will be an addition to their Fleet. Multiple crews within Stormwater will use this dump truck to haul materials in and out on their pipe replacement projects. p. 1
- c.Purchase from Alan Jay Fleet Sales Two Chevrolet Tahoes for the Fire Department - Fleet Services worked with Alan Jay Fleet Sales, who is the Sourcewell Contract holder, on a quote for two police package Tahoes for the Fire Department. The Tahoes will be purchased to replace Shop # 3581 and 3542. Replacement Vehicles Shop # Year Make Model Mileage Maintenance Cost 3581 2012 GMC Yukon 139,512 $14,462.43 3542 2010 Ford Crown Vic 110,521 $7,042.14 p. 1
- d.Change Order Number One with PF Moon and Company for the Clarks Hill WTP Hypochlorite System Improvements project - This Change Order No. 1 request is for the Clarks Hill WTP Hypochlorite System Improvements includes required structural, mechanical, electrical, and related modifications associated with the ClorTec equipment submittals, along with installation of a new 6‑inch drain at the existing peroxide containment structure. The total change order amount is $121,142.00. The Renewal and extension line code is 58037-39-015-692. p. 1
- e.Purchase of a 140HP Influent Pump from Xylem Water Solutions, USA., Inc. for the Little River Plant Pump #6 - The influent pumping station #6 at the Little River WPCP is critical, as all flow to the plant passes through this station. Over the past ten (10) years, we have encountered significant reliability issues with the station. The existing 140 HP submersible pump is currently in need of repair or replacement. We are proposing to replace the existing pump with a Flygt pump due to our positive experience with the reliability of Flygt pumps. This is a budgeted item for the Fiscal Year 2027. The total, including freight, is $130,390.36. Line Code 511-5115-601081. p. 1
- f.Awarding 2026025-RFP5105 to Denali Water Solutions, LLC for the Water Treatment Residuals Removal and Disposal Project - This request is for approval of a Water Treatment Residuals Removal and Disposal agreement. Columbia County accepted sealed proposals from qualified firms to ascertain a vendor to remove and dispose of water treatment residuals from the Jim Blanchard and Clarks Hill WTP. The selection of Denali Water Solutions was based on the review of a Request For Proposal (RFP) process. Water Treatment residuals are stored in ponds onsite at each drinking water plant, the residuals are the biproduct of the treatment process. The removed solids will be paid for in wet tons removed and disposed. The mobilization cost to Jim Blanchard WTP is $17,740.00 and $14,200.00 to Clarks Hill WTP. The cost per wet ton removed and disposed is $61/wet ton. The current budget for water treatment… p. 1
- g.Purchase of a Gas Chromatograph/Mass Spectrophotometer from Fisher Scientific Company - Approval request for the purchase of a gas chromatograph/mass spectrophotometer from Fisher Scientific Company. Fisher Scientific has a state contract # of 99999-001-SPD0000156-0003. The gas chromatograph/mass spectrophotometer is a laboratory instrument used to separate and measure volatile substances. The Central Laboratory can use it to measure the taste and odor-causing compounds Geosmin and 2-Methylisoborneal in our raw water sources. This will allow us to optimize the operation of the UV Advanced Oxidation Process at the water treatment plants, saving money on chemical costs. The total cost for this instrument is $247,943.05. This is a budgeted item line code 511-5110-601081. p. 1
- h.AT&T Encroachment Agreement at Parcel 042 156M for the Euchee Creek Harlem Interceptor Project - Approval is requested to enter into an encroachment agreement with AT&T to allow the installation of one 18-inch PVC sanitary sewer line associated with the Harlem Interceptor Project. The proposed crossing is located within AT&T’s easement at 6245 Harlem Grovetown Rd, Grovetown, GA Parcel ID 042 156M, Extension and Renewal Line Code 58037-39-015-687. p. 2
- i.Resolution 26-18 Concerning a Determination to Abandon and Sell a Portion of Morris Callaway Road - Location - The section of Morris Callaway Rd and Right-of-Way extending from Bill Dorn Rd south, approximately 1,200 feet, to the terminus of county right-of-way. Request - Approve this second and final Resolution 26-18 to Abandon and Sell a Portion of Morris Callaway Road. History - Established in 1964 by the State Highway Department as a service road during the construction of Interstate 20 (I-20). Shifted traffic patterns have left this final section obsolete and unnecessary for the county road network. Funding - No funding required. Timeline - Upon adoption, the property will be sold according to state law. p. 2
