Santa Rosa County, FL · pop. 194K
Thu12Nov8:30 AM
Commission Regular Meeting
Thu Nov 12, 8:30 AM · BOCC Boardroom, 6495 Caroline St, Milton · 10 days ago
Agendasantarosacofl.api.civicclerk.comRecording ▸santarosacofl.portal.civicclerk.comAgendaAgendaAttachmentLocation MapAttachmentSentinel Ridge Phase 1AttachmentSandy CreekAttachmentSandy Creek Two Year Warranty AgreementAttachmentBlackwater Reserve Phase Two MapAttachmentTwo-Year WarrantyAttachmentShared Driveway ConceptAttachmentGrace LandingAttachmentGrace Landing Capacity Request
Minutesnot posted yet
Meeting page ↗santarosacofl.portal.civicclerk.com7 items on this agenda match the land-use topicsSubdivisions (6), Variances (1), Water & sewer (1), Infrastructure (1), Incentives (1)
Agenda items (55)Show only the 7 matching
- 1)Prayer - Youth Leader Michael Tarver of Replicate Church p. 1
- 2)Pledge
- 3)Agenda Approval
- 1)Jay Lady Royals Volleyball Team p. 1
- 1)Vacation of Right-of-Way Application by Avalon 32, LLC. - Public hearing in consideration of a ROW vacation application.
- 2)Vacation of Right of Way Application by Bearing Point Properties - Public hearing in consideration of a ROW vacation application. p. 1
- 3)Dog Tethering Ordinance - Public hearing in consideration of a proposed ordinance related to the tethering of dogs.
- 4)Ordinance Amending Chapter 14 of Santa Rosa County Code of Ordinances - Public hearing in consideration of a proposed ordinance amending Chapter 14, Article III of the Santa Rosa County Code of Ordinances, as it relates to Navarre Beach parking in violation of official traffic control devices on County-owned property. p. 1
- 1)Public Input - Online Form
- 1)Check Register - Approval of the check register from October 13, 2026 through November 2, 2026.
- 2)Minutes - Approval of the minutes from the August 27, 2026 BOCC Regular Meeting and the September 24, 2026 BOCC Special Meeting.
- 3)OMB- Budget Amendment 2027-011; Berrydale Volunteer Fire Facility - Approval of Budget Amendment 2027-011 in the amount of $27,300 from General Fund reserves for change order #3 to Emerald Coast Contractors for the Berrydale Volunteer Fire Department Administration Building project approved at the October 22, 2026 regular meeting. These funds are part of the MSBU loan approved by the board at the August 14, 2025, meeting. p. 2
- 4)OMB - Budget Amendment 2027-012: CCF SHIP Funds and SHIP Allocations - Approval of Budget Amendment 2027-012 in the amount of $1,523,175 to carry forward SHIP funds that were allocated but unspent in FY2026 and recognize additional FHFC Funding in the amount of $1,525,324. p. 2
- 5)OMB - Budget Amendment 2027-014; FY27 Roll Over for Grant Fund - Approval of Budget Amendment 2027-014 in the amount of $38,947,425 to roll forward previously recognized and obligated in the grant fund. p. 2
- 6)OMB - Budget Amendment 2027-015; CCF American Rescue Plan Act - Approval of Budget Amendment 2027-015 in the amount of $1,087,720 to carry forward the remainder of American Rescue Plan Act funds from FY26 for R&M Stabilization, Oriole Beach Drainage, Ashley Plantation Retroft, Saddle Club Drainage, East Navarre Drainage, Floridatown Drainage, Repair/Maint - Outfall, Pine Blossom Drainage, N Diamond/Wallace Drainage, and Soundside Septic to Sewer. p. 2
- 7)OMB - Budget Amendment 2027-016; CCF for General Fund - Approval of Budget Amendment 2027-016 in the amount of $821,250 to carry forward general fund monies for FY2026 purchase order balances that were approved by the Board and obligated in FY26, but were not completed during Fiscal Year 2026.
- 8)OMB - Budget Amendment 2027-017 CCF American Rescue Plan Interest - Approval of Budget Amendment 2027-017 in the amount of $108,820 to utilize interest revenue from ARPA funds for projects and operations in the general fund. p. 2
- 9)Engineering - Information Only - Approved Final Plats - Information Only - The following final plats have been approved since June 2026. Stonechase Phase IV-B, 262 Lots, Private Subdivision, District 1, Approved August 7, 2026 Cochran Commons, 44 Lots, Private Subdivision, District 2, Approved September 28, 2026 Sandy Creek, 131 Lots, Public Subdivision, District 1, Approved September 28, 2026 Pine Leaf Crossing Phase 1, 64 Lots, Public Subdivision, District 1, Approved October 21, 2026 Blackwater Reserve Phase Two, 103 Lots, Public Subdivision, District 2, Approved October 28, 2026
- 10)Extension of Local State of Emergency - Approval of the ratification of the Chair's extensions of the Local State of Emergency declared in response to Hurricane Isaias on October 22, October 29, and November 5, 2026, and approval of an additional extension on November 12, 2026.
