Stark County, OH · pop. 374K
Wed25Nov
Stark County meeting
Wed Nov 25 · today
Meetings
Agendastarkcountyohio.gov
Minutesafter the meeting
Meeting page ↗starkcountyohio.govAdd to calendar.ics for Outlook, Google, Apple2 items on this agenda match the land-use topicsSubdivisions (1), Annexation (1)
Agenda items (10)Show only the 2 matching
- • Engineer: A Resolution to approve and authorize the President of the Board to sign a Purchase Agreement with Young Truck Sales for a 2027 Freightliner M2 112 Truck for $149,305.03 under ODOT contract # 04425 pricing. p. 2
- • Sanitary Engineer: A Resolution to approve and authorize the President of the Board to sign Purchase Agreements with Valley Ford Truck Inc. for three new Ford Trucks that are being purchased under state term contract # 118-27. A 2027 F150 at the cost of $58,300.00; 2027 F250 at the cost of $78,361.00; and a 2027 F750 at the cost of $266,470.00. Requisitions (Kris Miller) p. 3
- • Engineer: Purchase of a 2027 Freightliner M2 112 cab and chassis-Vendor: Young Truck Sales Inc.-$149,305.03 p. 3
- • Sanitary Engineer: Purchase of a 2027 F750-Vendor: Valley Ford Truck Inc.- $266,470.00 State DAS Purchasing Contract #118-27 p. 3
- • Sanitary Engineer: Purchase of a 2027 F150 4WD Supercab with ARE Cap-Vendor: Valley Ford Truck Inc.-$58,300.00 State DAS Purchasing Contract #118-27 p. 3
- • Sanitary Engineer: Purchase of a 2027 F250 4WD Supercab Electrician Truck with Diabolo Body-Vendor: Valley Ford Truck Inc.-$78,361.00 State DAS Purchasing Contract #118-27 Change Orders (Kris Miller) p. 3
- …PE 7-20 & PE-7-21 Rehabilitation Projects, PID 121152 to Black Horse Bridge Construction, Inc. of Norton, Ohio. The Stark County Engineer recommends awarding a contract for the improvement of the Cherry Rd Bridge No. PE-7-20 & PE-7-21 Rehabilitation Projects, PID 121152, to the apparent low bidder, Black Horse Bridge Construction, Inc., and proceed with entering into a contract for the project. This project has a total contract value of $4,491,149.00 Base Bid. The funding for this project will come from Federal LMB funds at a 95% maximum of $3,300,000.00, an OPWC grant up to a maximum of $1,1… p. 4
- …ntains at Edgewood No. 5 Allotment in Plain Twp. has been found satisfactory for acceptance, and all construction inspection fees have been paid. The Subdivision Engineer recommends that the following sections of streets be accepted as public roads and released for maintenance to Plain Township: Gate House St. NE - 50 feet by 1252.27 feet, Christian Court St. NE - 50 feet by 218.07 feet, Eagle Watch St. NE – 50 feet by 243.16 and Southbrook Cir. NE - 50 feet by 257.90. p. 5
- • A Resolution approving a 1-year time extension on the Sidewalk Performance Bond for the Rolling Green West No. 3 Allotment in Jackson Township. The Subdivision Engineer received a request from James Rudo, representing the developer RG3, LLC, of Rolling Green West No. 3 Allotment in Jackson Township, for a one-year time extension on the sidewalk performance bond for the Rolling Green West No. 3 Allotment in Jackson Twp. from January 12, 2027, to January 12, 2028. There are two lots remaining to be sold and developed, and the sidewalks on those lots cannot be installed until homes are construc… p. 5
- • A Resolution Approving and Authorizing annexation of certain county-owned real property. p. 5