Board of Public Works Meeting
Agendafortwaynein.api.civicclerk.comMinutesfortwaynein.api.civicclerk.comRecording ▸fortwaynein.portal.civicclerk.comMeeting page ↗fortwaynein.portal.civicclerk.com
Agenda items (27)
- 1.Approval of Board of Public Works Minutes for the week of May 19, 2026.
- 2.Approval of Resolution #0763D, Alley R00724 E-W: Kinsmoor Ave, Nuttman Ave, Beaver Ave and Broadway. p. 1
- 3.Approval of the Amended Resolution #0915A, West Cook Rd Concrete Repairs. p. 1
- 4.Approval of Resolution #1083A, 2026 Asphalt Crack Sealing. p. 1
- 5.Approval of Resolution #113-6-2-26-1, City Utilities Well to Water Recovery Fund & Conversion from Private Well to Public Water. p. 1
- 6.Approval of Resolution #113-6-2-26-2, Hoagland Lift Station Discharge Piping Emergency Repair. p. 1
- 7.Approval of Resolution #113-6-2-26-3, Acceptance of Sanitary Sewer Facilities into the City's Public Sanitary Sewer System located near Sherman Blvd & West 801 Coliseum Blvd. p. 1
- 8.Approval of the Perpetual Sidewalk Easement Agreement between Fort Wayne Bhajan Society and the City of Fort Wayne for a sidewalk located at 220 East Till Rd. p. 1
- 9.Approval of Change Order #1 & Final between the City of Fort Wayne and Vino Concrete for Contract #0788D, Alley East/West: Nuttman Ave, Dayton Ave, Fairfield Ave and South Wayne Ave. This change order increases the original contract price by $6,828.06 to a final contract price of $121,839.56 and extends the completion date by 187 days. p. 1
- 10.Approval of Change Order #1 & Final between the City of Fort Wayne and Fox Contractors, and acceptance of the work performed for contract #67592, Tract 6 South Watermain Replacement, upon the recommendation of City Utilities and Engineering. The final change order increases the original contract price by $67,693.65 to a final contract price of $896,756.65 and extends the completion date by 45 days. p. 1
- 11.Approval of Amendment for Owner-Contractor Agreement Resolution #112-12-9-25-7, City Utilities 2026 On-Call Asphalt Restoration Services between the City of Fort Wayne and Robbco and T-E Incorporated with a total not to exceed amount of $800,000.00 across both contractors. p. 1
- 12.Approval of Amendment for Owner-Contractor Agreement Resolution #112-12-9-25-8, City Utilities 2026 On-Call Concrete Restoration Services between the City of Fort Wayne and Exterior Service, Malott Contracting, and Pulver Asphalt Paving with a total not to exceed amount of $400,000.00 across all contractors. p. 1
- 13.Approval of Water Contract #2025-W-0357, 220 East Till Rd between the City of Fort Wayne and Fort Wayne Bhajan Society to construct a local water system. This project is privately and publicly funded and located inside the City. Contract value is $63,606.70. p. 1
- 14.Approval of recommendation from Flood Control to award Contract #0880P, Flood Buyouts Demolition: 2113 Strathmore St to Yard Jobs in the amount of $16,100.00. p. 2
- 15.Approval of recommendation from Right of Way to award Contract #1093S, 2026 Community Development Right of Way Miscellaneous Package to Key Concrete in the amount of the total sum price of $90,896.00 with a not to exceed $1,000,000.00 total cost. p. 2
- 16.Approval of recommendation from Fort Wayne City Utilities Engineering to award Contract #67614, Plant 2 Stuffing Box and Shaft Replacements Phase 2 to Campos Excavating in the amount of $277,675.00. p. 2
- 17.Approval of Owner-Contractor Agreement #77467, 2025 Cured in Place Pipe Package 1 Small & Medium Diameter between the City of Fort Wayne and Inliner Solutions in the amount of $3,938,475.00. p. 2
- 18.Acceptance of the work performed by Malott Contracting for Contract #0870D, Alley North/South: Senate Ave, Congress Ave, Spatz Ave and South Park Dr upon the recommendation from Transportation Engineering Services as an integral part of the City’s transportation system. p. 2
- 19.Acceptance of the work performed by Specialties Company for Contract #0932P, 2025 Guardrail & Attenuator Package upon the recommendation from Right of Way. p. 2
- 20.Acceptance of the work performed by American Dirtworks for Contract #2024-S-0176, The Reserves at Maplewood upon the recommendation from City Utilities Engineering as an integral part of the City's sanitary sewer system. p. 2
- 21.Acceptance of the work performed by Pinpoint Directional Drilling for Contract #2024-S-0177, 8300 - 9200 Eby Rd upon the recommendation from City Utilities Engineering as an integral part of the City's sanitary sewer system. p. 2
- 22.Approval of Civil City Payroll Claims in the net amount of $4,180,905.02 for the pay period ending May 16, 2026.
- 23.Approval of City Utilities Payroll Claims in the net amount of $846,293.40 for the pay period ending May 16, 2026. p. 2
- 24.Approval of Civil City Accounting Claims in the amount of $2,226,199.79 for the week of May 20, 2026. p. 2
- 25.Approval of City Utilities Accounting Claims in the amount of $3,183,251.70 for the week of May 26, 2026. p. 2
- 26.Approval of Civil City Accounting Claims in the amount of $7,111,072.09 for the week of May 28, 2026. p. 2
- 27.Approval of City Utilities Accounting Claims in the amount of $4,011,165.94 for the week of June 2, 2026. p. 2