- a.This is an opportunity for attendees to provide public comment on matters that are not on the agenda. Attendees desiring to provide public comment on specific items on the agenda may do so at the time that agenda item is brought up. Zoom attendees wishing to speak should type their name, address, and the relevant agenda item in the Q&A feature within the online meeting platform. Zoom attendees may also register in support or opposition of an item through the Q&A feature. In person attendees should fill out a public comment form and turn into the meeting chairperson. When you are called upon to speak, state your name, address, and provide your public comment. Please adhere to the 3-minute time limit. Written comments will not be read into the record during the meeting but may be sent to public.works@mcfarland.wi.us to be included with the agenda materials. p. 1
- a.Motion to approve the minutes of the July 7, 2026, Parks & Recreation Committee meeting. p. 1
- a.Discussion and action regarding McFarland Soccer Club's request for sponsorship on goals. - Soccer is proposing adding sponsor logos to field signage that will be attached to the goals. Each field needs to be labeled, and while our current fields are identified by age group (U10, U11, etc.), they are planning to transition to a simpler format for the new complex (Field 1, Field 2, etc.), which will require new signage. Soccer is requesting the ability to create a sponsorship opportunity for local businesses to have their logo included on these signs. The goal is to help offset costs associated with new goals, the field transition, and increased operating expenses. This request was previously introduced to the committee during their April 22nd meeting. Staff are recommended approval of Soccer's request for the 2026 fall season and we will review the policy and ordinance for the spring… p. 1
- b.…Village Board regarding the proposed McFarland 2027-2031 Capital Improvement Plan - Enclosed is the draft 2027-2031 Capital Improvement Plan helping to plan out a multitude of projects, plans, designs, equipment, and various capital needs. This was introduced to the committee at their July 7th meeting. Extracted from that Plan for this Committee's specific review is Appendix D, which is the Park System Capital Improvement plan. This looks at the parks projects that are proposed from year to year. This is the main focus of the Committee's review and recommendation. Please note the following key features of this document: Transmittal Memo - A memorandum is included as part of the transmittal that helps to concisely summarize major issues and initiatives contained within the plan. It will also outline the process to create the plan and provide some historical data on how this proposal… p. 1
- c.Discussion regarding a trail replacement plan - Annually in the budget, funds are allocated to replace and maintain the bike trails within the Village. Staff has rated all the existing bike trails within the village. They used the same PASER rating system the State of Wisconsin DOT uses to rate all roads in the state. The rate system is on a 1 to 10 scale, with 10 being brand new or new condition and 1 being the poorest condition. Once we rated the trails, we then prioritized them into then type of work needed to extend the life of each trail or if they need to be replaced. Crack filling, fills the cracks to prevent water from penetrating into the asphalt and allowing frost to break the pavement up more. Seal coating is used to prevent the asphalt from drying out and shrinking from the UV rays of the sun. Replacement is needed when the pavement condition is beyond treatment to prolong…
- d.Update regarding Community Park - In November 2025, the bid from McKee and Associates was accepted for Phase 2, which broke ground in December 2025. An update was provided to the Committee in January 2026, which included the following update: During excavation, unfavorable soils were discovered and replaced prior to foundation work. The foundation and underground utilities have now been installed and are currently curing. Additionally, well drilling has been contracted, and the septic system design has been submitted to the State for approval. The foundation will be back-filled by the first of the year and construction can begin. Electrical service has been ordered from Alliant Energy. Currently, the project is about 2 weeks behind schedule, but they should be able to make that time up in the spring without any further weather delays this winter. Another update was provided to the…
- a.Tuesday, September 1, 2026, at 6:30 p.m. p. 1