14 items on this agenda match the land-use topicsData centers & plants (11), Moratoriums (5), Variances (2), Special use (1)
Agenda items (15)Show all 15
- …ts to the Town’s zoning laws to appropriately address the same within the confines of New York State law. The Town Board believes that a twelve-month moratorium after the effective date of this Local Law, coupled with the mechanism for use variances already contained in the Zoning Ordinance of the Town of York, will achieve an appropriate balancing of interests between the need to safeguard the character and other resources of the Town and the health, safety and general welfare of its residents, and the rights of individual property owners or businesses desiring to conduct such activities duri… p. 4
- a. “Data Center” shall mean any facility, in whole or in part, primarily used to house and operate computer servers, networking equipment, data storage equipment, and related infrastructure, together with backup power systems (including generators and battery systems), cooling and humidity control systems, electrical switching and substation equipment, security systems, office or support areas, and other appurtenant uses, whether for private, commercial, or institutional purposes. For the avoidance of doubt, a “Data Center” includes but is not limited to facilities used for cloud computing, co… p. 4
- b. “Minor Server Room” shall mean a room or area that is accessory to a primary use on the same premises, serving only that primary use, without dedicated backup generation or external cooling equipment beyond typical commercial HVAC for the principal use. A Minor Server Room is not a Data Center. p. 4
- a. any board, employee, official or agent of the Town for the construction, establishment, or use or operation of any land, body of water, building, or other structure located within the Town for a Data Center. p. 5
- a. Existing Data Centers. Ordinary repair, maintenance, or like-kind replacement for Existing Data Centers may proceed if such work does not: (a) increase the gross floor area devoted to the Data Center use; (b) increase connected electrical load beyond the pre-moratorium level; (c) install new or larger backup generation or battery energy storage systems; or (d) materially increase noise, water usage, traffic, or other off-site impacts. The Code Enforcement Officer shall determine eligibility under this subsection. p. 5
- a. During the moratorium, the Town Board, with assistance from Town staff, the Planning Board, and such consultants as the Town may retain, shall undertake a comprehensive study of Data Centers, including but not limited to: appropriate siting locations; dimensional, intensity, and performance standards; environmental review protocols; energy, water, and infrastructure considerations; decommissioning; financial surety; and monitoring and enforcement mechanisms. p. 5
- b. The Town Board may consider and adopt amendments to the Zoning Ordinance of the Town of York to address Data Centers, and may establish application requirements, special use criteria, setbacks, screening, noise limits, hours of operation, energy and water efficiency standards, backup power and storage system standards, traffic management plans, environmental monitoring, emergency response plans, and decommissioning and site restoration requirements. p. 5
- a. The Town Board may, by local law after notice and public hearing, extend the moratorium for up to two additional periods of up to six (6) months each if it determines that (a) the study referenced in Section 6 is ongoing and additional time is reasonably necessary to complete and implement appropriate legislative measures, and (b) the extension continues to be necessary to protect the public health, safety, and welfare. p. 6
- b. The Town Board may, by resolution, terminate the moratorium prior to its scheduled expiration if it determines that the purposes of this Local Law have been satisfied or superseded by adopted amendments to the Zoning Ordinance of the Town of York. Section 8. Administration and Enforcement p. 6
- …questions and comments: There were many questions, and statements from the public. The majority consensus was that the Town of York cannot support a data center of any size. Q - What kind of hardship would override these conditions. R – It would be a use variance, which would be the standard of an instance where the use of land is in question. The only practical economical use would be a data center, and those who are on the zoning board feel they a p. 7
- R – The governors order is a narrower scope of what is considered a data center; 50 megawatts. Anything less than that would not be covered. The Towns’ proposed law is written as the primary purpose of the facility. S - Thank you for having this Public Hearing. My biggest concern is that they have a life expectancy anywhere from 10-15 years. Then after that it is very expensive to update equipment and technology. Q – Has the town been approached or has there been an inquiry from any companies or contractors? R – No. S – I believe that it was in Manlius, NY where they also just passed a morator… p. 8
- …f these, but what is the upside? R – The upside would depend on where you stand, if you google, or use AI the quick search, those are a result of the data centers. The local standpoint is usually revenue. S – There was a BusinessWeek Magazine article recently about the data center theft that happened in England in 2006. It discussed why companies who build the data centers don’t want anyone to know where they are physically. That it is kept secret. If you have a phone, as in the article – the reason they are so small is because it is just a battery and an antenna. They say all the information… p. 9
- R – There is not a goal on the State level to be building data centers. The State had renewable energy goals which is why they established the State Program. Could they adopt something at the State level, yes. There had been predecessor statues for renewable electric. There is nothing on a state level like that to build data centers. Q – If a center was put in, what happens to taxes for owners that are already agricultural? For example, if it is agricultural, then bought for the data center and a building goes up and it is turned into commercial use, would that drive the price up for agricultu… p. 10
- 1. Land Use Agreement Form -Flats Road Pump Station, authorize MRB project bids. -Hurricane Firewall Update Approval. -White Creek Solar Historic Resources Mitigation. -Designating Livingston Country Sheriff’s Dog Control as beneficiary of donations. -Data Center Adjournment: p. 1
24 more passages from inside the staff reports, forms and minutes attached to this agenda are not listed as agenda items. Search finds every word of them.