City of Port Orange, FL · pop. 63K
Tue16Jun6:30 PM
City Council
Tue Jun 16, 6:30 PM · City Council Chambers, 1000 City Center Circle, Port Orange · 5 months ago
City Council Regular Meeting
Agendaportorangefl.api.civicclerk.comMinutesportorangefl.api.civicclerk.comRecording ▸YouTubeMeeting page ↗portorangefl.portal.civicclerk.com
4 items on this agenda match the land-use topicsSubdivisions (2), Comp plan (1), Rezoning (1), Planned developments (1), Infrastructure (1)
Agenda items (35)Show only the 4 matching
- 1.Silent Invocation
- 2.Pledge of Allegiance led by Volusia Young Marines p. 1
- 3.Roll Call
- 4.Public Comments on Consent Agenda Items Only p. 1
- 5.Approval of Minutes
- a.Regular City Council Meeting - June 2, 2026 p. 1
- 6.Bid Awards and Contract Items p. 1
- a.Approval of Task Authorization No. 7 with Zev Cohen & Associates, Inc. for Design of Riverwalk Park Playground Renovations - Parks and Recreation Staff is requesting approval of Task Authorization (TA) No. 7 with Zev Cohen & Associates, Inc. under the Master Contract for Professional Engineering Services relating to the design of Riverwalk Park Playground Renovations in an amount not to exceed $35,025. The scope of work consists of designing renovations and improvements for the drainage within the children's playground area of Riverwalk Park. During heavy rains, water gets below the playground surface and lifts it. To improve the safety and function of the area, the plan will likely include re-grading, removing, and replacing the existing playground surface and subsoils, along with the installation of trench drains or yard drains to tie into the existing stormwater network. p. 1
- b.Approval of Amendment No. 1 to the EJCDC DIS-CMAR525 Agreement with Wharton-Smith for the Force and Water Main River Crossing Project amending Exhibit B – Guaranteed Maximum Price Amendment, establishing the Guaranteed Maximum Price (GMP) for the construction phase of the project - Engineering Staff is requesting approval of Amendment No. 1 to the EJCDC DIS-CMAR525 Agreement with Wharton-Smith for the Force and Water Main River Crossing Construction Project, amending Exhibit B to establish the Guaranteed Maximum Price (GMP) in an amount not to exceed $11,080,440.00 for the construction of the Force and Water Main River Crossing. On November 18, 2025, Council approved the award to Wharton-Smith, Inc. for Construction Manager at Risk (CMAR) services for the Force and Water Main River Crossing and for the pre-construction phase – CMAR Pre-construction Services. During the pre-construction… p. 1
- c.Approval of Task Authorization No. 19 with Pegasus Engineering, LLC for Post-Award Grant Management Services for the FEMA Hurricane Ian Hazard Mitigation Grant Program (HMGP) Grant to Elevate 13 flood-prone homes - Port Orange Project CD242 - Pegasus Engineering, LLC (Pegasus) currently has a contract with the City to assist with the preparation, submission, and post-award management of FEMA grants. Staff is requesting Pegasus's services for post-award grant management of the Hurricane Ian Hazard Mitigation Grant Program (HMGP) Grant, which is for the elevation of thirteen flood-prone homes. Task Authorization No. 19 is contingent upon approval of the Hurricane Ian HMGP Grant Agreement (No. H1331) between the Florida Division of Emergency Management (FDEM), which manages the HMGP grants, and the City of Port Orange for the elevation of thirteen flood-prone homes (also on this agenda as… p. 1
- d.Approval of Task Authorization No. 20 with Pegasus Engineering, LLC for Post-Award Grant Management Services for the FEMA Hurricane Nicole Hazard Mitigation Grant Program (HMGP) Grant to Demolish and Reconstruct one flood-prone home - Port Orange Project CD241 - Pegasus Engineering, LLC (Pegasus) currently has a contract with the City to assist with the preparation, submission, and post-award management of FEMA grants. Staff is requesting Pegasus's services for post-award grant management of the Hurricane Nicole Hazard Mitigation Grant Program (HMGP) Grant, which is for the demolition and reconstruction of one flood-prone home. Task Authorization No. 20 is contingent upon approval of the Hurricane Nicole HMGP Grant Agreement (No. H1301) between the Florida Division of Emergency Management (FDEM), which manages the HMGP grants, and the City of Port Orange for the demolition and… p. 1
- e.Approval of a Six-Month Extension for the Public Utilities Landscape Maintenance Contract with G&G Outdoors, LLC - Staff is requesting a six-month extension of the current Public Utilities Lift Station landscape maintenance contract with G&G Outdoors, LLC. This extension will ensure services continue without interruption while staff prepares a solicitation anticipated to be issued in late summer or early fall. This additional time will allow staff to review and update service requirements, develop specifications, and position the City to receive more competitive and comprehensive proposals. Awarding the solicitation in the fall also aligns better with contractor availability and budgeting cycles. Extending the existing contract ensures continuity of service and maintains the appearance and safety of the City lift stations and treatment facilities. p. 2
