Village of Brown Deer, WI · pop. 13K
Wed5Aug
Beautification & Public Works Committee
Wed Aug 5 · 4 months ago
Beautification & Public Works Materials
1 item on this agenda matches the land-use topicsSubdivisions (1)
Agenda items (7)Show only the 1 matching
- A) Consider Approval of the Professional Services Agreement with Ruekert-Mielke for Construction Admin & Staking Engineering Services for the N. 47th Street Culvert Replacement Project. p. 1
- B) Consider Approval of the Professional Services Agreement with Ruekert-Mielke for Survey & Design Engineering Services for the AC Hanson Park/N. Maura Lane Drainage Ditch Improvement Project. p. 1
- A) Re-Consider Approval for the Purchase of a new Kubota Extended Bed Equipment & Re-Allocation of Remaining 2026 CIP Funds for Village Hall A/C Chiller. Staff recommended reallocating funding originally planned to replace the A/C Chiller replacement at Village Hall due to the increased and now unbudgeted cost we received. Replacement of the A/C Chiller will be deferred into future years and included in next year’s CIP. Instead, staff are recommending repairing the A/C Chiller and spending the remaining balance on a new Kubota Extended Bed for DPW summer operations. It was moved by Mr. Loebach… p. 3
- …ORT DATE: August 4, 2026 MANAGER'S REVIEW/COMMENTS: No additional comments to this report. See additional comments attached. RECOMMENDATION: Consider Approval of the Professional Services Agreement with Ruekert-Mielke for Construction Admin & Staking Engineering Services for the N. 47th Street Culvert Replacement Project. EXPLANATION: As the design engineer of record, a task order is requested to be entered into with R&M for construction admin (i.e. shop drawing reviews, pay requests, design modifications, etc.) and construction staking services. The project is being funded as follows: Expense… p. 4
- …culvert outfall that is currently designed to outfall through proposed wingwall, attendance at preconstruction meeting, review and processing of any change order requests, review payment applications, answer Contractor questions, and coordinate compliance with WDNR waterway permit including closing out the permit. • Field Survey: Provide 3 stakeout visits (assume 3 days of 1-person survey or 3 (1/2) days of a 2-person survey crew) including culvert stakeout, paving stakeout and asbuilt survey/miscellaneous. Provide asbuilt record drawing and GIS shapefile. • Construction Review Services: Prov… p. 5
- …ORT DATE: August 4, 2026 MANAGER'S REVIEW/COMMENTS: No additional comments to this report. See additional comments attached. RECOMMENDATION: Consider Approval of the Professional Services Agreement with Ruekert-Mielke for Survey & Design Engineering Services for the AC Hanson Park/N. Maura Lane Drainage Ditch Improvement Project. EXPLANATION: During the last large rain event in April of this year, we had a resident on N. Maura Lane express concerns regarding a ditch drainage issue. I investigated this and realized that the drainage ditch from AC Hanson Park down to the Brandybrook detention po… p. 7
- 3. Client's Responsibilities • Provide easements and permission to enter rear properties of homes along ditch. • Responsible for any additional local approvals. • Provide copies of any geotechnical information or storm water management plans from the adjacent subdivision for the N Brandybrook Trail storm water facility. p. 8