- j.Resolution 26-19 and Project Delivery Agreement (IGTIA2700551) with GDOT for the Construction of the Hereford Farm Rd Widening Project, PI 0012865 - Location - Hereford Farm Rd from Columbia Road to N. Belair Rd. Request - Adopt Resolution 26-19 and approve the Project Delivery Agreement (IGTIA2700551) with GDOT for the Construction of the Hereford Farm Rd Widening Project, PI 0012865 History - Staff received the Project Delivery Agreement (PDA) from GDOT for Columbia County to administer the services necessary for the Construction of the Hereford Farm Rd Widening Project. The PDA requires a resolution identifying the authorized individuals from the County legally able to act on behalf of the Board of Commissioners as it relates to the project. Funding - N/A (eventual project-related funding will be reimbursed through TIA 2 & HB170) Timeline - N/A (project to be advertised late 2026) p. 2
- k.Contract #2026-3683 with East Coast Grading, Inc. for Building B & C Parking Lot Repairs/Overlay and Striping - Location - Building B and C Parking Lots at the Government Complex, Evans, GA Request - Approve Contract #2026-3683 with East Coast Grading, Inc. for Building B & C Parking Lot Repairs/Overlay and Striping in the amount of $101,938.40. History - Various repairs need to be made to the remnant parking areas between the new Building A Parking Lot and Faircloth Drive now that Building A has been substantially completed. The work includes deep patching, milling, pavement overlay, and re-striping with thermoplastic. The recently completed Building A and Justice Center parking will also be re-striped with thermoplastic. The thermoplastic striping is expected to last upwards of ten years compared to standard parking lot paint striping, which has a life expectancy of 2-3 years. Staff… p. 2
- l.Facility Use Agreement with UGA Extension / 4-H for the Trap Shooting Program at the Baker Place Road Municipal Solid Waste Landfill - Location: The closed Baker Place Road Municipal Solid Waste Landfill (“Landfill”) located at 590 Baker Place Road, Grovetown, GA 30813. Request: Approve the Facility Use Agreement between the Columbia County Board of Commissioners and the UGA Extension / 4-H Trap Shooting Program (Contract #2026-3680). History: The 4-H Shooting Awareness, Fun, and Education (S.A.F.E.) Trap Shooting Program takes place annually, consisting of a 2-hour weekly practice occurring during the months of February through May. There are approximately 70 participants at any given event, broken down into 40-45 student shooters, 6-8 coaches, 1-2 4H representatives, and 10-15 parents. Funding: All financial contributions associated with these activities are the responsibility of the… p. 2
- m.…Road Request – Acceptance of Improvements, to include the road, water, sanitary sewer, storm sewer, and detention pond systems, along with the right-of-ways and easements associated with these improvements, as specified and depicted on a plat prepared by Jachens Land Surveying, Inc., dated July 30, 2026. History – Wrights Farm Section 4B Lots 214-284 subdivision will consist of 70 new single family parcels located on 30.93 acres. The property is zoned (PUD) Planned Unit Development. The minimum lot size is 10,511 square feet. The average lot size for this development is 14,928 square feet. Timeline – Per the deed, the developer shall warranty all materials and workmanship for two (2) years from the date of final acceptance by the Board of Commissioners and staff approval; however, sanitary sewer service laterals shall have a warranty of one year from the date of occupancy of each lot. p. 2
- 1.Unfinished Business
- a.Development and Planning Services Committee p. 2
- 1.RZ26-08-02 , Rezoning from R-2 (Single Family Residential) to S-1 (Special), 250 Legion Drive, Tax Map 079 Parcel 122A, 2.5 +/- acres, and currently zoned R-2 (Single Family Residential). - tabled from August 18, 2026 - See attached Staff Report- RZ26-08-02 Planning Commission Date: August 6th , 2026