- f.Approval of Task Authorization No. 29 with Kimley-Horn & Associates, Inc. for Construction Phase Services for the Force and Water Main River Crossings - Engineering is requesting approval of Task Authorization No. 29 with Kimley-Horn & Associates, Inc. under the Master Contract for Professional Engineering Services (CA7763) as it relates to the Force and Water Main River Crossing Construction Phase Services. This Task Authorization (TA) is presented in conjunction with the item for approval of the Guaranteed Maximum Price (GMP) amendment to Wharton Smith for construction of the project under the Construction Manager at Risk (CMAR) delivery method also on this agenda. Kimley-Horn, Inc., as the Engineer of Record, is responsible for the design of the Halifax River crossing improvements, including the replacement of the potable water transmission main and sanitary sewer force main, and… p. 2
- 7.…Grant Program (HMGP) project to demolish and reconstruct one manufactured home located in the Colony in the Wood Subdivision. On April 22, 2026, the City was provided with the Hurricane Nicole Hazard Mitigation Grant Program (HMGP) Agreement (H1301). The Hurricane Nicole HMGP Grant Agreement has a total project cost of $210,621.60. Of this amount, $160,473.60, or 75% of the total project cost, is federally funded through HMGP. The remaining $50,148.00, or 25% of the total project cost, represents the required non-federal cost share and will be paid by the participating homeowner prior to the commencement of construction. The homeowners’ 25% cost share is not reimbursable under the HMGP program. HMGP is a cost-reimbursement grant program with a 75% federal / 25% non-federal cost share requirement. Under HMGP requirements, the homeowner is required to pay the 25% non-federal cost share p. 2
- 8.Resolution No. 26-31 - Approval of Contract #H1331 for the Hurricane Ian Hazard Mitigation Grant Program (HMGP) to Elevate 13 homes - Port Orange Project CD242 - At the April 18, 2023 meeting, City Council approved Resolution No. 23-15 authorizing staff to submit an application to the Florida Division of Emergency Management (FDEM) for a Hurricane Ian Hazard Mitigation Grant Program Grant to elevate thirteen (13) single-family homes. On March 10, 2026, the Federal Emergency Management Agency (FEMA) officially awarded funding for the Hurricane Ian Hazard Mitigation Grant Program (HMGP) project (Project Number 4673-144-R) to elevate thirteen (13) single-family homes located throughout the east side of Port Orange (see location map). On April 22, 2026, the City was provided with the Hurricane Ian Hazard Mitigation Grant Program (HMGP) Agreement (H1331). The Hurricane Ian HMGP Grant… p. 2
- 9.Resolution No. 26-32 - Implementing and Adopting Water, Wastewater, Reclaimed and Other Miscellaneous Utility Fee Adjustments for the final year of a four-year implementation plan based on the 2023 Rate Study - In November 2023, Council approved Resolution No. 23-26 which updated utility rates and the rate structure. These fees were a result of the 2023 Raftelis Financial Consultants, Inc. (Raftelis) rate study regarding the City's water, wastewater, and reclaimed utility rates and other municipal fees. In June 2024, Council approved Resolution No. 24-18 enacting year two of four of the proposed fee adjustments based on the study and framework approved in 2023. In January 2026, Council approved Resolution No. 26-4 enacting year three of four of the proposed fee adjustments. This Resolution enacts year four, the final year, of the proposed fee adjustments. The 5-year Capital Improvements … p. 2
- 10.Resolution No. 26-33 — Supplementing Resolution No. 26-4 Related to Schedule of Rates, Fees and Charges for City's Provision of Sewer Services for the Town of Ponce Inlet - The City provides sewer service to the Town of Ponce Inlet and its customers pursuant to an Interlocal Agreement entered into on March 23, 1993. This Interlocal Agreement, as amended, requires at least 90 days advance notice by the City to the Town for any proposed sewer rate adjustments. Due to staff changes in the Finance Department, this notice was not provided for the rate increase approved by Council in January 2026. Staff has now sent the required notice to the Town via certified mail and email on March 3, 2026, in compliance with the notice requirements. This supplemental resolution ratifies the rates adopted by Resolution No. 26-4 for the sewer services provided to the Town and establishes an effective date… p. 2
- 11.Resolution No. 26-34 - Approval for the YMCA to apply for a Volusia ECHO Grant Application - The Volusia Flagler Family YMCA is requesting a grant from ECHO to fund a portion of the construction of a new ADA playground, a shade structure, and fencing to enclose the playground area. The new ADA playground will include features for all ages and is designed to help children of all abilities learn and grow through play. The playground will be available for siblings, relatives, and friends who visit the Port Orange YMCA during normal operating hours. The estimated cost for these improvements is $200,000, and the YMCA is requesting a $100,000 grant. As the property owner, the City is required to sign the application and commit to the 20-year Restrictive Covenants on the property if a grant is awarded. ECHO restrictive covenants are legally binding agreements attached to properties that… p. 2
