Public Works Board
Thu Aug 13, 4:00 PM · 1903 Marquette Avenue, Muskegon · 3 months ago
Agendamuskegoncomi.api.civicclerk.comMinutesmuskegoncomi.api.civicclerk.comRecording ▸muskegoncomi.portal.civicclerk.comMeeting page ↗muskegoncomi.portal.civicclerk.com
Agenda items (12)
- A.Move to approve the Minutes of July 9, 2026 (Pg. 3) - (General description of financing, other operational impact and other alternatives.)
- Move to award RFQu 26-2626 for Professional Engineering Services relating to drinking water to Prein & Newhof, DLZ Michigan, and Fleis & VandenBrink Engineering, and authorize the Chair to sign the Agreements. - The Purchasing Department solicited qualifications for Professional Engineering Services in RFQu 26-2626. The RFQu included separate scopes for firms to submit qualifications for drinking water-related and wastewater-related professional services. Twelve firms submitted qualifications for drinking water-related professional services; of those, eleven firms were deemed responsive. Three staff members from the Department of Public Works independently reviewed and scored the responses of firms submitting for drinking water. Based on accumulative scoring, the top three rated firms were Prein & Newhof, DLZ Michigan, and Fleis & VandenBrink Engineering (see attachment). Reference… p. 1
- Move to authorize the Board Chair to sign the Consent to Easement, Certificate of Authority, and Letter Agreement between the United States and Muskegon County and authorize to pay the administrative charge of $15,495.00 in order to finalize the United States Army Corps of Engineers' approval of the County's water main crossing of the Muskegon Lake Channel. - The City of Muskegon owns the land in the Muskegon Channel. The USA government (USA) has an easement for navigation in the channel. The USA also owns land adjoining the channel. The County needed a water main under the channel and in the federally owned land. In 2022, the County applied to the US Army Corps of Engineers (USACE) for a consent to allow the County to have an easement from the City to run the water main in the USA easement. The County also applied to the Corps for an easement on the USA land adjoining the channel. It… p. 1
- Move to approve the sole source purchase of a 10-HP Strobic Air® fan for the RRC laboratory’s exhaust system for $27,585.00 plus shipping. - The Resource Recovery Center laboratory has an elaborate exhaust system that supports nine fume hoods, the exhaust from one drying oven, and the exhaust from one instrument. The system maintains air quality in the laboratory to ensure that employees are protected from toxic and noxious fumes. Two 10-HP Strobic Air® exhaust fans, alternating months in their operation, are employed to meet the needs of the system. One of the two fans recently failed and must be replaced. Because Strobic Air® was specified in the engineering design, a Strobic Air® fan must be used for the replacement in order to maintain the integrity of the exhaust system. Quality Air Service, the authorized Strobic Air® dealer in Michigan, will replace the failed fan for $27,585.00… p. 1
- Move to accept the low bid of $42,452.00 from Seal Analytical for IFB 26-2639, Segmented Flow Analyzer , for the purchase and installation of a segmented flow analyzer for the Resource Recovery Center laboratory. - Bids were opened at the County Procurement Office on June 23, 2026, for RFB 26-2639, Segmented Flow Analyzer , for the purchase and installation of a new segmented flow analyzer for the RRC’s laboratory. The low bid was submitted by Seal Analytical for $42,452.00. (See attached Board summary.) The Department recommends accepting their bid. A segmented flow analyzer is a laboratory instrument that measures the concentration of various analytes in water samples. The instrument has a peristatic pump that draws a water sample into a series of tubing. As it flows through the tubing, small bubbles of air are introduced into the tubing. Those bubbles break up the flow of the sample… p. 1
- Move to adopt the 2026 Resource Recovery Center Hunting and Trapping Rules and authorize the DNR waterfowl hunt, spring youth turkey hunt, and 2026 Liberty Hunt for youth. - The Resource Recovery Center Hunting Committee met on July 7, 2026, to discuss the RRC’s hunting programs. This year, hunters wishing to participate in the archery drawing will be offered the convenience of registering online. The Committee recommended keeping the permit price at $100. (See the attached proposed 2026 Hunting and Trapping Rules.) They recommended that the spring youth turkey hunt be repeated next season with a maximum of 15 youths and that the 2026 Liberty Hunt for youth be continued. No limit is being placed on the number of Liberty Hunt participants, but the hunt will be archery only. They also recommended that we continue our cooperation with the Muskegon State Game Area in allowing them to use… p. 1
- Move to approve Amendment #1 to the RRC's Demand Response Program Agreement with Voltus for urgent electrical power curtailment. - On September 7, 2023, the Board approved the attached Agreement with Voltus, Inc., which allows the Resource Recovery Center to participate in the Voltus Demand Response Program (DRP) during the spring, fall, and winter months. Voltus administers this DRP on behalf of MISO, (Midcontinent Independent Service Operator), which is the agency that controls the electric power grid in Michigan and much of the other Midwest region. Participants in a DRP curtail their usage of electrical power whenever MISO requests it, which MISO might do, for instance, during a heatwave, when the demand for electricity is very high across the grid. Participants in the program are rewarded by receiving financial incentives from the party that administers the DRP. Currently we… p. 1
- Move to accept the proposal from HESCO in response to RFP 26-2634, Flow Meter Calibration & Repair Services , to provide flow meter calibration services at $50,700.00 per year with a 5% contingency and flow meter repair services at $200.00/hour for one year, with the option of up to two one-year extensions if mutually agreeable to both parties and approved by a vote of the Board. - On July 23, 2026, the Procurement Office opened bids for RFP 26-2634, Flow Meter Calibration & Repair Services . The Board Summary is attached. The bids were reviewed by Department staff, which recommends accepting the proposal submitted by HESCO. HESCO will provide flow meter calibration services for $50,700 per year and flow meter repair services on a time and materials basis for $200.00/hour. The Agreement will be for one year, with the option of up to two one-year extensions if agreed to by the vendor and … p. 2
- A.Public Works Monthly Report—June 2026 (Pg. 116) - (General description of financing, other operational impact and other alternatives.)
- B.Resource Recovery Center Monthly Report—June 2026 (Pg. 134) - (General description of financing, other operational impact and other alternatives.) p. 2
- A.Move to reschedule the Thursday, September 10th, 2026, Board of Public Works meeting to Tuesday, September 15th, 2026, at 4 P.M. - (General description of financing, other operational impact and other alternatives.) p. 2
- B.Resolution to recognize Kathy Evans for contributions to the cleanup of Muskegon Lake. - (General description of financing, other operational impact and other alternatives.)