City of Statesboro, GA · pop. 33K
Tue7Jul
City of Statesboro meeting
Tue Jul 7 · 5 months ago
Meetings
Agendastatesboroga.govMinutesstatesboroga.govAgendaCopy document linkPacketCopy document linkMeeting page ↗statesboroga.gov
4 items on this agenda match the land-use topicsSubdivisions (2), Infrastructure (2)
Agenda items (8)Show only the 4 matching
- 8. Consideration of a motion to approve Resolution 2026-32: A Resolution approving a FEMA Hazard Mitigation Grant Program Recipient-Subrecipient Agreement for a hydrologic and hydraulic study of Little Lotts Creek basin. p. 1
- 9. Consideration of a motion to approve Resolution 2026-33: A Resolution accepting the street rights of way of Pasture Lane and Branded Way within the Westside Townhomes Subdivision as public streets to be owned and maintained by the City of Statesboro. p. 1
- 12. Consideration of a motion to approve an amended contract to renew the Master Services Agreement with Atlas Technical Consultants, LLC to provide Capital Improvement Program Management Services and Construction Engineering and Inspection services for FY 2027 in a not-to-exceed amount of $645,552.50 funded by TSPLOST, SPLOST, and Stormwater Funds. p. 2
- 13. Consideration of a motion to approve a contract with Pape-Dawson Consulting Engineers, LLC, for $256,750 to provide engineering design services for the ENG-130 Brannen Street to US Hwy 80 Transportation Improvements project, funded by 2023 TSPLOST funds. p. 2
- 8. Consideration of a motion to approve Resolution 2026-32: A Resolution approving a FEMA Hazard Mitigation Grant Program Recipient-Subrecipient Agreement for a hydrologic and hydraulic study of Little Lotts Creek basin. Result: Approved 4-0 p. 2
- 9. Consideration of a motion to approve Resolution 2026-33: A Resolution accepting the street rights of way of Pasture Lane and Branded Way within the Westside Townhomes Subdivision as public streets to be owned and maintained by the City of Statesboro. Result: Approved 4-0 p. 2
- 12. Consideration of a motion to approve an amended contract to renew the Master Services Agreement with Atlas Technical Consultants, LLC to provide Capital Improvement Program Management Services and Construction Engineering and Inspection services for FY 2027 in a not-to-exceed amount of $645,552.50 funded by TSPLOST, SPLOST, and Stormwater Funds. Result: Approved 4-0 p. 2
- 13. Consideration of a motion to approve a contract with Pape-Dawson Consulting Engineers, LLC, for $256,750 to provide engineering design services for the ENG-130 Brannen Street to US Hwy 80 Transportation Improvements project, funded by 2023 TSPLOST funds. Result: Approved 4-0 p. 2