City of Fernley, NV · pop. 24K
Wed3Jun5:00 PM
City Council
Wed Jun 3, 5:00 PM · 6 months ago
Fernley City Council
Agendafernleynv.api.civicclerk.comMinutesfernleynv.api.civicclerk.comMeeting page ↗fernleynv.portal.civicclerk.com
2 items on this agenda match the land-use topicsHousing (1), Planned developments (1)
Agenda items (18)Show only the 2 matching
- 1.1.Pledge of Allegiance p. 2
- 1.2.Roll Call
- 1.3.Public Forum
- 1.4.(For Possible Action) Approval of Agenda p. 2
- 2.1.(Possible Action) Approval of Voucher Report p. 2
- 2.2.(Possible Approval) Approval of Business Licenses p. 2
- 2.3.Discussion and possible approval of Professional Services Contract with Verus AEC for SCADA design and programming services. This project will provide a SCADA design, Bidding Services, Construction Management, Inspections and programming with commissioning services for the Wastewater Collections System, for the total cost of $369,722.00. - This contract will provide the Wastewater collections system pump stations, Wastewater Treatment Plant, and North East Water Tank repeater station, a SCADA control panel design, plan and specification set along with Bidding Services, Construction Management, Inspection, Programming and Commissioning. The total cost of this project will be $369,722.00. p. 2
- 2.4.Possible Action to Approve the Will-Serve Request from Stor-All - Onsite improvements for 0.78 ERC's of water for Lyon County Parcel 021-132-64 located at 715 Hwy 95A, Fernley, NV 89408. - 1. Stor-All, LLC is seeking a will-serve for Onsite Improvements. 2. This project requires 0.78 ERC's for water. p. 2
- 2.5.Discussion and possible action to approve a contract with Artistic Fence Co., Inc. for the Water Treatment Plant Main Gate Repair and Improvements. This project will repair the WTP main gates, provide new gate operators and improve the design of the gate to minimize future issues. The cost will be $44,984.00 - This project will rehabilitate and improve the facility main gate. The gate has been in continuous operation since 2009 and is in need of repair and modernization. The gate operators are antiquated and will be replaced. The gate mechanical and metal fabrication will be improved as well. p. 2
- 2.6.Discussion and possible action to approve a contract with Raftelis in the amount not to exceed $70,380 for review of the proposed Fernley Power District Ordinance and working group report. - Mark IV Capital, LLC is proposing the creation of the Fernley Power District to serve Victory Logistics District. Upon receipt of the required Ordinance and working group report, staff concluded that it would be in the City's best interest to have these documents reviewed by someone with experience in evaluating the feasibility of power districts. Raftelis has the largest public utility financial and management consulting practice in the nation and can provide the specialized review needed for this undertaking. p. 2
- 2.7.Discussion and possible action for approval of a contract with Jensen Engineering Inc. to provide design, bid services and construction management for the Water Treatment Plant, Generator Connection Project for an amount not to exceed $48,500. - Discussion and possible approval of a contract with Jensen Engineering Inc. to provide design, bid services and construction management for the Water Treatment Plant, Generator Connection Project. The Water Treatment Plant has no specified connection point to plug in a temporary generator. This project would identify and design a specific and permanent location for a temporary emergency generator to be parked at the Plant and provide power if the current generator is out of service. The Plant generator is currently out of service and is being repaired. Providing a connection point for an alternate generator is urgent because there is currently… p. 2
- 2.8.Discussion and possible action to approve Change Order #1 on the construction of Ricci Tank 2. Cost of CO1 is in the amount of $37,956.00 - This Change Order will provide the bent plate, external rafter system for the new tank, along with a guard rail. This type of tank construction will match the new Water Treatment Plant Tank 2 that was recently constructed. This Change Order 1 also provides an alternate underground pipe location due to a conflict on site. p. 2
- 3.1.Reports by City Staff, City Council, and the Mayor, including but not limited to monthly statistical reports by city departments. p. 2
- 5.1.(For Possible Action) and discussion to accept the renewal proposal from Nevada Public Agency Insurance Pool (POOL) and approval for payment of $475,899.68 with a deductible of $2,000.00 per claim from fiscal year 2026-2027 funds. - (For Possible Action) and discussion to accept the renewal proposal from Nevada Public Agency Insurance Pool (POOL) and approval for payment of $475,899.68 with a deductible of $2,000.00 per claim from fiscal year 2026–2027 funds. Attached is the Member Coverage Summary for review. Changes within the 2026-2027 Coverage: 1. Property Per Loss Limit Increased to $500,000,000 2. Equipment Breakdown Limit Increased to $150,000,000 3. Cyber Liability Changes a. $1,000,000 Limit/Aggregate Per Member for First- and Third-Party Liability b. $500,000 Sub-Limit for Cyber Crime Coverage 4. Exclusion that is specific to PFAS has been added 5. The definition for Agreed… p. 2
- 5.2.Presentation from Mendy Elliot from Summit Government Affairs regarding Nevada Assembly Bill 540 signed into law in 2025. - Assembly Bill 540 provides the State of Nevada with a framework to increase attainable housing units for middle-income households through public-private partnerships, targeted funding, and regulatory streamlining. For the City of Fernley, this legislation presents a strategic opportunity to address workforce housing shortages driven by regional economic growth. Overall, AB 540 represents a significant opportunity to expand housing supply and support economic stability in the region. Ms. Elliott will provide an overview of Assembly Bill 540 and its potential application in the City of Fernley. p. 2
- 6.1.Possible action to revise Title 2, Chapter 8 of the Fernley Municipal Code to remove City Manager and add new evaluation requirements as follows: Evaluations. The Ma yor shall evaluate the following positions once a year at a minimum. City Attorney City Clerk City Finance Director Human Resources Manager Chief Development Officer Chief Operations Officer Evaluations will be conducted by the Mayor with an evaluation form that has been approved by City Council. The Mayor shall solicit evaluations for these positions and consult the City Council evaluations in preparing his Ffinal evaluation. The City Council evaluations will be public and subject to public record requests by the public. The Mayor has the discretion, but is not required to solicit peer review from the statutory employees, using an approved peer review form. - Possible action to revise Title 2, Chapter 8 of the Fernley… p. 3
- 6.2.…Modification to the handbook associated with the Friendly 5 Planned Development requested by Scott Berge to modify : 1) the proposed arterial roadway connection from the northern boundary of the development to U.S. Highway 50, 2) adding a new section to the handbook to establish design standards and requirements for the arterial roadway connection, and 3) revising Condition 4.K to modify the timing requirement for construction of the roadway connection, along with other clarifying revisions. The subject site is generally located on both the north and south sides of Farm District Road, approximately 800 linear feet east of its intersection with Jessica Lane. - This agenda item is a request for a Major Modification to the approved Friendly 5 Planned Unit Development (PD) Handbook. The modification includes: (1) revisions related to the proposed arterial roadway connection from the… p. 3
- 7.1.For discussion and possible approval of an amendment to the current Memorandum of Understanding between the City and Main Street Fernley to include coordinating the planning and design efforts for the Main Street Art Park. - Last year, the City of Fernley made substantial progress at the Main Street Art Park. This was done with the help of a $60,000 Community Development Block Grant (CDBG) balance that needed to be spent before the end of 2025, and the resourcefulness of Jessica Murdock. The concept that the Rotary envisioned served as the basis for the design. The improvements, which included three steel archways, nine new art installations, a new Main Street Art Park sign, ten benches, twelve self-watering planter boxes, plants and trees, and an asphalt path, were all completed in-house by the Public Works Department General Services crew. These improvements are Phase 1, aimed at… p. 3