Township of Hempfield, PA · pop. 42K
Mon26Oct
Board of Supervisors
Mon Oct 26 · 27 days ago
Township Supervisors Regular Public Meeting
3 items on this agenda match the land-use topicsSite plans (1), Subdivisions (1), Rezoning (1), Industrial land (1)
Agenda items (10)Show only the 3 matching
- …foot convenience store and fuel canopy with 5 fueling dispenser islands, parking spaces, trash enclosure and 2 underground storage tanks. Conceptual site plan provides for one entrance/exit driveway at the northwest corner of the site along Lincoln Highway • Planning Commission: 1-5 • Contingent Upon: NPDES Permit approval; MAWC/DEP approval; PennDOT HOP approval; stormwater management approval from Township engineer; Hydrant location approval from Township Fire Chief p. 2
- e. Consideration to Approve Resolution No. 2026-144; Granting Final Conditional Approval for the Hunter Subdivision A Revision to the Myrna Downes Plan No. 3 – Plan No. PA-26-42 • Applicant: Joseph Vidakovich, Jones Consultants • Tax Map: 50-09-00-0-248 • Location: Downes Road • Purpose: remove the PA DEP non-building declaration from the parcel. The prior subdivision plan, recorded in instrument #202011120038694, labeled lot 3 is a non-buildable lot • Planning Commission: 6-0 • Contingent Upon: sewage right-of way and coordinate with MAWC p. 3
- c. Consideration to Authorize the Township Solicitor to Advertise the Proposed Rezoning of Tax Map Nos. 50-28-00-0-313 and 50-28-00-0-283 from Regional Commercial to Light Industrial, and to Schedule the Public Hearing for 6:00 pm on Wednesday, December 16, 2026 p. 5
- c. Consideration to Approve Resolution No. 2026-142; Granting Final Conditional Approval for the Gerber Collision & Glass Center – Plan No. PA-26-38 • Applicant: Anthony Simelis, Civil & Environmental Consultants, Inc. • Tax Map: 50-13-00-0-093 • Location: 6660 State Route 30, Greensburg, PA 15601 • Purpose: for development of a new Gerber Collision and Glass Center Facility ~ 16,570 square feet • Planning Commission: 6-0 • Contingent Upon: Obtain Township Engineer stormwater management approval; obtain NPDES approval; obtain PennDOT HOP approval p. 2
- d. Consideration to Approve Resolution No. 2026-143; Granting Final Approval for the 17th Amendment to Spyglass Trails Phase 1 – Plan No. PA-26-41 • Applicant: Keith Higgins, Keystone Surveying & Mapping, Inc. • Tax Map: 50-33-13-0-198 • Location: 5153 Bentgrass Drive • Purpose: Realign the interior property line to conform with the survey as-built location of the poured foundation p. 2
- a. Consideration to Approve Ordinance No. 2026-07; Which Authorizes the Incurrence of Nonelectoral Indebtedness in the Maximum Principal Amount of $12,215,000 for the Purpose of Financing Various Capital Improvements to Township Facilities Including Municipal Buildings, Public Safety Facilities, Roads, Bridges, Stormwater Facilities, Parks and Recreation Facilities, and Related Improvements Along with the Acquisition of Vehicles, Machinery, Apparatus, and Equipment for Township Purposes, as Presented by Bond Counsel, Sean Garin of Dinsmore & Shohl. The Final Par Amount of the Bonds will be Lim… p. 3
- b. Consideration to Accept the DCNR Community Conservation Partnerships Program Grant Award in the amount of $70,000.00 to Prepare the Hempfield Township Comprehensive Recreation, Park and Open Space Plan, and to Authorize the Execution of the Grant Agreement and Related Documents p. 4
- a. Consideration to Approve Estimate #1538 from Donahue’s Heating and Cooling (COSTARS Contract 008-E24-1281) in the Amount of $42,513.00 for the Replacement of Three Rooftop HVAC Units at the Municipal Building and Authorize the Director of Public Works to Execute all Necessary Documents p. 4
- b. Consideration to Authorize the Township Manager to Advertise the Annual Commodity Bids p. 4
- c. Consideration to Approve Change Order #1 in the Amount of $(35,447.86) to Strawser Construction for the 2026 Shot and Chip/Microresurfacing Program – Contract 3/2026 p. 4