City of Port Orange, FL · pop. 63K
Tue2Jun6:30 PM
City Council
Tue Jun 2, 6:30 PM · City Council Chambers, 1000 City Center Circle, Port Orange · 6 months ago
City Council Regular Meeting
Agendaportorangefl.api.civicclerk.comMinutesportorangefl.api.civicclerk.comRecording ▸YouTubeMeeting page ↗portorangefl.portal.civicclerk.com
1 item on this agenda matches the land-use topicsVariances (1)
Agenda items (32)Show only the 1 matching
- 1.Silent Invocation
- 2.Pledge of Allegiance p. 1
- 3.Roll Call
- 4.Life-Pak 35 Cardiac Monitor Demonstration - Colleen Fitchett, Division Chief of EMS p. 1
- 5.Public Comments on Consent Agenda Items Only p. 1
- 6.Approval of Minutes
- a.Regular City Council Meeting - May 19, 2026 p. 1
- 7.Bid Awards and Contract Items p. 1
- a.Approval of Amendment No. 1 to Task Authorization No. 3 for Dredging and Marine Consultants, LLC for the Causeway Park South Boat Ramp Project - Amendment No. 1 to Task Authorization No. 3 is necessary for CDBG Compliance Assistance Services for the Causeway Park South Boat Ramp Project. Compliance services include interviews conducted by the engineer with workers on site as well as weekly payroll review to be sure it meets the requirements of the State of Florida for a CDBG grant in the amount of $396,208. When the engineer originally quoted, it was not known at that time that a CDBG grant would be available as a funding source. In order to use the approximately $400,000 in federal funds, specialized reporting is required of the engineer to meet the requirements of the grant. The increase in cost to cover the reporting is not to exceed $10,000, increasing the Task Authorization to… p. 1
- b.Approval of Change Order No. 2 to the Masci General Contractor, Inc. Contract for the St. John's River to Sea Loop Shared-Use Nonmotorized (SUN) Trail Project (CD221) - Community Development staff is requesting approval of Change Order No. 2 to the construction contract ITB #25-13 awarded to Masci General Contractor, Inc., for the construction of the St. John's River to Sea (SJR2C) Loop Shared-Use Nonmotorized (SUN) Trail Project (FDOT #439865) (City of Port Orange Project #CD221). Change Order No. 2 includes modifications to the project due to unforeseen items discovered during construction, amounting to $50,254.30. Total change orders for the project equal $87,986.07, or 5.4% of the contract total. Change Order No. 2 also provides for an additional 6 days, 3 for holidays recognized under the FDOT and City calendars, and 3 for delays associated with water main and reclaim repairs. Due… p. 1
- c.Intent to Award ITB #26-01 Demolition Services for Federally Funded Projects to Reclaim Company, LLC, as the primary and DSR Construction, Inc. and Samsula Demolition as alternates - Staff is requesting City Council approval to award ITB #26-01, Demolition Services for Federally Funded Projects, to Reclaim Company, LLC as the primary contractor, with DSR Construction, Inc. and Samsula Demolition serving as alternate contractors. The purpose of the Invitation to Bid is to establish a pool of qualified demolition contractors to perform work on an as-needed basis for the demolition of structures acquired through federally funded programs such as the FEMA Hazard Mitigation Grant Program (HMGP) and Flood Mitigation Assistance (FMA), as part of the City’s flood mitigation, repetitive loss mitigation, and other related resiliency initiatives. Approval of this award will allow the City to… p. 1
- d.Intent to Award ITB #26-07 City Center Sports Complex Expansion to All State Civil Construction, Inc. - The City received five bids for ITB #26-07 City Center Sports Complex Expansion: This is bond project #1 and is located on the former Silver Sands property adjacent to City Center that was part of the land swap with Volusia County Schools. This project will include multipurpose fields suitable for soccer, flag football, etc., a new restroom/concession facility, and additional parking. Bid summary: All State Civil Construction, Inc.: $3,636,028.16 Paul Culver Construction, Inc.: $3,660,000 Persons Service Corp.: $3,675,278.07 A.G. Pifer Construction: $3,996,000 Legacy Sports Construction: $4,730,560 All State Civil Construction, Inc. is the lowest bidder and is deemed responsive. Staff recommends awarding ITB #26-07 City Center Sports Complex Expansion to All State Civil Construction,… p. 1
- e.Approval of Amendment No. 1 to Task Authorization No. 6 to Paul Culver Construction Co., Inc. for Fire Suppression System Modifications at the YMCA - Staff is requesting approval of Amendment No. 1 to Task Authorization (TA) No. 6 to ITB #24-01 with Paul Culver Construction, Inc. under the City’s Master Contract for Small Construction Projects, in an amount not to exceed $55,698, for the additional required upgrades and modifications to the fire suppression system at the YMCA. The total of the project with the amendment to the task authorization will not exceed $145,398.00. The modifications include providing required upgrades to the existing sprinkler system, additional smoke detectors, alarm pull stations, fire alarm speakers and strobes, additional emergency lights and other fire suppression items. All upgrades and modifications have been required by the City Fire Marshal pursuant to … p. 1
- 8.Resolution No. 26-25 - Budget Resolution for Fire Suppression System Modifications at the YMCA - As part of the Fire Marshal's inspection process for a new fire panel, it was determined that additional fire suppression items are needed in some areas of the YMCA where the use and structure have changed over the years. These changes are necessary to comply with current National Fire Protection Association (NFPA) code requirements. The modifications include providing required upgrades to the existing sprinkler system, additional smoke detectors, alarm pull stations, fire alarm speakers and strobes, additional emergency lights and other fire suppression items. All upgrades and modifications have been required by the City Fire Marshal pursuant to current code requirements and increase the project cost by $55,698. The project expenditure account does not currently have sufficient budgeted… p. 2