- 12.Resolution No. 26-35 - Accepting the grant award from the U.S. Department of Justice FY25 Patrick Leahy Bulletproof Vest Partnership Project in the amount of $6,327.63 - The U.S. Department of Justice has approved the City’s grant application for the FY25 Patrick Leahy Bulletproof Vest Partnership Project, awarding $6,327.63 to fund slightly less than half of the costs to purchase 8 bulletproof vests for the Police Department. The cost share for this project in the amount of $7,385.73 has been budgeted in the FY26 budget for the Police Department. The total cost to purchase 8 vests is $13,713.36. p. 2
- 13.Resolution No. 26-36 - Authorize the Renaming of the Lakeside Community Center to the Allen Green Center - On May 5, City Council agreed to consider renaming the Lakeside Community Center after former Mayor Allen Green. The naming policy (Resolution No. 16-57) gives the Council authority to name or rename the building/facilities according to a recommendation by the Parks & Recreation Advisory Board. That recommendation was presented at the May 5 meeting and, by Council's authorization at that meeting, the City entered into a 30-day comment period which has expired, and no comments have been received. Council can now consider final action to rename the facility. Staff has reviewed costs associated with the renaming of the building to include new signage on the building and around City Center Circle. Those costs are estimated to be around $5,000 and are available in the current fiscal… p. 2
- 14.Approval of a 30-day Extension to the Post-Closing Occupancy Agreement relating to 846 Bears Trail - At the March 3 meeting, City Council approved the purchase of the property located at 846 Bears Trail to support the future Nixon Lane Stormwater Pond & Pump Station Capital Improvement Project. The property was acquired on April 16, and a Post-Closing Occupancy Agreement was executed, allowing the former owner to remain in the residence through July 16. The former owner has requested an additional 30 days to complete the purchase of a new home and relocate her belongings. The new date for the former owner to vacate the property is on or before August 14, 2026. There is no additional cost associated with this extension. Staff recommends approval of a 30-day extension to the Post-Closing Occupancy Agreement for 846 Bears Trail. p. 2
- 15.Council Members
- 16.City Attorney
- 17.City Manager
- a.Riverwalk Update
- b.Stormwater Projects Update p. 2
- c.Parks and Recreation Bond Projects Update p. 2
- 18.Citizen Advisory Committee for TPO p. 2
- 19.…mixed-use community on the west side of Port Orange. The PC-A zoning district is generally located between Interstate 95 and Tomoka Farms Road, south of the FPL Easement. Location Map of the PC—A Zoning District According to the applicant, the proposed text amendments are to update the PC-A zoning district regulations to support continued development of this area in response to existing market demand, by revising the locations of where uses are allowed to be developed within the PC-A while remaining consistent with the current Planned Community-Westside Future Land Use designation, along with minor clean-up revisions, and clarifications to Chapter 17, Section 29 of the LDC. The PC-A zoning district is required to remain consistent with the underlying Future Land Use (FLU) designation in the Comprehensive Plan for the 1,201-acre PC-A area known as the Planned Community–Westside FLU design p. 3
- 20.First Reading - Ordinance No. 2026-6 - Proposing Amendments to the City's Charter relating to Residency Requirements and Setting a Charter Referendum - In a recent election, questions arose regarding the residency requirement for elected officials. The City Charter sets forth the qualifications that must be met to become a candidate and it currently requires that a person seeking to become a candidate be a resident of Port Orange for at least 12 months. While we assume that this means the candidate should be a resident of Port Orange for at least 12 months immediately prior to the election for which the candidate is attempting to qualify and that the residency is continuous in nature, the Charter language is silent as to when the minimum 12 month residency must take place and whether it must be continuous. After reviewing the relevant case law regarding qualifications for elections… p. 3
- 21.…of Historic Tree Removal Request for the Harbor Landings Subdivision - The applicant, Newkirk Engineering, Inc., representing the property owner Tylo Investments, LLC, has submitted a request to remove seven of the ten historic live oak trees on a 4.7-acre property located between Ridgewood Avenue and Riverside Drive, north of Seminole Avenue (also known as the “Wall Property”). In 1999, approximately 4.2 acres of the 4.7-acre subject property were rezoned to Planned Unit Development (PUD), and a Master Development Agreement (MDA) and Conceptual Development Plan (CDP) were approved for a 49-unit townhome development (Oak Harbor Townhomes). However, the project was not constructed, and the MDA and CDP subsequently expired. In 2019, an additional 0.5 acres was incorporated into the PUD, and the Harbor Landings MDA and CDP were approved by City Council, establishing the framework for the… p. 3
- 22.FY 2026-2027 Budget Discussions (Preliminary 5-Year Capital Improvement Plan and Fleet Replacement) - Staff will present an overview of the following: Preliminary 5-year Capital Improvement Plan (CIP) FY 2027 Fleet Replacement p. 3
- 23.City Council Committee Reports p. 3
- a.First Step Shelter - Councilman Shawn Goepfert p. 3
- b.Port Orange/South Daytona Chamber of Commerce - Councilman Shawn Goepfert p. 3