Agendalittlerock.govAgendaBoard CommunicationAgendaM-4 ORDINANCEAgendaRESOLUTIONAgendaBoard CommunicationAgendaRESOLUTIONAgendaBoard CommunicationAgendaRESOLUTIONAgendaBoard CommunicationAgendaRESOLUTIONAgendaBoard CommunicationAgendaORDINANCEAgendaBoard CommunicationAgendaZ-5519-B-StaffWriteUpAgendaZoning MapAgendaLand Use PlanAgendaSketch MapAgendaORDINANCEAgendaBoard CommunicationAgendaORDINANCEAgendaBoard CommunicationAgendaORDINANCEAgendaORDINANCEAgendaRESOLUTION
Minutesnot posted yet
Meeting page ↗littlerock.gov18 items on this agenda match the land-use topicsSite plans (6), Data centers & plants (5), Rezoning (5), Moratoriums (4), Comp plan (2), Variances (1)
Agenda items (30)Show all 30
- [ ] 1 Ordinance No. 2 3 an Ordinance to Establish a Temporary Six (6) Month 4 Moratorium on the Permitting and Approval of 5 Hyperscale Data Centers Within the City of Little Rock, 6 Arkansas, to Require Comprehensive Municipal Impact 7 Studies and Public Disclosures Regarding Municipal 8 Water, Wastewater, Noise, Emergency Infrastructure, 9 Zoning Regulations, and Monitoring Practices; to 10 Establish an Administrative Relief Procedure; to 11 Declare an Emergency; and for Other Purposes. 12 13 Now, Therefore, Be It Ordained by the Board of Directors of the 14 City of Litt… p. 1
- …nagement networks, emergency response services, and land-use resources. 4 d) Large-scale utility infrastructure necessary to support these hyperscale data centers requires 5 coordination with complex public and environmental entities, including but not limited to: 6 Entergy Arkansas capacity studies overseen by the Arkansas Public Service Commission; 7 Central Arkansas Water Systems regulated by the Arkansas Department of Health; the Little 8 Rock Water Reclamation Authority; and Arkansas Department of Energy and Environment. 9 e) The City has a compelling governmental interest in protecting t… p. 2
- …defined in the Little Rock Revised Code of Ordinances Chapter 36 Article I, Subsection 3 36-2, as currently enacted or as subsequently amended: 4 1. Data center. A facility used primarily for the storage, management, processing, and 5 transmission of digital data, which houses computer or network equipment, including 6 servers, switches, routers, and associated infrastructure such as air handling, cooling 7 equipment, backup power generation, fuel storage, water storage, electrical 8 substations, and other utility infrastructure necessary to support sustained operations. 9 2. Hyperscale data… p. 3
- [ ] 1 4) Site plan approvals; or 2 5) Other discretionary municipal approvals 3 for construction, development, redevelopment, or expansion of hyperscale data centers within 4 the corporate boundaries of the City of Little Rock. 5 b) To ensure administrative reasonableness and diligent progress: 6 i) The Board of Directors shall hold a public hearing before the end of the moratorium period. 7 The City Manager shall organize the public hearing at a regularly scheduled Board of 8 Directors meeting, providing public notice a minimum of fifteen (15) days in advance. A 9 representative fr… p. 5
- [ ] 1 3. Recommendations on whether the moratorium should be extended or terminated based on 2 study findings; and 3 4. Additional recommendations are necessary to protect public health, safety, and welfare. 4 Section 7. Administrative Relief Procedure. 5 (a) This Article provides a streamlined administrative pathway to verify routine, non-data-center 6 project exemptions and establishes a formal legislative process to evaluate petitions for moratorium 7 relief based on vested rights or constitutional claims. 8 (b) Streamlined Administrative Exemption Determination 9 1. The streamli… p. 8
- …rty rights under Arkansas common law and 6 as defined under Article 4(e)(4) prior to the effective date of this Ordinance; or 7 B. Application of the moratorium deprives the subject property of all economically viable use 8 without advancing a legitimate municipal police power objective regarding public health, 9 safety, or welfare. 10 (d) Judicial Review 11 1. Any applicant, property owner, or aggrieved party directly affected by a final 12 administrative decision of the Board of Directors regarding a Petition for Moratorium 13 Relief under subsection (c), or a final administrative exemption… p. 9
- …d of Directors of the City of Little Rock finds that active, 4 proposed, and anticipated land-use applications and utility commitments for hyperscale data centers pose 5 an immediate threat of irreversible allocation of municipal water reserves, wastewater capacities, and grid 6 reliability before the City can enact adequate regulatory performance standards. Approval or processing 7 of such ultra-large industrial facilities without comprehensive studies and standards will lead to 8 unmitigated continuous-operation noise, heightened emergency response risks, potential groundwater 9 degradation,… p. 10
- …NGINEER: Brooks Surveying 20820 Arch Street Pike Hensley, AR 72065 AREA: 0.16 acre NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF WARD: 1 CURRENT ZONING: PCD VARIANCE/WAIVERS: None requested. BACKGROUND: On June 30, 2016, the Planning Commission approved Udell Short-form PCD to rezone subject property from C-3 to PCD to allow the existing use to add auto paint, auto body rebuilding, and auto repair garage (Z-5519-A). The site historically contained a non-conforming auto related use. On June 2, 2016, the Board of Directors adopted Ordinance NO: 21,275-A to allow proposed uses. p. 1
