Santa Rosa County, FL · pop. 194K
Tue10Nov8:30 AM
Commission Committee Meeting
Tue Nov 10, 8:30 AM · BOCC Boardroom, 6495 Caroline St, Milton · 12 days ago
Agendasantarosacofl.api.civicclerk.comRecording ▸santarosacofl.portal.civicclerk.comAgendaAgendaAttachmentSentinel Ridge Phase 1AttachmentGrace LandingAttachmentGrace Landing Capacity RequestAttachmentSandy CreekAttachmentSandy Creek Two Year Warranty AgreementAttachmentBlackwater Reserve Phase Two MapAttachmentTwo-Year WarrantyAttachmentShared Driveway ConceptAttachmentLocation Map
Minutesnot posted yet
Meeting page ↗santarosacofl.portal.civicclerk.com8 items on this agenda match the land-use topicsSubdivisions (6), Incentives (1), Variances (1), Water & sewer (1), Infrastructure (1), Rezoning (1)
Agenda items (56)Show all 56
- 9)Engineering - Information Only - Approved Final Plats - Information Only - The following final plats have been approved since June 2026. Stonechase Phase IV-B, 262 Lots, Private Subdivision, District 1, Approved August 7, 2026 Cochran Commons, 44 Lots, Private Subdivision, District 2, Approved September 28, 2026 Sandy Creek, 131 Lots, Public Subdivision, District 1, Approved September 28, 2026 Pine Leaf Crossing Phase 1, 64 Lots, Public Subdivision, District 1, Approved October 21, 2026 Blackwater Reserve Phase Two, 103 Lots, Public Subdivision, District 2, Approved October 28, 2026
- 1)EDO - Hwy 90 Corridor Commercial Development Package - Approval or denial of the Economic Development Retail Incentive Agreement for Project Clerks in an amount not to exceed $1,121,902.15 based on incremental ad valorem revenues over a 10-year term , and approval of the associated tree mitigation plan and authorization for the chairman to sign all related documents.
- 1)Engineering - Acceptance for Maintenance - Sentinel Ridge Phase I - Approval or denial to accept and maintain infrastructure associated with Sentinel Ridge, Phase 1, a 108-lot public subdivision located in District 1, and authorization for the chairman to sign all related documents. p. 4
- 2)Engineering - Acceptance for Maintenance - Sandy Creek - Approval or denial to accept and maintain infrastructure associated with Sandy Creek, a 131-lot public subdivision located in District 1, and authorization for the chairman to sign all related documents.
- 3)Engineering - Acceptance for Maintenance - Blackwater Reserve Phase II - Approval or denial to accept and maintain infrastructure associated with Blackwater Reserve Phase Two, a 103-lot public subdivision located in District 2, and authorization for the chairman to sign all related documents. p. 4
- 5)Engineering - Mariner Isle Subdivision Layout Variance - Approval or denial of a variation to the subdivision layout requirement (LDC 4.03.03.B.2) to allow access to a residential collector when traffic volumes are projected to be greater than 1,500 vehicles per day. Strict adherence to the code in this circumstance is anticipated to introduce hazardous conditions through increased vehicle conflicts and backing movements.
- 12)Environmental - Milton Interchange Park WWTP Sewer Capacity Reservation for Grace Landing - Approval or denial of sewer capacity reservation for the Grace Landing Subdivision. p. 5
- 1)Upcoming Meetings - November 10 @ 5:00 PM Commission Special Rezoning November 12 @ 8:30 AM Commission Regular Meeting November 12 @ 5:00 PM Zoning Board Meeting November 17 @ 2:00 PM Oath of Office/ Board Reorganization Meeting November 18 @ 2:30 PM Building Code Board of Adjustments (BOAA) Economic Development Conference Room, 6491 Caroline St, Milton, FL 32570 November 19 @ 1:30 PM Local Mitigation Strategy Committee Meeting SRC Emergency Management, 4499 Pine Forest Rd, Milton, FL 32583