Spotsylvania County, VA · pop. 144K
Tue27Oct5:00 PM
Board of Supervisors
Tue Oct 27, 5:00 PM · 9104 Courthouse Rd, Holbert Building Board Room, Spotsylvania · 26 days ago
Board of Supervisors Meeting
Agendaspotsylvaniacova.api.civicclerk.comAgendaBOS AgendaAttachmentSDI Task Order 26-05AttachmentCover Page_Credits-TOC (Formatted DRAFT Final)AttachmentChapter 1 Introduction and Vision (Formatted DRAAttachmentChapter 2 Land Use (Formatted DRAFT Final)AttachmentSubchapter 2A Economic Development and Tourism (AttachmentSubchapter 2B Housing (Formatted DRAFT Final)AttachmentSubchapter 2C Production of Food Fiber SilvicultAttachmentSubchapter 2D Utilities (Formatted DRAFT Final)AttachmentChapter 3 Transportation and Thoroughfare Plan (AttachmentSubchapter 3A Trailways Master Plan (Formatted DAttachmentChapter 4 Public Facilities Plan (Formatted DRAFAttachmentSubchapter 4A Schools (Formatted DRAFT Final)AttachmentSubchapter 4B FREM (Formatted DRAFT Final)AttachmentSubchapter 4C Sheriff (Formatted DRAFT Final)AttachmentSubchapter 4D Solid Waste (Formatted DRAFT FinalAttachmentSubchapter 4E Water and Sewer (Formatted DRAFT FAttachmentStaff PresentationAttachmentStaff ReportAttachmentPlanning Commission MinutesAttachmentAdvertisementAttachmentDRAFT Approval Resolution - Tabernacle MethodistAttachmentDRAFT Denial Resolution - Tabernacle Methodist C
Minutesnot posted yet
Meeting page ↗spotsylvaniacova.portal.civicclerk.com3 items on this agenda match the land-use topicsComp plan (2), Site plans (1), Special use (1), Infrastructure (1)
Agenda items (21)Show only the 3 matching
- 1.Schools Performance and Accreditation Results, Dr. Clint Mitchell & 4E Program Information, Sue Venable-Shelton - Dr. Clint Mitchell would like to update the Board of Supervisors on current school performance and accredition results. Ms. Sue Venable-Shelton will present information regarding the schools 4E program. p. 1
- 1.Commendations Celebrating Sylvannah Baptist Church 159 Years of Faith and 47 Years of Pastoral Leadership for Reverend Dennis A. Woodard Sr., Senior Pastor and First Lady Mrs. Susie Woodard p. 1
- 1.Approval of the Minutes of the October 13, 2026 Board of Supervisors Meeting - The minutes are attached. p. 1
- 2.Approval of Contract Modification #6 for Renewal to Brown & Brown Insurance Agency of Virginia, Inc. for Property, Liability, Commercial Auto, and Supplemental Accident and Disability Insurance Services for FREM & Volunteer Personnel - The initial contract with Brown & Brown Insurance Agency of Virginia, Inc. was approved by the Board of Supervisors on September 22, 2020. This is the sixth and final renewal year for this contract. The annual premium for these insurance services is $290,252.25. p. 1
- 3.Approval of Modification 3 to E-Merge Systems, Inc. to Provide Supervisory Control and Data Acquisition (SCADA) Services - The County is riding the cooperative contract held by Prince William County Service Authority (PWCSA) to provide task-order-based SCADA services. The initial contract was previously approved by the Board in March 2023. Modification 3 to E-Merge Systems, Inc. is to continue to utilize this cooperative PWCSA Contract #SA 2216 for another one-year term, which includes their yearly updated labor rates. This contract may be renewed for one (1) additional one-year term at the option of the County. p. 1
- 4.Approval of Modification 12 Renewal 4 to County Waste, LLC dba GFL Environmental for Front Load Refuse and Single Stream Service - GFL is responsible for providing all front-load refuse collection and single-stream recycling services for County facilities and school locations. The solicitation for these services was conducted as a joint procurement with the schools, which entered into their own contract with GFL. The initial contract for these services was approved by the Board of Supervisors on September 14, 2022. Since the initial approval, contract modifications have been made to accommodate changes in service locations, including the addition and removal of locations as operational needs have changed. This is the fourth and final renewal for this contract. p. 1
- 5.Approval of Modification to Wallace, Montgomery & Associates, LLP for Transportation Engineering Services - A Request for Proposal (RFP) was issued by the Spotsylvania County Procurement Division to solicit proposals from qualified firms to provide professional transportation engineering services. Fifteen (15) proposals were received and evaluated by a Selection Committee, which shortlisted firms for interviews. Following the interview process, awards were made across multiple categories. The original contract and three renewals were previously approved by the Board of Supervisors. The current request is for approval of one (1) contract modification to add a sub-consultant to the existing contract with Wallace, Montgomery & Associates, LLP. p. 1
- 6.Approval of Purchase Orders to eTec Mechanical Corp. and The Gordian Group for the Holbert Building IS HVAC Upgrade - This project involves replacing the existing HVAC systems serving the Holbert Building’s Server Room due to aging equipment and insufficient cooling capacity. The project includes installing redundant, variable-capacity heat pump systems, ductless indoor units, associated ductwork, refrigerant and condensate systems, and DDC controls integrated with the existing Trane system. Work also includes demolition of existing equipment, replacement of ceiling tiles and grid, and repairs and painting of affected areas to ensure reliable cooling for critical server and electrical equipment. p. 1
