City of Port Orange, FL · pop. 63K
Tue21Jul6:30 PM
City Council
Tue Jul 21, 6:30 PM · City Council Chambers, 1000 City Center Circle, Port Orange · 4 months ago
City Council Regular Meeting
Agendaportorangefl.api.civicclerk.comMinutesportorangefl.api.civicclerk.comRecording ▸YouTubeMeeting page ↗portorangefl.portal.civicclerk.com
1 item on this agenda matches the land-use topicsSubdivisions (1)
Agenda items (33)Show all 33
- a.…for the Hamlet Subdivision Sanitary Sewer Manhole Rehabilitation - The City completed an Inflow and Infiltration (I&I) Study in 2015 to identify areas within the sanitary sewer collection system where groundwater and stormwater were entering the system. The study evaluated sewer laterals, gravity mains, and manholes to determine the locations contributing the greatest amount of I&I. I&I occurs when stormwater and groundwater enter the sanitary sewer system through defects such as cracked pipes, deteriorated manholes, separated joints, or failed service lateral connections. As underground infrastructure ages and shifts over time due to rainfall events, traffic vibrations, and construction activities, these defects can worsen. The City maintains approximately 354 miles of sanitary sewer collection piping and 6,680 manholes, all of which require ongoing inspection and maintenance.… p. 1