- 2.RZ26-08-04 , Rezoning from R-3 (Single Family Residential) to PRD (Planned Residential Development), 325 McCormick Road, Tax Map 077B Parcel 114, 14.1 +/- acres, and currently zoned R-3 (Single Family Residential) -tabled from August 18, 2026 - See attached Staff Report- RZ26-08-04 Planning Commission Date: August 6th, 2026
- 2.New Business
- a.Management and Internal Services Committee p. 2
- 1.Intergovernmental Agreement Regarding Economic Development Services and Project Related Infrastructure with the Development Authority - The purpose of this Agreement is to provide for the County’s continuing provision of lawful governmental services, infrastructure, facilities, and related activities that advance economic development within Columbia County and thereby assist the Authority in carrying out its statutory purposes, as expanded by O.C.G.A. § 36-62-6(a)(16), and to establish the compensation to be paid by the Authority to the County for those services from a portion of the Initial Authority Fees received by the Authority in connection with the Project. This Agreement shall commence on the Effective Date and shall continue until the earlier of (a) the date on which no Project Bonds remain outstanding, no portion of the Project remains subject to a bond lease, and no further… p. 2
- b.Development and Planning Services Committee p. 2
- 1.VA26-08-07, Variance to Section 90-53 List of lot and structure requirements , 266 Fairfax Street, Tax Map 078F Parcel 063, 0.26 +/- acres, and currently zoned R-3 (Single Family Residential). - See attached Staff Report- VA26-08-07 Planning Commission Date: August 20th , 2026 p. 2
- 2.RZ26-08-06 , Conditional Use for Therapeutic Massage, 119 North Belair Road, Tax Map 073C Parcel 092, 0.44 +/- acres, and currently zoned P-1 (Professional). - See attached Staff Report- RZ26-08-06 Planning Commission Date: August 20th , 2026
- 3.RZ26-08-07 , Rezoning from R-2 (Single Family Residential) to P-1 (Professional), 165 South Belair Road, Tax Map 073B Parcel 001, 0.55 +/- acres, and currently zoned R-2 (Single Family Residential). - See attached Staff Report- RZ26-08-07 Planning Commission Date: August 20th , 2026
- 4.VA26-08-08, Variance to Sections 90-98 List of lot & structure requirements and 90-139 Buffers & screenin g , 165 South Belair Road, Tax Map 073B Parcel 001, 0.55 +/- acres, and currently zoned R-2 (Single Family Residential). - See attached Staff Report- VA26-08-08 Planning Commission Date: August 20th , 2026 p. 2
- 5.RZ26-08-08, Major PUD (Planned Unit Development) Revision, 779 Bishops Circle, Tax Map 065 Parcel 554, 0.30 +/- acres, and currently zoned PUD (Planned Unit Development). - See attached Staff Report- RZ26-08-08 Planning Commission Date: August 20th , 2026 p. 2
- 3.Items Added at the Meeting p. 2
- 1.Susan Warren, Howard Johnson and Lee Muns p. 3
- 1.Property
- a.Portion of parcels 062 174A and 062 1743 Canterbury Farms Association to obtain right of way and temporary easements for the Horizon South Parkway and Chamblin Road Connector Project. - Easement for the Horizon South Pkwy / Chamblin Rd Connector Project The Horizon South Pkwy and Chamblin Rd Connector Project consists of a new 1.25 mile, 2-lane road with a center turn lane connecting Chamblin Rd to Horizon South Pkwy. This project will also extend Gateway Blvd by half a mile to connect with a new roundabout along the aforementioned connector road. Key upgrades will include a 500' vehicular bridge over Mill Branch, traffic signal upgrades at Chamblin Rd (Canterbury Farms Pkwy), and a traffic signal on Horizon South Pkwy. Staff has negotiated with the following property owners to obtain right-of-way and temporary easements for this road project. Tax ID Name Acreage Total Parcel ID# 062… p. 3
- b.Purchase and Sale Agreement with Pollard Land Company, Inc. for parcel 029 048. - Purchase and Sale Agreement for the property described below in the amount of $3,915,600.00 for a new county park on the western side of the county per the voter-approved 2023-2028 SPLOST. Property: 1600 Old Appling Harlem Hwy TMS# 029 048 97.89 Acres p. 3
- c.Purchase and Sale Agreement with Keith Allen Pollard for parcel 028 015A. - The purchase and Sale Agreement for the property is described below in the amount of $22,000 per acre. This property is contiguous to our Appling Campus. Property: 1978 Old Appling Harlem Rd TMS# 028 015A 22 Acres more or less