Town of Ithaca, NY · pop. 22K
Tue15Sep
PB -SWX Prelim Site-Sub- mtg
Tue Sep 15 · 2 months ago
8 items on this agenda match the land-use topicsSite plans (7), Subdivisions (6), Planned developments (1), Variances (1)
Agenda items (10)Show only the 8 matching
- 1 To: Planning Board Members From: Christine Balestra, Senior Planner Date: September 8, 2026 RE: Proposed SouthWorks Woods Project – Continuation Consideration of Preliminary Site Plan/Subdivision Approval Enclosed please find the following additional materials for the SouthWorks Woods project: p. 1
- 1. Draft Preliminary Site Plan/Subdivision resolution. p. 1
- 6. Revised subdivision plat, showing a 60-ft right of way at Road B/Drive V (per town request). The Planning Board will continue to consider Preliminary Site Plan/Subdivision approval for the Woods project at the meeting on September 15th. Please feel free to email me at cbalestra@townithacany.gov or call me at (607) 273-1721, ext. 121, if you have any questions. Att. CC: Daniel Bellgraph, Beacon Communities Development LLC James Gensel, Fagan Engineers & Land Surveyors PC Rob Lewis, Shift Chainworks Owner I LLC p. 1
- PROPOSED RESOLUTION: Preliminary Site Plan, Subdivision Approval The Woods at SouthWorks Residential Development NYS Route 96B/Danby Road Tax Parcel No. 40.-3-3 Town of Ithaca Planning Board September 15, 2026 WHEREAS: p. 2
- 1. This action is the consideration of Preliminary Site Plan and Preliminary Subdivision Approval for the SouthWorks Woods project located off NYS Route 96B/Danby Road, in Town of Ithaca Planned Development Zone No.16. The SouthWorks Woods mixed-income residential project comprises a 6.09-acre portion of the overall SouthWorks (formerly Chain Works District) Redevelopment Project and involves the construction of eight residential buildings with a total of 130 mixed-income apartments, including a community room, lounge, fitness center, offices, maintenance areas, and storage. The Woods project… p. 2
- 5. At a Public Hearing held on August 18, 2026, the Planning Board reviewed, and accepted as adequate additional project information, including a letter from Fagan Engineering, dated July 7, 2026 (updated August 18, 2026), regarding stream setback mitigation; a letter from SWBR, dated August 10, 2026, regarding cladding materials in compliance with Town Code §271-17 (F)(6)(d); a letter from Beacon Communities, LLC, dated August 10, 2026, regarding Center for Community Transportation/TCAT Engagement; and revised site plan materials noted in #4 (most recent revision date of August 10, 2026); p. 3
- …e significant county- wide or inter-community impact; NOW, THEREFORE BE IT RESOLVED: That the Town of Ithaca Planning Board hereby grants Preliminary Site Plan and Preliminary Subdivision Approval for the proposed The Woods at SouthWorks, as described in the materials listed in Whereas numbers 4, 5, and 6 above, subject to the following conditions, to be met: Before final site plan/final subdivision approval: p. 3
- a. Receipt of any necessary variances from the Zoning Board of Appeals, p. 3
- b. All proposed bike storage and racks for the project (additional storage near mansion apartments). p. 1
- …24, 2026, regarding soil vapor intrusion mitigation; correspondence between the applicant and Marty Moseley, Director of Code Enforcement, regarding fire apparatus configuration and Code requirements; a letter from Fagan Engineers & Land Surveyors, D.P.C., dated July 20, 2026, regarding Transportation Demand Management (TDM) plans; two letters from LaBella Associates, one dated June 29, 2026, regarding traffic assessment, and one dated August 3, 2026, regarding traffic signal warrant and left-turn lane assessment; a Stormwater Pollution Prevention Plan, prepared by Fagan Engineers & Land Surv… p. 2