- …, an ad hoc Joint Committee of the Board of Supervisors and the School Board met on June 11, 2026, at the Campbell County Technical Center to discuss procurement options and budget needs for the Altavista Combined School (ACS) renovations. After a detailed discussion of procurement options, the Committee voted to recommend to both Boards that they use the Construction Management process to design and construct renovations to ACS. The committee felt this would provide the most control over the process since the architect would be under contract working directly for the owner. The Committee furt… p. 2
- After a detailed discussion of procurement options, the Committee voted to recommend to both Boards that they use the Construction Management process to design and construct renovations to ACS. The committee felt this would provide the most control over the process since the architect would be under contract working directly for the owner. The Committee further recommended that the current contract with RRMM be extended to retain them as the architect for this project. Next, the Committee discussed the scope of work and how the items identified as options in RRMM’s study were improvements that… p. 3
- y yy, pgpy completed by our on-call engineering firm. Upon review of the County’s preliminary site plan, the only point where the grades need to tie in with the adjacent Augusta Springs development is the connecting road behind the building. It is standard practice for a site to be balanced, meaning no soil would be moved on or off the site during construction. Utilizing the topographic survey, a rough grading plan has been developed based on the preliminary site plan prepared for the rezoning application. This plan shows the site can be graded to accommodate an EMS facility for housing rescue… p. 4
- …approve the attached resolution in order to receive the funds. In January 2026, the Virginia Department of Housing and Community Development (VDHCD) awarded the CCTSC a grant of $75,000 to support its planning activities for Building Two on the campus. The CCTSC was the applicant; however, it is customary for VDHCD to utilize the locality to administer the funds. It is recommended that the Board of Supervisors authorize Economic Developmen p. 6
- Rustburg, VA. Following this grant award, staff worked with a joint committee to develop a prioritized list of amenities to be included in the final design. The grant requires that at least one 55-acre industrial development site be situated on one of the four (4) Campbell County-owned parcels involved in this project. To incorporate all these elements in a plan for this property, a civil engineering firm was solicited to develop a master plan to be developed in phases and evaluate the existing environmental conditions. A Request for Proposal (RFP) was published on May 14, 2026, through the Co… p. 7
- d. Authorize staff to negotiate and award the contract to Westwood Professional Services for Seneca Park Master Planning and Due Diligence, and to execute any required documents associated with the contract. APPOINTMENTS Attached for your review is a list of appointments. APPOINTMENTS.PDF MATTERS FROM THE BOARD A few minutes are scheduled at each meeting to discuss matters from the Board. MATTERS FROM THE BOARD.PDF CLOSED MEETING None PUBLIC HEARINGS Kate NReuschPlanner Documents: 4.V. 5. Documents: 6. Documents: 7. p. 7
- CLOSED MEETING None PUBLIC HEARINGS Kate N. Reusch, Planner PL-26-055 REZONING REQUEST – COUNTYWIDE Due to new legislation from the General Assembly that allows manufactured housing in all residential districts and that jurisdictions have at least one (1) zoning district that allows parcels with a 3,000 sq. ft. lot size, staff is recommending that the existing Residential – Manufactured Housing (R-MH) zoning district be updated to reflect these changes. This is a concurrent rezoning request to reflect the proposed changes to Chapter 22 – Zoning. There are currently 155 parcels containing appro… p. 8