GovMeet
Sign in
Marion County, FL · pop. 386K
Mon16Nov9:00 AM

Development Review Committee

Mon Nov 16, 9:00 AM · Office of the County Engineer · Final · 6 days ago

This agenda in plain words

Leer en español

This is a regular meeting of the Marion County Development Review Committee, a county staff panel that reviews land and building plans, on Monday, November 16, 2026 at 9:00 AM at the Office of the County Engineer. Most of the items are requests to waive (skip or change) a county code rule for a specific property, and a few are site plans that the committee is asked to approve.

  1. Ramharrack Office Building site plan is on the consent agenda, where staff recommends approval. Items on consent are usually approved together in one vote. Touches: Parcel 4713-186-002. p. 1
  2. Request to waive a county rule that requires a county MSBU (a special taxing district for maintenance) to be set up before a lot split is finished. The applicant offers an easement agreement for maintenance and HOA documents instead. Touches: Moss Bluff Preserve, parcel 39644-002-00, agricultural lot split. p. 1
  3. Request to allow a right-turn lane on SW 60th Avenue to be reviewed and approved as part of the site plan, instead of submitting a separate plan for a 180-foot turn lane. This item was tabled (postponed) for one week at the November 9, 2026 meeting, so a motion to un-table it is needed first. Touches: Freedom Crossings Commercial, parcel 35699-006-03, SW 60th Avenue. p. 2
  4. Request to skip the preliminary plat step and go straight to the final plat, and to skip the improvement plan, because the applicant says no utilities, access, or road work is proposed. Touches: Lloyd-Boehler, parcel 4941-011-000. p. 2
  5. Request to let a new home and an existing home both connect to septic instead of the sewer system. The applicant says running sewer lines from SE 95th Street would cost over one hundred thousand dollars. Touches: Terzian, parcel 3682-006-000, new and existing homes. p. 3
  6. Request to split a rural property in half so a parcel can go to the applicant's sister for a permanent home, a family division. The applicant plans to put a mobile home on the new parcel. This needs a waiver under the county's family division rules. Touches: Johnson family division, parcel 03814-006-00, immediate family members. p. 4
Words on this agenda, explained
Consent agenda
A group of routine items that staff recommends approving, which are usually approved together in one vote.
Major Site Plan
A detailed drawing of how a larger piece of land will be built on, such as roads, buildings, and parking.
Waiver
Permission to skip or change a county code rule for a specific project.
MSBU
A municipal service benefit unit, a special area that pays for upkeep of certain improvements through charges to the property owners in it.
Tabled
Postponed to a later meeting.
Family division
A rule that lets a rural parcel be split so immediate family members can live on the new parcels.

Written by AI from the agenda, Nov 14. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.

5 items on this agenda match the land-use topicsSubdivisions (3), Site plans (2), Water & sewer (1)

Agenda items (18)Show all 18