Town of Auburn, MA · pop. 17K
Wed18Nov
Conservation Commission
Wed Nov 18 · 4 days ago
Agenda
This agenda in plain words
Leer en españolThis is a regular monthly meeting of the Auburn, MA Conservation Commission on Wednesday, November 18, 2026, at 7 PM at Town Hall. Most of the agenda covers wetland permit requests (Notices of Intent) for projects near wetlands, and two of them are public hearings that were postponed from October 28, 2026.
- A request to build six commercial warehouse buildings, about 75,200 square feet, with offices. Three warehouses would sit within the 100-foot wetland buffer zone. This is a public hearing and was continued from October 28, 2026. Touches: Applicant 190 Washington Auburn, LLC; 190 Washington Street (Map 34, Parcel 4).The public may speak p. 1
- A request to build a water treatment facility of about 3,950 square feet to remove PFAS. This is a public hearing and was continued from October 28, 2026. Touches: Auburn Water District; 76 Church Street and Ridgewood Drive Rear.The public may speak p. 1
- A request to build a 125-foot-long, 4-foot-high stone retaining wall, with a boat ramp and gate, about 1 foot from the seasonal high-water line of Stoneville reservoir. Touches: Applicants Eric Culross and Sean Couture; 30 & 34 Pollier Way. p. 1
- A discussion of the public hearing schedule for 2027. p. 1
Words on this agenda, explained
- Notice of Intent
- A formal application asking the commission to approve work near wetlands.
- wetland buffer zone
- The area around a wetland, here 100 feet wide, where work is watched closely to protect the wetland.
- Continued
- Postponed from an earlier meeting to a later date, so the item is still open.
- Public Hearings
- Items where the public is allowed to speak about the request.
- Seasonal high-water line
- The usual highest level the water reaches during the year, marking the edge of the reservoir.
- PFAS
- A group of man-made chemicals that can get into drinking water and must be removed from it.
Written by AI from the agenda, Nov 17. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
Agenda items (1)
- 1. 190 Washington Street (Map 34, Parcel 4) (CC-26-15) (Continued from 10/28/26) Applicant 190 Washington Auburn, LLC with a Notice of Intent for the construction of six commercial warehouse buildings (±75,200 SF) with accessory offices. Three warehouses will be located within the 100-foot wetland buffer zone. p. 1