Town of Manchester-By-the-Sea, MA · pop. 5K
Tue24Nov
Conservation Commission
Tue Nov 24 · in 2 days
Agenda
Agendamanchester.ma.us
Minutesafter the meeting
Meeting page ↗manchester.ma.usAdd to calendar.ics for Outlook, Google, AppleThis agenda in plain words
Leer en españolThis is a virtual meeting of the Manchester-By-The-Sea Conservation Commission on Tuesday, November 24, 2026, at 6:30 PM, held on Zoom. The main items are public hearings on wetland and waterfront permit requests, including a proposed 136-apartment building on 0 School Street and a dock replacement at Tucks Point.
- A request to build a three-story building with 136 apartments, a driveway from School Street, a parking garage and stormwater systems. The public hearing on it is listed first. Touches: Neighbors of 0 School Street; applicant Geoffrey Engler; property owner Andrew Brown.The public may speak p. 2
- A request to confirm where wetland areas are and what rules apply to them on part of the Pine Street property. Touches: Gordon College property at 0 Pine Street; applicant JAG Northeast Development Company LLC.The public may speak p. 2
- A request to replace three floating docks with four new floating docks and new moorings, and create a reconfiguration zone, in the ocean floor area. Touches: Manchester Sailing Association at 13 Tucks Point.The public may speak p. 2
- A request to remove asphalt and replace it with pea stone in a riverfront area. Touches: 7 Central Street; applicant AGEM Management, LLC.The public may speak p. 3
- A request to approve a drywell already installed in a riverfront area, after the work was done. Touches: 7 Central Street; applicant AGEM Management, LLC.The public may speak p. 3
- A request to confirm that a replaced septic system meets the rules, so the work can be closed out. Touches: 21 Eaglehead Road; applicant Christine Gauthier-Kelley.The public may speak p. 3
- A request to confirm that an addition to a house and the move of a garage meet the conditions of an earlier permit. Touches: 53 Pleasant Street; applicant Pamela Thorne.The public may speak p. 3
- Possible written decisions (orders of conditions) on the School Street apartment project, the Pine Street wetland request and the Tucks Point dock request. These are listed to follow the hearings if the hearings are closed. Touches: Same properties as the hearings above. p. 3
- Public comment period, when residents may speak on topics not listed as hearings. Touches: Residents.The public may speak p. 4
- Review of the minutes (written record) of the October 13, 2026 meeting. p. 4
Words on this agenda, explained
- Notice of Intent
- A formal request to do work near wetlands or the ocean, which the commission reviews before work starts.
- Request for a Determination of Applicability
- A request asking the commission whether a planned or completed project needs its review under the wetland rules.
- Certificate of Compliance
- A written statement that work done under an earlier permit was finished as the permit required.
- Riverfront Area
- The strip of land next to a river or stream that is protected by wetland rules.
- After-The-Fact
- Work that was already done before asking for the required approval.
Written by AI from the agenda, Nov 18. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
Agenda items (2)
- …Applicant: Geoffrey Engler Property Owner: Andrew Brown Project: The proposed project includes the construction of a 92,560± square foot, three-story multifamily residential building containing 136 apartment units in the northern portions of the property. The site development includes an access driveway to enter the development via School Street, minor surface parking, parking garage, utilities, outdoor amenities, stormwater management, and a native landscaping plan. 2.) Abbreviated Notice of Resource Area Delineation: MassDEP #039-0955, 0 Pine Street, Manchester-By-The-Sea. Applicant: JAG Nor… p. 2
- …Applicant: Geoffrey Engler Property Owner: Andrew Brown Project: The proposed project includes the construction of a 92,560± square foot, three-story multifamily residential building containing 136 apartment units in the northern portions of the property. The site development includes an access driveway to enter the development via School p. 3