- A. PROPOSAL/REQUEST/APPLICANT’S STATEMENT: The applicant is proposing to rezone the 0.16 acre site from PCD to PD-C to allow for the development of an auto sales business. p. 1
- B. EXISTING CONDITIONS: Subject property is located along the Asher corridor at the northwest corner of Asher Avenue and Washington Street. Properties in the general area contain a mixture of zoning and uses. The existing building was previously demolished. The site now contains a raised concrete slab only and is designated as commercial (C) on the City’s future land use plan. p. 2
- 1. A site development plan is required and must comply with the City’s minimal ordinance requirements. To include but not limited to constructed planters bordering west perimeter of property near structure and adjacent to the south and east perimeters of the proposed portable office building. p. 4
- H. ANALYSIS: The applicant is proposing to rezone the 0.16 acre site from PCD to PD-C to allow for the development of an auto sales business. Subject property is located along the Asher corridor at the northwest corner of Asher Avenue and Washington Street. Properties in the general area contain a mixture of zoning and uses. The existing building was previously demolished. The site now contains a raised concrete slab only and is designated as commercial (C) on the City’s future land use plan. Access to the site is shown to be from the alley extending east from Washington Street, along the nort… p. 5
- …are sufficient to serve the proposed use. The primary vehicle display area is shown to be along the Asher Avenue and Washington Street frontages. The site plan shows approximately eight (8) wheel stops will be placed approximately one (1) foot from the edge of the existing street rights-of-way. The applicant notes, approximately seven (7) to eight (8) vehicles will be displayed for sale at any given time. The following conditions must be met at all times during operation of the vehicle sales lot: p. 6
- September 9, 2026 ITEM NO.: 1 (Cont.) FILE NO.: Z-5519-B 7 Sight lighting must be low-level and directed away from adjacent properties. Staff are supportive of the proposed PD-C zoning. There are commercial uses located to the east and west of the proposed auto sales use. There are additional commercial zoning and uses north of the site and industrial zoning and uses to the south. The proposed site is along a heavily travelled principal arterial street (Asher Avenue). Staff feels the proposed use will have no adverse impact on surrounding properties. p. 7
- …unds, the City’s Parks & Recreation 16 Department seeks to make improvements to Southside Park access facilities as detailed in the Southside 17 Park Site Plan attached hereto as Exhibit A; and, 18 WHEREAS, Under Bid Event No. 244,911, the City solicited bids for this project and received three 19 (3) responsive bids for Southside Park’s Asphalt Project; and, 20 WHEREAS, vendor selection of Redstone Construction Group, LLC was made after determining the 21 bidder had the lowest, responsive, and responsible bid of One Hundred Thirty-Four Thousand Dollars 22 ($134,000.00) for the Southside Park… p. 1
- …SCRIBED AS LOT 14, BLOCK 10, RIFFEL AND HOLDER 15 2ND ADDITION TO THE CITY OF LITTLE ROCK, PULASKI 16 COUNTY, ARKANSAS. 17 Section 2. The preliminary site development plan/plat be approved as recommended by the 18 Little Rock Planning Commission. 19 Section 3. That the change in zoning classification contemplated for Progressive Auto Group 20 - PD-C located at 4500 Asher Avenue (Z-5519-B) is conditioned upon obtaining final plan approval 21 within the time specified by Chapter 36, Article VII, Section 36-454 (e) of the Code of Ordinances. 22 Section 4. That this Ordinance shall not take effect… p. 1
- …anning & Development Department Action Required: Ordinance Resolution Approved By: Delphone Hubbard City Manager SYNOPSIS The applicant requests to rezone the 0.16-acre property from PCD to PD-C to allow an auto sales business. FISCAL IMPACT None. RECOMMENDATION Staff recommends approval of the rezoning. The Planning Commission recommended approval by a vote of 11 ayes, 0 nays, and 0 absent. BACKGROUND The applicant is proposing to rezone the 0.16 acre site from PCD to PD-C to allow for the development of an auto sales business. The subject property is located along the Asher corridor at the… p. 1
- …are sufficient to serve the proposed use. The primary vehicle display area is shown to be along the Asher Avenue and Washington Street frontages. The site plan shows that approximately eight (8) wheel stops will be placed approximately one (1) foot from the edge of the existing street rights-of-way. The applicant notes that approximately seven (7) to eight (8) vehicles will be displayed for sale at any given time. The following conditions must be met at all times during operation of the vehicle sales lot: p. 2
4 more passages from inside the staff reports, forms and minutes attached to this agenda are not listed as agenda items. Search finds every word of them.