Leer en españolThis is a special meeting of the Spencer Planning Board on Tuesday, December 1, 2026, at 6:00 PM, held in person at McCourt Social Hall and also by phone or computer. The main item is a continued public hearing on a request from New England Power Company and Massachusetts Electric Company to build new equipment at their existing electric substation on Meadow Road. Citizen Input is also on the agenda.
- A continued public hearing on a request to build new substation equipment and facilities at the existing electric substation on Meadow Road. The request needs a site plan review, a special permit for work in a floodplain, and a stormwater permit. Touches: Residents and property owners near 7.5 and 9 Meadow Road; the applicant is New England Power Company and Massachusetts E.The public may speak p. 1
- Citizen Input, a time when members of the public may speak on the agenda. Touches: Any resident. p. 1
Words on this agenda, explained
- Continued Public Hearing
- A public hearing that was already opened earlier and is being carried on to this meeting, where the public may speak on the item.
- Site Plan Review
- A review of how a property will be laid out and built, such as where buildings, equipment and drives go.
- Special Permit
- A permission the town can give for a use or building that needs extra approval under its rules.
- Stormwater Permit
- A permission needed for work that changes how rain runoff drains from a property, under the town's stormwater bylaw.
- Floodplain
- Low land next to a river or stream that can flood during heavy rain or snowmelt.
- Citizen Input
- A time near the end of the meeting when members of the public can speak about matters not otherwise listed as a hearing.
Written by AI from the agenda, Nov 19. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
1 item on this agenda matches the land-use topicsSite plans (1)
Agenda items (1)Show all 1
- 2. Continued Public Hearing Site Plan Review/ Special Permit/ Stormwater Permit– Applicant: New England Power Company and Massachusetts Electric Company; Owner: New England Power Company: 7.5 & 9 Meadow Road, Spencer, MA, Assessor’s Map U11-9 & 10. The applicant is seeking a Site Plan Review/ Special Permit/ Stormwater Permit under section 7.4 (Site Plan Review), 3.4.2.H (Special Permit for structures within floodplain), and the Spencer Stormwater Management Bylaw (Article 14 of the Spencer General Bylaws). Proposed construction and installation of certain substation-related equipment and faci… p. 1