Town of East Fishkill, NY · pop. 30K
Thu11Dec
Town of East Fishkill meeting
Thu Dec 11 · 11 months ago
Meetings
2 items on this agenda match the land-use topicsMoratoriums (1), Site plans (1)
Agenda items (2)Show only the 2 matching
- …orizing the 2026 Dog Redemption Fee and Contract with Hudson Valley Animal Rescue and Sanctuary (4) Set Public Hearing for January 15, 2026 to Extend Moratorium for Building (5) Approve 2026 Salary Schedule (6) Authorize Promoting a Laborer to MEO - Highway Department (7) Authorize Hiring of Interns for Winter Break (8) Approval of Permanent Appointment - Deputy Town Comptroller (9) Authorize Request for NYSDOT Permit for the Loop Trail along Rt 376 (10) Authorize Request for NYSDOT Permit for the Pedestrian Crosswalk at Unity Street (11) Award Pinewood Knolls Water Main Interconnection Electr… p. 2
- H. Site plan application. For a battery energy storage system, site plan approval shall be required. Any site plan application shall include the following information plus all other site plan requirements found throughout the Town Code: (1) Property lines and physical features, including roads, for the project site. (2) Proposed changes to the landscape of the site, grading, vegetation clearing and planting, exterior lighting, and screening vegetation or structures. (3) An electrical diagram detailing the battery energy storage system layout, associated components, and electrical interconnecti… p. 6
7 more passages from inside the staff reports, forms and minutes attached to this agenda are not listed as agenda items. Search finds every word of them.