- 7.Approval of a Sole Source Purchase from the Nature Conservancy for Non-Tidal Wetland Mitigation Credits Required for Level 1 Reuse Conveyance System Phase 4 - Level 1 Reuse Conveyance System Phase 4 requires non-tidal wetland mitigation credits to compensate for permitted wetland impacts. The Utilities Department was able to identify a single source able to provide credits within the project’s Hydrologic Unit Code and requests to purchase the credits from The Nature Conservancy in an amount not to exceed $480,350.00. p. 1
- 8.Approval of Task Orders 26-03, 26-04, & 26-05 to TRC Engineers, Inc. for Groundwater Monitoring Services at Chancellor, Livingston and Berkeley Landfills - These three task orders will provide groundwater monitoring engineering services for the Chancellor, Livingston and Berkeley landfills. The consultant shall perform mandated monitoring, correction action oversight, laboratory services and related reports/deliverables required by the Department of Environmental Quality. p. 1
- 9.Approval of Task Order 26-05 to Sullivan, Donahoe & Ingalls, PC for Gordon Road DPU Facility Site Plan Services - The County plans to develop a Community Operations Complex on approximately 35 acres of Utility Enterprise–owned land at 10826 Gordon Road. The first phase will include designing pad sites and site improvements for a Department of Utilities administration and operational support facility. This Task Order, capped at $382,823.00, covers site design, regulatory review, bidding, and limited construction administration. p. 2
- 10.Approval of Task Order 26-07 to Sullivan, Donahoe & Ingalls Professional Consulting for Engineering & Surveying Services for Reuse Waterline Projects to Include Utility As-Builts and Construction Administration Support - The services under the Task Order consist of providing general engineering and surveying consulting services for the Reuse waterline projects to include as-built plans and construction administration for the projects. This task order, in the amount of $376,720.00, includes a total of eight design packages for which an as-built survey will be performed by collecting field survey and GPS points. p. 2
- 11.Authorization for Public Hearing to Consider Amending Sec. 2-5 to Allow the County to Impose a Fee for the Return Without Payment of Electronic Payment Orders and Otherwise Bring the Ordinance into Compliance with Virginia Code Section 15.2-106 p. 2
- 12.FY 2026 Carryover Budget Adjustment and Appropriation - At the close of each fiscal year, departments submit requests to carry forward funding from the previous Fiscal Year (FY 2026) to the current Fiscal Year (FY 2027). The carryover process is not meant to be a second budget process, create contingency funding within a department budget, or be used for ongoing expenses such as personnel or general operating expenses. Carryover requests must meet at least one of the two following criteria and should be for specific goods, services, or equipment acquisitions. 1. Obligated in FY 2026 – The request reflects an expenditure that was included in the FY 2026 Budget and was obligated (encumbered via contract, purchase order, or equivalent) but not expended before the close of FY 2026. 2. Grant Funded, Restricted, Committed – The request reflects an expenditure that was grant funded,…
- 1.SUP26-0005 Tabernacle Church-All Thingz Academy (Tabernacle Methodist Church / All Thingz Academy) (Chancellor Voting District) - The applicant requests a special use permit to allow for the enrollment expansion of an existing private school operating under Conditional Use Permit CP94-08 from 60 to 100 children, on an approximately 3.29-acre parcel zoned Residential 1 (R-1) District. The property is addressed 7301 Old Plank Road and is located across the intersection of Old Plank Road (Route 610) and Rocky Run Road (Route 2409). The property is located within the Primary Development Boundary and is designated as “Low Density Residential” on the Future Land Use Map of the Comprehensive Plan. Tax Parcel 21-A-129. Chancellor Voting District. p. 2
- 2.…A general summary of the proposed revisions/updates is as follows: The proposed revisions within the 2026 Comprehensive Plan update/amendment include but are not limited to: updates/amendments to factual data, information, subsections, charts, tables, maps, studies, and appendices to account for changing and present circumstances and conditions; updates/amendments to future projections, information, subsections, guidelines/models, charts, tables, maps, and appendices, as may be appropriate; and, the below described updates/amendments and/or restructuring of chapters, subchapters, and appendices within the plan: Chapter 1: Introduction and Vision : added language regarding the interrelationship between the Comprehensive Plan and the Capital Improvement Plan (CIP); update/amendment to the visi
- 1.Vote Only - Soild Waste Ordinance Changes (PH from 10/12) p. 2
- 2.Legislative Priorities for Consideration 2027 - Attached legislative priorities are for consideration for the Board's consideration.
- 3.Understanding the Local Composite Index (LCI) - The Local Composite Index (LCI) is the Commonwealth of Virginia’s formula for determining how state and local governments share responsibility for funding K–12 public education. It reflects a locality’s relative ability to support its required Standards of Quality (SOQ) programs and determines the local percentage of education funding. For the current biennium, Spotsylvania County’s LCI is 37.83%, meaning the county must fund 37.83% of its SOQ costs, with the state contributing the remaining 62.17%. A lower LCI results in greater state support; a higher LCI shifts more funding responsibility to the locality. Because the LCI is a complex, data‑driven calculation that incorporates numerous economic and demographic factors, it can be difficult to interpret. The goal of this presentation is to help the Board and public better understand how…
- 1.Closed Meeting - n/a
- 1.Next Board of Supervisors Meeting is November 17, 2026 at 4:00 p.m. (Modified Start Time) p. 2