Town of Munster, IN · pop. 24K
Mon20Jul6:30 PM
Town Council
Mon Jul 20, 6:30 PM · 1005 Ridge Road, Munster · 4 months ago
Town Council Meeting
Agendamunsterin.api.civicclerk.comRecording ▸munsterin.portal.civicclerk.com
Minutesnot posted yet
Meeting page ↗munsterin.portal.civicclerk.com1 item on this agenda matches the land-use topicsWater & sewer (1)
Agenda items (10)Show only the 1 matching
- a.Treasurer's Report, May 2026 p. 1
- b.Minutes July 6, 2026 - The minutes of the July 6, 2026, Town Council meeting are attached for approval.
- c.Water Leak Adjustment - At the April 8, 2013, meeting, the Council adopted a policy to allow water bill adjustments due to water leaks. Under the policy, the customer must sign an affidavit stating there was a leak, the leak has been repaired, and request an adjustment from the Water Board. Adjustments are allowed once per 12-month period. The adjustment is based on an average of the usage over the previous twelve months. Staff has received a request for an adjustment under this policy. The customer has completed the required form and the request meets all the criteria for an adjustment. The average usage for this customer is 7,000 gallons/month and the period in question had 35,000 gallons (2 months). The original bill amounts totaled $266.04. The requested adjustment amount is $140.32 which represents water usage and sales tax. With the adjustment, the amount due for water and tax…
- d.Voucher Registers - Approval and confirmation of invoices
- a.2026 Capital Asset Reporting Engagement Letter - Every year, the Town is responsible for updating its capital asset information for financial reporting purposes. During the past several years, Peterson Consulting Services, Inc. of LaGrange, Illinois, has assisted the Town in implementing the Governmental Standards Accounting Board (GASB) Statement No. 34 which prescribes financial reporting requirements for state and local governments to make annual reports more thorough and easier to use. Staff recommends continuing the engagement of Peterson Consulting Services, who would reexamine the provisions of the GASB Statement No. 34 regarding capital assets, offer suggestions pertaining to the reporting of asset additions and retirements, provide input on the reporting of construction-in-progress (CIP), aid in capitalizing CIP, formulate year-end capital asset worksheets and summary…
- b.Spray-in-Place Pipe Lining Contract Approval - This item is for the Town Council to approve a contract award for Spray-in-Place Pipe lining (SIPP). As an alternative to water main replacement, public works recommends utilizing the SIPP method for the Oakwood Avenue water main project. Traditional water main replacement requires excavating a trench the length of the pipe, replacing the pipe, and then backfilling. This involves heavy equipment, can impact traffic patterns, and incurs costs to bring the area back to previous or better standards. Spray-in-Place Pipe lining is a trenchless process where crews clean and coat the inside of existing pipes with a structural epoxy, greatly extending the life of the pipe by decades. This is intended to be a pilot program that will serve as a cost-effective alternative for future projects. The Town solicited proposals through a Request for…
- c.…While this sediment buildup is not harmful, it adds weight to the tank, reduces water capacity in the tank, and has to be filtered out of the water as it reenters the system. A mud valve is a valve that is installed at the base of the tank so you can periodically drain the sediment that collects there without having to drain the entire tank, improving water quality. Utility Service Co., Inc. currently works under a Master Services Agreement (MSA) and is capable of performing this work as an amendment to Scope of Work No 5, the washout project. This amendment is for $10,000. The work will begin in 2027 when the White Oak and Fisher water tower is scheduled for a washout per state requirements and will not affect any services. This was an unfunded project. The funds have been budgeted for in the Water Bond.
- d.Water Loss Audit - This item is for Town Council to consider engaging M.E. Simpson to perform a Water Loss Audit. To better understand non-revenue water, the Indiana Legislature adopted IC 8-1-30.8, which obligates water utilities to complete annual water audits. A Water Loss Audit looks at operational and financial data of the entire Water Utility. The goal is to identify areas of water loss to conserve this resource and to determine areas to improve. In odd-numbered years, the audit must be performed, validated, and submitted to the Indiana Finance Authority. In addition, the legislation requires water loss audits to be validated by a certified, third-party water audit validator (“Certified Validator”) and submitted to the Indiana Finance Authority (IFA) for compilation into a biennial report to the General Assembly. If this is not done, the Town is not eligible to participate in the…
- e.Air Emissions Testing Services - Last year, Clarke Energy replaced the existing Jenbacher Engine at the landfill due to diminishing landfill gas production and the age of the old unit. The conditions of the Town’s landfill permit and the Indiana Department of Environmental Management testing requirements necessitates the Town conduct performance testing within 180 days of startup and every 8,760 hours of operation or three years, whichever occurs first, to demonstrate compliance with application air pollutant emission limits and/or standards. Andrews Engineering, Inc. provided the attached proposal from Impact Compliance & Testing to perform this work. The scope of work includes air emission testing and analyses, project management and reporting, and report preparation for submittal to the USEPA. The cost for this service is $15,300.
- f.Legal Services Agreement - When the law firm of Westland & Bennett stepped down as the Town's legal counsel, they were actively involved in various ongoing lawsuits, workers' compensation cases, and the prosecution of ordinance violations. It would be prudent to have Westland & Bennett continue representing the Town in these matters until they are resolved or until another law firm is appointed to take over these cases. Westland & Bennett has expressed their willingness to continue representing the Town in the remaining issues they were handling. A proposal from Westland & Bennett is attached for your consideration.