- …DGE OF ALLEGIANCE / SILENT REFLECTION NIAGARA MILITARY AFFAIRS COUNCIL PRESENTATION PUBLIC HEARING LOCAL LAW 5-2026 “A Local Law Imposing a Temporary Moratorium on the Acceptance, Processing, Approval, Construction, Installation, and Operation of Battery Energy Storage Systems, Including Battery Energy Storage Systems Associated with Commercial Solar Energy Systems and Stand-Alone Battery Energy Storage Facilities.” AGENDA APPROVAL RESIDENT STATEMENTS APPROVAL OF MINUTES 9/14/2026 WS ABSTRACT OF CLAIMS Councilman Morreale DEPARTMENT HEAD STATEMENTS Clerk’s Office – Employee Retirement OLD/PEND… p. 1
- TOWN OF LEWISTON NIAGARA COUNTY, NEW YORK LocALLAW No. 5 oF 2026 A LOCAL LAW IMPOSING A TEMPORARY MORATORIUM ON THE ACCEPTANCE, PROCESSING, APPROVAL, CONSTRUCTION, INSTALLATION, AND OPERATION OF BATTERY ENERGY STORAGE SYSTEMS, INCLUDING BATTERY ENERGY STORAGE SYSTEMS ASSOCIATED WITH COMMERCIAL SOLAR ENERGY SYSTEMS AND STAND-ALONE BATTERY ENERGY STORAGE FACILITIES, SECTION 1. Legislative Findings and Intent The Town Board of the Town of Lewiston hereby finds that battery energy storage systems (“BESS”) are rapidly evolving technologies that can present substantial land-use, fire-safety, emergen… p. 1
- B. Preserve the existing land-use status quo during the moratorium; p. 2
- SECTION 10. Regulatory Review During the moratorium, the Town Board shall direct appropriate Town personnel, consultants, and land-use boards to review existing zoning and land-use regulations, NYSERDA's Battery Energy Storage System Model Law and Guidebook; applicable provisions of the New York State Uniform Code and Fire Code; BESS classifications and capacity thresholds; setbacks; fire protection and emergency response; emergency access; noise, lighting, fencing, landscaping and visual screening; stormwater and environmental considerations; decommissioning and financial security; insurance… p. 5
- …DGE OF ALLEGIANCE / SILENT REFLECTION NIAGARA MILITARY AFFAIRS COUNCIL PRESENTATION PUBLIC HEARING LOCAL LAW 5-2026 “A Local Law Imposing a Temporary Moratorium on the Acceptance, Processing, Approval, Construction, Installation, and Operation of Battery Energy Storage Systems, Including Battery Energy Storage Systems Associated with Commercial Solar Energy Systems and Stand-Alone Battery Energy Storage Facilities.” AGENDA APPROVAL RESIDENT STATEMENTS APPROVAL OF MINUTES 9/14/2026 WS ABSTRACT OF CLAIMS Councilman Morreale DEPARTMENT HEAD STATEMENTS Clerk’s Office - Employee Retirement OLD/PEND… p. 1
- …cing at 6:00 p.m. at the Town Hall, 1375 Ridge Road, Lewiston, New York, on the adoption of “Local Law #5 of 2026 - “A LOCAL LAW IMPOSING A TEMPORARY MORATORIUM ON THE ACCEPTANCE, PROCESSING, APPROVAL, CONSTRUCTION, INSTALLATION, AND OPERATION OF BATTERY ENERGY STORAGE SYSTEMS, INCLUDING BATTERY ENERGY STORAGE SYSTEMS ASSOCIATED WITH COMMERCIAL SOLAR ENERGY SYSTEMS AND STAND-ALONE BATTERY ENERGY STORAGE FACILITIES”. Said law is intended to provide time for Town Board of the Town of Lewiston to research and adopt new laws to more efficiently regulate applications for such uses within the Town o… p. 3
- A. Temporarily suspend new applications and/or approvals for covered battery energy storage systems; p. 2
- J. Consider appropriate regulations for both solar-associated and stand-alone battery storage facilities. SECTION 3. Definitions p. 2
- A. “Battery Energy Storage System” or “BESS” means one or more devices, assembled together, capable of storing electrical energy in order to supply electrical energy at a future time, including batteries, battery management systems, power conversion systems, transformers, switchgear, controls, enclosures, containers, cooling systems, fire protection systems, and associated equipment. p. 2
- B. “Solar-Associated Battery Energy Storage System” means a BESS located on the same property as, or directly associated with, a commercial or utility-scale solar energy system, whether charged exclusively by the solar facility or capable of receiving electricity from the electric grid. p. 2
- C. “Stand-Alone Battery Energy Storage Facility” means a facility principally devoted to the storage and discharge of electrical energy and not physically incorporated into an individual residential or ordinary small-scale commercial electrical system. p. 2
- D. “Commercial Solar Energy System” means a solar energy system intended primarily to generate electricity for commercial sale, wholesale distribution, or grid supply, including utility- p. 2
- A. Stand-alone battery energy storage facilities; p. 3
- B. Battery energy storage systems proposed in connection with commercial or utility-scale solar energy systems; p. 3