GovMeet
Sign in
Wed18Nov

Shaker Lane Building Committee

Wed Nov 18 · 4 days ago

Shaker Lane School Building Committee Meeting - November 18th, 2026 @ 7:00 PM - Virtual via Zoom

This agenda in plain words

Leer en español

This is a regular monthly meeting of the Shaker Lane School Building Committee, held online on Zoom on Wednesday, November 18, 2026 at 7 pm. The committee will look at the project's schedule, budget, contracts and invoices for a new Shaker Lane school building, and several items are marked as possible votes.

  1. Approve the minutes of the October 21, 2026 committee meeting. p. 1
  2. Choose three committee members to take part in a meeting on prequalifying sub-bidders, which is set for December 16, 2026. Touches: Subcontractors bidding on the school project. p. 1
  3. Possible vote to approve the 60% construction documents being submitted to the MSBA, listed for the December 16, 2026 meeting. p. 2
  4. Possible vote to approve the 90% construction documents being submitted to the MSBA, listed for the April 21, 2027 meeting. p. 2
  5. Update on the construction manager contract with Gilbane, and a possible vote to update the committee member Tony Sousa. p. 2
  6. Add-on design work by Studio G for the Conservation Commission: a wetlands tree inventory. Touches: Abutters at 33 and 37 Shaker Lane; the Conservation Commission. p. 2
  7. Add-on design work by Studio G for radon mitigation design. p. 2
  8. Possible special committee meeting on December 2, 2026, to approve the Gilbane contract and a proposal for a structural peer review. p. 1
  9. Review of bills (invoices) for October 2026, including Gilbane ($12,500.00 for preconstruction), Turner & Townsend Heery ($84,265.00) and two Studio G invoices with amounts still to be determined. $12,500.00 (Gilbane); $84,265.00 (Turner & Townsend Heery). p. 2
  10. Review the project budget from Turner & Townsend Heery dated 10/31/26 and the MSBA ProPay update. p. 1
Words on this agenda, explained
OPM
Owner's Project Manager, the outside firm (here Turner & Townsend Heery) that helps the town oversee the building project.
MSBA
the Massachusetts School Building Authority, the state agency that helps pay for school building projects and must review project documents.
Change orders
written changes to a contract that add, remove or alter work and usually change the cost or schedule.
Peer review
a second expert's independent check of another professional's work, here a structural review of the building's frame.
Prequalification
a check done before bids are opened to decide which contractors are qualified to bid on the work.
Abutters
property owners whose land touches or sits next to the project site.

Written by AI from the agenda, Nov 14. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.

Agenda items (2)