- 9.Resolution No. 26-26 - Waiver of Building Permit Fees to bring a Substantially Damaged Structure into Compliance - At the March 18, 2025, City Council Meeting, Council approved waiving building permit fees for structures damaged by Hurricanes Ian, Nicole, and Idalia for participants in the FEMA Hazard Mitigation Grant Program (HMGP), FEMA Flood Mitigation Assistance (FMA) Program, or the Volusia County Transform 386 Program, as well as for property owners bringing substantially damaged structures into compliance with the City’s Land Development Code (LDC) using funds other than state or county grant funding (Resolution No. 25-18). At the time Resolution No. 25-18 was approved, building permit fees for work associated with Hurricane Milton were waived through July 28, 2025, pursuant to Resolution No. 25-10. Therefore, the current resolution waiving building permit fees for structures… p. 2
- 10.Resolution No. 26-27 - Approval to apply for a Volusia ECHO Grant Application for the Willow Run Park Expansion - Parks and Recreation staff is requesting permission to apply for a Volusia ECHO grant to improve Willow Run Park to include a new restroom facility, lighted basketball court, bicycle playground and a traditional playground. Improving this area and offering more recreational activities will enhance the value of the park to residents and visitors. If awarded, ECHO will require the City to commit up to a $2,000,000 match. An additional budgeted amount of $6,000 is required for ECHO signage, which brings the total project cost to $4,006,000.00. Willow Run Park Expansion is a bond project. If awarded a Volusia County ECHO Grant, the City would be required to provide restrictive Covenants to the County that will limit future use of the improved areas for twenty years. Those… p. 2
- 11.Resolution No. 26-28 - Approval of State of Florida Department of Transportation (FDOT) Highway Lighting, Maintenance, and Compensation Agreement (FDOT #AT673) - The State Highway Agreement between the City and the Florida Department of Transportation (FDOT) provides for FDOT to compensate the City in exchange for the maintenance of the lighting and lighting systems on State roads located within City limits. FDOT is proposing a new seven-year agreement (#AT763) effective July 1, 2026 through June 30, 2033. Under the new agreement, the per-light unit rate shall increase by 3% each fiscal year with the upcoming fiscal year 2026/27 rate being $358.33. The State agrees to pay the City $92,234.14 for fiscal year 2026-27. The lighting and lighting systems to be maintained by the City are located on the following State roads: Nova Road (SR 5A) US 1/Ridgewood Ave. (SR 5) Dunlawton Ave. (SR 421) … p. 2
- 12.Resolution No. 26-29 - Amending the CDBG PY2025 Annual Action Plan - The City received a $354,806 allocation from the U.S. Department of Housing and Urban Development (HUD) to support the Memorial Park Multi-Use Trail Project. During project implementation, staff determined that the federal procurement, bidding, and compliance requirements associated with the grant would significantly increase the administrative complexity, cost, and timeline of delivering the trail project. After further evaluation, it was determined that reallocating the funding to an eligible infrastructure project with a more efficient implementation path would better maximize the use of the grant funds and expedite delivery of community benefits. As a result, the City proposes to amend the Program Year (PY) 2025 Annual Action Plan (AAP) to reallocate the $354,806 in HUD funding from the Memorial Park Multi-Use… p. 2
- 13.Police Department K9 Mila Transfer to Officer J. Alevisatos - K-9 Mila has served as a Police Dog with the Port Orange Police Department for three and a half years. Due to her performance issues and multiple handlers, K-9 Mila will be retired from service. Ownership of K-9 Mila will be transferred to her handler, Officer Jarrad Alevisatos, pursuant to the agreement drafted by the City Attorney's Office. p. 2
- 14.Faith, Family and Responsible Fatherhood Month - Proclamation p. 2
- 15.Council Members
- 16.City Attorney
- 17.City Manager
- a.Riverwalk Update
- b.Stormwater Projects Update p. 2
- c.Parks and Recreation Bond Projects Update p. 2
- 18.Report from KemperSports on the Cypress Head Golf p. 2
- 19.Golf Advisory Board Report p. 2
- 20.Appeal of Planning Commission Denial of a Variance for 5968 Shady Creek Lane - At the April 2026 Planning Commission meeting, the Planning Commission denied (4-1) the applicant’s request to allow a 6-foot-tall fence, installed approximately 10 years ago without a building permit, to remain in a secondary front yard on a corner lot in lieu of being relocated to comply with the requirement that it be aligned with the front plane of the house. The subject property is located at 5968 Shady Creek Lane, at the northwest corner where two segments of Shady Creek Lane intersect. According to the Land Development Code (LDC), the subject property is classified as a corner lot because it is adjacent to two public rights-of-way (the intersection of two segments of Shady Creek Lane) and therefore has both a primary and secondary front yard. The LDC requires that a 6-foot-tall fence located in a… p. 2
- 21.City Council Committee Reports p. 2
- a.Volusia Flagler TPO - Vice Mayor Tracy Grubbs p. 2
- b.General Employee's Pension Board - Mayor Scott Stiltner p. 3