Muskegon County, MI · pop. 177K
Thu11Jun4:00 PM
Public Works Board
Thu Jun 11, 4:00 PM · 1903 Marquette Avenue, Muskegon · 5 months ago
Agendamuskegoncomi.api.civicclerk.comMinutesmuskegoncomi.api.civicclerk.comMeeting page ↗muskegoncomi.portal.civicclerk.com
1 item on this agenda matches the land-use topicsComp plan (1)
Agenda items (8)Show only the 1 matching
- A.Move to approve the Minutes of May 14, 2026 (Pg.3) - (General description of financing, other operational impact and other alternatives.)
- Move to approve the Caterpillar D6 undercarriage repair per quotation number 62708 in the amount of $49,556.09 under the current Agreement with MacAllister Machinery Company, and to amend the Solid Waste budget accordingly. - The landfill operates a Caterpillar D6 waste handler bulldozer to support the landfill compactors by moving soils, trash, and the alternate daily cover tarping system. The undercarriage of the D6 is the primary wear component of the machine. The undercarriage is in contact with all the landfill materials and operates in a harsh environment. For reference, an undercarriage is all the components that make up the track system (track shoe, bolts, bushings, pins, carrier roller, sprockets, track rollers, chain, idlers, etc.). The undercarriage is at the end of its useful life and needs to be replaced. The track shoes will be reused. Staff investigated the Original… p. 1
- …Occupied properties were the priority, but vacant adjacent properties were also acquired to increase flexibility of future land use. The property located at 8595 E. Apple Avenue is a privately owned parcel located essentially in the middle of the properties that have been acquired. The parcel owner, Ms. Joan Santes, has indicated that she is interested in selling. Obtaining the property is desirable as it will result in one contiguous parcel of land, expanding possibilities for future use, inclusive of a potential sand borrow pit for soil to be used at the Solid Waste facility. A "Buy and Sell Agreement" has been prepared by Corporate Council. Ms. Santes has agreed to the terms and has signed the agreement. Staff request Board approval to pursue the property and authorization for the Board Chair to sign the agreement and closing documents. A copy of the Buy and Sell A p. 1
- Move to award RFP 26-2629 for design, bidding, and construction assistance services to rehabilitate the Michigan Adventure Tank and Quarterline Tank for the Muskegon County Regional Water System to Dixon Engineering, Inc. for an amount not to exceed $65,230, and authorize the Board Chair to sign the agreement. - The Muskegon County Regional Water System owns three water storage tanks used to provide storage capacity and pressure in the system. The Michigan's Adventure Tank and Quarterline Tank are in need of rehabilitation, including protective coating repairs, structural improvements, and safety enhancements. Maintaining these assets is important to ensuring continued reliability, regulatory compliance, and protection of public infrastructure investment. The County issued a Request for Proposals (RFP) to retain a qualified engineering firm to provide comprehensive services from design… p. 1
- Move to authorize Municipal Analytics to perform a Cost of Service Study for the Resource Recovery Center at a cost of $55,000.00. - The Resource Recovery Center solicited proposals from utility rate consulting firms for conducting a Cost of Service Study (COSS). A COSS will help us to determine treatment costs for various pollutants. Of particular interest to the Department are the costs of treating the pollutants Biochemical Oxygen Demand (BOD) and Total Suspended Solids (TSS) and the determination of justifiable surcharge rates for industrial users who contribute those pollutants at concentrations greater than is typically found in domestic sewage. Two utility rate consulting firms submitted proposals. They were Municipal Analytics and Raftelis Financial Consultants. The proposals were evaluated independently by three Department staff members on the basis of technical merit and… p. 1
- A.Public Works Monthly Report-April 2026 (Pg. 25) - (General description of financing, other operational impact and other alternatives.)
- B.Resource Recovery Center Monthly Report-April 2026 (Pg.45) - (General description of financing, other operational impact and other alternatives.)
- C.Draft Muskegon Municipal Wastewater Management Committee Minutes from April 2026 (Pg.66) - (General description of financing, other operational impact and other alternatives.) p. 1