Board of Public Works Meeting
Agendafortwaynein.api.civicclerk.comMinutesfortwaynein.api.civicclerk.comRecording ▸fortwaynein.portal.civicclerk.comMeeting page ↗fortwaynein.portal.civicclerk.com
Agenda items (27)
- 1.Approval of Board of Public Works Minutes for the week of October 27, 2026. p. 1
- 2.Approval of Resolution #113-11-3-26-1, CU 2027 On-Call Concrete Patching. p. 1
- 3.Approval of Resolution #113-11-3-26-2, CU 2027 On-Call Asphalt Patching. p. 1
- 4.Approval of Resolution #113-11-3-26-3, CU 2027 On-Call Emergency Construction. p. 1
- 5.Approval of Professional Services Agreement between the City of Fort Wayne and Donohue & Associates for Water Treatment Planning. Compensation for services performed shall not exceed $95,000.00. p. 1
- 6.Approval of Professional Services Agreement between the City of Fort Wayne and Jacobs Engineering for Water Treatment Planning. Compensation for services performed shall not exceed $95,000.00. p. 1
- 7.Approval of Professional Services Agreement between the City of Fort Wayne and Arcadis for Water Treatment Planning. Compensation for services performed shall not exceed $95,000.00. p. 1
- 8.Approval of Amendment #1 to Professional Services Agreement between the City of Fort Wayne and Phoenix Consulting for Resolution #92130, 2026 Programming Support Services. Compensation for services performed shall be increased by $30,000.00, bringing the total not to exceed fee to $60,0000.00, and extends the completion date to June 30, 2027. p. 1
- 9.Approval of Amendment #1 to Professional Services Agreement between the City of Fort Wayne and Engineering Resources for Resolution #0768R, Pufferbelly Pedestrian Bridge over Coliseum Blvd/SR 930. Compensation for services performed shall be increased by $42,846.84, bringing the total fee not to exceed $698,446.84. p. 1
- 10.Approval of Service Agreement between the City of Fort Wayne and ALmix for Construction of Asphalt Plant at City of Fort Wayne Street Department. Compensation for services performed shall be $6,880,058.00. p. 1
- 11.Approval of Change Order #2 between the City of Fort Wayne and Schenkel Construction for Contract #112-9-16-25-1, 335 Murray Street Building. This change order increases the original contract price by $245,679.00 to a new contract price of $3,295,842.00. p. 1
- 12.Approval of recommendation from Flood Control to award #0880P, Flood Buyouts Demolition: 6931 Woodbrook Drive to DZ Contracting in the amount of $21,000.00. p. 1
- 13.Approval of recommendation from Streetlight Engineering to award #1119N, 1000-1200 blocks Drexel Ave Street Lighting Improvements to Indoor Wireless in the amount of $58,260.00. p. 1
- 14.Approval of recommendation from City Utilities to award #67680, Tract 10 Lead Service Line and Water Main Replacement to All Seasons Underground Construction in the amount of $6,232,595.00. p. 1
- 15.Approval of recommendation from Property Management to award #113-9-1-26-4, Fire Station #5 to Schenkel Construction in the amount of $5,395,000.00. p. 2
- 16.Approval of Owner-Contractor Agreement #0768R, Pufferbelly Pedestrian Bridge over Coliseum Blvd/SR 930 between the City of Fort Wayne and Beaty Construction in the amount of $9,884,692.99. p. 2
- 17.Approval of Owner-Contractor Agreement #0798D, Alleys North/South & East/West: West Packard Ave, Kinsmoor Ave, Beaver Ave and Broadway between the City of Fort Wayne and Malott Contracting in the amount of $204,088.50. p. 2
- 18.Approval of Owner-Contractor Agreement #113-9-1-26-4, Fire Station #5 between the City of Fort Wayne and Schenkel Construction in the amount of $5,395,000.00. p. 2
- 19.Recommendation from City Utilities to correct the scrivener’s error for Professional Services Agreement between the City of Fort Wayne and DLZ Indiana for Lagoon and Biosolids Surveying. Compensation for services performed shall not exceed $74,000.00. Actual amount: $74,400.00 p. 2
- 20.Acceptance of the work performed by Pulver Asphalt Paving for #0682S, East State Blvd Sidewalk: Simcoe Dr to Arrowwood Dr as an integral part of the City’s transportation system. p. 2
- 21.Acceptance of the work performed by Indoor Wireless for #1032L, Tecumseh Street Lighting Improvements from Edgewater Ave to Tennessee Ave as an integral part of the City’s streetlight system. p. 2
- 22.Acceptance of the work performed by All Seasons Underground Construction for #67006, Anthony and McKinnie WMR as an integral part of the City’s water distribution system. p. 2
- 23.Acceptance of the work performed by Star Excavating for #2025-S-0297, The Commons at Wood Creek Phase II as an integral part of the City's sanitary sewer system. p. 2
- 24.Acceptance of the work performed by Star Excavating for #2025-W-0153, The Commons at Wood Creek Phase II as an integral part of the City’s water distribution system. p. 2
- 25.Approval of City Utilities Payroll Claims in the net amount of $863,155.55 for the pay period ending October 17, 2026. p. 2
- 26.Approval of Civil City Accounting Claims in the amount of $9,063,583.62 for the week of October 27, 2026. p. 2
- 27.Approval of City Utilities Accounting Claims in the amount of $3,115,056.34 for the week of November 3, 2026. p. 2