Village Board of Trustees Meeting Agenda
Agenda items (5)
- A. Resolved to authorize Change Order #PCI-4 to the Mineola Community Center General Contract to furnish and install additional door tags #17, 18, 19, 20, 21 and 22. Contractor: Preferred Construction Inc. Contract Amount: $ 25,193.68 Funding Source: Bid Item No. 4 – Allowances, no change in the Contract amount. p. 1
- B. Resolved to authorize Change Order #PCI-10 to the Mineola Community Center General Contract to install lumber support for new floor patches, furnish and install wood floor patches where 15 electrical outlets will need to be removed. Contractor: Preferred Construction Inc. Contract Amount: $ 6,708.19 Funding Source: Bid Item No. 4 – Allowances, no change in the Contract amount. p. 1
- C. Resolved to authorize Change Order #PCI-12 to the Mineola Community Center General Contract to remove and dispose of existing millwork cabinets in Rooms 105 and 106. Contractor: Preferred Construction Inc. Contract Amount: $ 3,238.95 Funding Source: Bid Item No. 4 – Allowances, no change in the Contract amount. p. 1
- D. Resolved to authorize Change Order #HPH-5 to the Mineola Community Center Plumbing Contract for a credit to remove the base plumbing work associated with the addition of the floor drain in the basement. p. 1
- E. Resolved to authorize Change Order #HPH-6 to the Mineola Community Center Plumbing Contract to furnish and install approved connection on the existing underground 3” storm piping to the existing underground 8” storm piping under the canopy at the gym entrance. Contractor: Hartcorn Plumbing and Heating Contract Amount: $2,067.45 Funding Source: Bid Item No. 3 – Allowances, no change in the Contract amount. p. 2