- 11)OMB - Contract Amendment and Ratification – DRC Emergency Services, LLC (RFP 26-035) - Approval of amendment to revise Line Item 12 to $0.00/CY; authorize the chairman to sign the amendment and all related documents. p. 2
- 12)OMB - Budget Amendment 2027-013 FEMA Hurricane Isaias Expedited Project Debris Removal - Approval of Budget Amendment 2027-013 in the amount of $86,359,920 to recognize funds from FEMA, State and disaster reserves for debris removal related to Hurricane Isaias. p. 3
- 13)Peter Prince - Ratification of Emergency Purchase - Approval of the ratification of the emergency purchase with BluSky Restoration Contractors in the amount of $305,884.82 for emergency safety work and Hurricane Isaias debris removal at Peter Prince Airport and authorization for the chairman to sign all related documents.
- 14)Environmental - Ratification of Emergency Repairs – Central Landfill Phase V, Cell D - Approval to ratify the emergency procurement of repairs to the Central Landfill Phase V, Cell D, resulting from Hurricane Isaias, in an amount not to exceed $634,516.75.
- 15)Administration - Maven Advocacy Partners Contract Renewal Discussion - Approval of a contract amendment with Maven Advocacy Partners to renew the existing agreement for federal lobbyist services with a proposed increase in the monthly contractual fee from a rate of $7,000 a month to $8,500. p. 3
- 16)Administration – Request to Designate the Lloyd V. Hinote Memorial Bridge - Approval to name the bridge crossing Pond Creek on Willard Norris Road the Lloyd V. Hinote Memorial Bridge. p. 3
- 17)Administration - 2027 BOCC Holiday Schedule - Approval of the 2027 BOCC Holiday Schedule.
- 18)Attorney - Joinder for Lease of Hospital Property - Approval of a joinder for lease of hospital property.
- 19)Human Resources - Change to Employee Policies and Procedures - Approval of changes to policies and procedures for BOCC employees related to: pre-disciplinary procedures; disaster pay. p. 3
- 20)EDO - Marketing Services for Economic Development - Approval to contract with the John Appleyard Agency for an annual amount not to exceed $125,000 as the top-ranked firm for RFP 26-062 Professional Advertising, Marketing, and Public Relations Services, and authorization for the chairman to sign all related documents.
- 21)Engineering - Acceptance for Maintenance - Sentinel Ridge Phase I - Approval to accept and maintain infrastructure associated with Sentinel Ridge, Phase 1, a 108-lot public subdivision located in District 1, and authorization for the chairman to sign all related documents. p. 3
- 22)Engineering - Acceptance for Maintenance - Sandy Creek - Approval to accept and maintain infrastructure associated with Sandy Creek, a 131-lot public subdivision located in District 1, and authorization for the chairman to sign all related documents.
- 23)Engineering - Acceptance for Maintenance - Blackwater Reserve Phase II - Approval to accept and maintain infrastructure associated with Blackwater Reserve Phase Two, a 103-lot public subdivision located in District 2, and authorization for the chairman to sign all related documents. p. 3
- 24)Engineering - Blackwater Reserve Drainage Easement - Approval to accept a 30-foot drainage and access easement in the un-platted portion of Blackwater Reserve Subdivision, and authorize the chairman to sign all related documents.
- 25)Engineering - Mariner Isle Subdivision Layout Variance - Approval of a variation to the subdivision layout requirement (LDC 4.03.03.B.2) to allow access to a residential collector when traffic volumes are projected to be greater than 1,500 vehicles per day. Strict adherence to the code in this circumstance is anticipated to introduce hazardous conditions through increased vehicle conflicts and backing movements.
- 26)Engineering - Oriole Beach Boat Ramp Improvements - Approval of Change Order #1 for 26-018 with Panhandle Grading and Paving to add $16,193.20 and 12 days to the contract for the Oriole Beach Boat Ramp Improvements. The change order is for the design revisions required to correct elevation changes at the parking lot, seawall, existing piers, and field modifications necessary to ensure ADA compliance, and authorization for the chairman to sign all related documents.
- 27)Engineering - Pine Blossom Drainage Project - Approval of Change Order #7 to 25-012 with Bear General Contractor to add 16 days to the contract for the Pine Blossom Drainage Project for weather delays related to Hurricane Isaias and subsequent debris cleanup in the project area; authorization for the chairman to sign all related documents.
