Village of Chagrin Falls, OH · pop. 4K
Tue17Nov
Architectural Board of Review
Tue Nov 17 · 5 days ago
Agenda
This agenda in plain words
Leer en españolThis is a regular meeting of the Architectural Board of Review in Chagrin Falls, Ohio, on November 17, 2026, at 8:30 AM. The board reviews plans for changes to homes and buildings, and eight projects are on the list, including a new single-family home on Solon Road and several additions and window or siding changes.
- Review plans for a new window on the rear of the home at 60 South Franklin. Touches: 60 South Franklin. p. 1
- Review plans for new hardie board siding on the whole home at 122 Walnut. Touches: 122 Walnut. p. 1
- Final review of plans for an alteration and new rear addition at 42 East Orange. The agenda notes variances were granted. Touches: 42 East Orange. p. 1
- Preliminary review of a new second-floor addition over the attached garage at 166 South Franklin. The agenda says HSR is required. Touches: 166 South Franklin. p. 1
- Review plans for new replacement windows at 98 South Franklin. Touches: 98 South Franklin. p. 1
- Final review of a new rear porch and rear addition at 537 Coy Lane. The agenda notes variances were granted. Touches: 537 Coy Lane. p. 1
- Final review of a new single-family home on a vacant lot at 106 Solon Road. Touches: 106 Solon Road. p. 1
- Final review of a new rear addition, detached garage and exterior alterations at 177 South Main. Touches: 177 South Main. p. 1
- Approve the minutes of the November 3, 2026 meeting. p. 1
Words on this agenda, explained
- Architectural Board of Review
- A village board that checks whether plans for changes to buildings fit the village's design rules.
- Exterior Alt
- A change to the outside of an existing building.
- Prelim
- A first, early look at a project's plans before the final plans are reviewed.
- Final
- The last review of a project's plans before the board decides on them.
- Variances Granted
- Permission was already given to build something that breaks a normal zoning rule, such as a size or distance limit.
- HSR
- The agenda does not explain this term; it is a separate review that the project needs.
Written by AI from the agenda, Nov 14. Each point links to its page: read it there before you rely on it. Nothing here says how the board will vote.
2 items on this agenda match the land-use topicsVariances (2)