- 28)Engineering - South Santa Rosa Sports Complex Post Design/Construction Administration Services - Approval of a supplemental task order with Moffatt & Nichol in the amount of $39,343.10 for the South Santa Rosa Sports Complex for Post Design/Construction Administration Services and authorization for the chairman to sign all related documents. p. 4
- 29)Engineering - West Spencer Field and Giddens Roundabout Deductive Change Order - Approval of a deductive change order from Roads, Inc. in the amount of $26,800.00 for the West Spencer Field and Giddens Roundabout, and authorize the chairman to sign all related documents. p. 4
- 30)Environmental - Eglin Regional Reuse (RIBs) Deductive CO and Owner Direct Purchase for Pipe - Approval of Change Order #1 for 26-039 with Gulf Coast Utility Contractors to reduce the contract amount by $1,352,037.86 for the Eglin Regional Reuse System Phase 2 for the Owner Direct Purchase with Empire Pipe, and authorization for the chairman to sign all related documents. p. 4
- 31)Environmental - Eglin Regional Reuse (RIBs) Deductive CO and Owner Direct Purchase for Pumps - Approval of Change Order #2 for 26-039 with Gulf Coast Utility Contractors to reduce the contract amount by $1,033,620 for the Eglin Regional Reuse System Phase 2 for the Owner Direct Purchase with Templeton & Associates, and authorization for the chairman to sign all related documents. p. 4
- 32)Environmental - Milton Interchange Park WWTP Sewer Capacity Reservation for Grace Landing - Approval of sewer capacity reservation for the Grace Landing Subdivision. p. 4
- 33)Environmental - Inventory Item Removal - Approval of the removal of Inventory Item No. 2400EQ1233 (John Deere 96" Dozer Blade) from County inventory following a previously authorized trade-in.
- 34)Environmental - Pugh Gulley Sediment Reduction GSP-149 Time Extension - Approval to execute a no cost time extension for the grant-funded Pugh Gulley Sediment Reduction Project, and authorization for the chairman to sign all related documents. p. 4
- 35)Housing - Substantial Rehabilitation of 2133 Mar Mar Lane - Approval to contract with Shaffer Construction in the amount of $58,300 as the apparent low bidder for ITQ 26-057 Housing Rehabilitation- 2133 Mar Mar Lane, authorization for the project to exceed the program maximum of $50,0000, and authorization for the chairman to sign all related documents.
- 36)Housing - LHAP Strategy Amendment for Disaster Relief - Approval of an amendment to the County’s Local Housing Assistance Plan (LHAP) to allow eligible households impacted by a natural disaster declared by an Executive Order issued by the President or Governor to be prioritized for assistance under the County’s existing housing repair strategies based on the severity of disaster-related damage and the household’s immediate health, safety, and habitability needs.
- 37)Peter Prince Field - Construction Award for AWOS - Approval of contract award to TCA Electrical Contractors, Inc. as the apparent low bidder in the amount of $400,050 for the Automated Weather Observing System construction ITB 26-055, and authorization for the chairman to sign all related documents.
- 38)Peter Prince Field - Construction Award for West Apron Rehabilitation - Approval to contract with Panhandle Grading & Paving Inc. in the amount of $1,042,589.42 as the apparent low bidder for ITB 26-030 Peter Prince Field West Apron Rehabilitation, and authorization for the chairman to sign all related documents. p. 5
- 39)Peter Prince Field - Consultant Services for West Apron Rehabilitation - Approval of Task Order 9 to AVCON, Inc. in the amount $99,200 for the bid phase, construction phase, and sub-consultant services for the West Apron Rehabilitation - Construction Project, and authorization for the chairman to sign all related documents. p. 5
- 40)Public Safety - FL DEM Vehicle Barrier Trailer MOA - Approval to enter into a Memorandum of Agreement (MOA) with State of Florida Division of Emergency Management (FDEM) for use of state purchased barrier trailers.
- 41)Public Works - Fuel Services Agreement Renewal - Approval of the final one-year renewal option to the original agreement with Cougar Oil, Inc.; authorize the chairman to sign all related documents.
- 42)Public Works - Stormwater Maintenance Agreement Change Orders - Approval of Change Orders to the original agreements with Hinote Property Works and Green Energy Contracting for Stormwater Pond MSBU maintenance, adding additional ponds for maintenance during FY 2026–2027; and authorization for the chairman to execute all related documents. p. 5
- 43)Engineering — Pace Water System Utility Easement - Approval of a 20-foot wide utility easement for Pace Water System for the installation of a gravity sewer main located within pond parcel E-5 in the Ashley Plantation Subdivision. Authorize the chair to sign all related documents.
- 1)EDO - Hwy 90 Corridor Commercial Development Package - Approval or denial of the Economic Development Retail Incentive Agreement for Project Clerks in an amount not to exceed $1,121,902.15 based on incremental ad valorem revenues over a 10-year term , and approval of the associated tree mitigation plan and authorization for the chairman to sign all related documents.
- 2)Add-on: FDEM Public Assistance Subgrant Agreement - Approval or denial of an agreement with the Florida Department of Emergency Management for public assistance related to Hurricane Isaias.
- 1)Upcoming Meetings - November 12 @ 5:00 PM Zoning Board Meeting November 17 @ 2:00 PM Oath of Office/ Board Reorganization Meeting November 18 @ 2:30 PM Building Code Board of Adjustments (BOAA) Economic Development Conference Room, 6491 Caroline St, Milton, FL 32570 November 19 @ 1:30 PM Local Mitigation Strategy Committee Meeting SRC Emergency Management, 4499 Pine Forest Rd, Milton, FL 32583